Search Documents

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • TMS
    Manufacture of High Nitrogen Austenitic Stainless Steels by Pressurized Electroslag Remelting

    By Zhouhua Jinag

    The attempt has been made to manufacture high nitrogen austenitic stainless steels by pressurized electro-slag remelting furnace with maximum nitrogen pressure of 7MPa. To obtain high nitrogen content

    Jan 1, 2009

  • CIM
    Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM Project

    By Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming

    "This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui

    Jan 1, 2015

  • AUSIMM
    Grinding ù The Primary Conditioner

    By P Steinier

    Most operations, when considering their comminution circuit, are primarily concerned with achieving the desired particle size distribution to obtain adequate liberation for the separation process, at

    Jan 1, 2004

  • AUSIMM
    Predicted Dynamic Response of Holdup in Continuous Ball Mills

    The dynamic response of holdup in a continuous ball mill has a direct influence on the rate function of grinding kinetics and is useful for predicting the variation in the size distribution of the fin

    Jan 1, 1975

  • AUSIMM
    Modern Prospecting on an Industrial Scale

    MR. W. E. WAINWRIGHT occupied the chair, and in introducing the lecturer said, on account of the absence of the vice-president, it fell to his lot to introduce the lecturer. Mr. Tennberg, he said, was

    Jan 1, 1930

  • SME
    Method To Evaluate Liberation Characteristics Of Feed In A Jigging Plant

    By A. K. Mukherjee

    The roles of pulsating mechanisms such as the amplitude and frequency of the jig cycle are well established in jigging. Also well established are the roles of the size ratio and the volume fraction of

    Jan 1, 2008

  • SME
    Helping Banks To Manage Mineral Land Trusts

    By S. M. Pickering

    Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties

    Jan 1, 2002

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • DFI
    Bearing Capacity Of Pile By Curve-Fitting Method ? Synopsis

    By Z. Q. Zhou

    It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and

    Jan 1, 2010

  • SME-ICGCM
    Subsidence Prediction for Multiple Seam Extraction under Consideration of Time Effects by the use of Geomechanical Numerical Models

    By Jurgen te Kook

    State-of-the-art for subsidence calculation are stochastical models. Although these models were successfully used all over the world they have their limitations due to the fact that they are not based

    Jan 1, 2008

  • NIOSH
    OFR-146(2)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines - Volume 2 ? Unit Trains ? 2.1 Introduction

    By Michael Rieber

    The increase in f.o.b. mine prices of coal from $5/ton to over $18/ton in five years [1] has increased the significance of transportation costs. Coals produced in the vicinity of the consumer bear a m

    Jan 1, 1977

  • NIOSH
    Predicting methane emissions from longer longwall faces by analysis of emission contributors

    By R. B. Krog

    As part of its mining health and safety research program, the National Institute for Occupational Safety and Health (NIOSH) conducted a longwall methane emission and mining time study at a mine operat

    Jan 1, 2006

  • AUSIMM
    Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutions

    By B C. Povey, K Lagutin, M Mryasov, V Noll

    The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5

    Sep 11, 2017

  • SME
    A New Approach To Decision Making For Mines Rescue Deployment

    By D. Brady

    There are many examples, historical and recent, from the underground coal mining industry where during emergency response the response and ultimately the outcomes, could have been significantly improv

    Jan 1, 2012

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • NIOSH
    IC 8028 Mining And Milling Methods And Costs, Madison Mine, National Lead Co., St. Louis Smelting And Refining Division, Madison County, Mo. ? Introduction

    By H. D. Kline

    This publication describes mining and milling methods and costs at the Madison mine of National Lead Co., St. Louis Smelting & Refining Division, in the Fredericktown district of southeast Missouri an

    Jan 1, 1961

  • SME
    Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer Simulation

    By J. A. Delgadillo

    Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c

    Jan 1, 2008

  • DFI
  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003