Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design ProcessThe green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi
Jan 1, 1998
-
Development of a new method for quality control in the quarry industry for practicing sustainabilityBy H. Tudeshki, A. Tayebi
"The large extent of global production and consumption of aggregates from quarries, grabs one´s attention and makes its substantial and essential standpoint in the world today pretty clear. A great am
Jan 1, 2011
-
RI 4183 Elimination of Iron in Ammonium Sulfate Process for Production of Alumina ClayBy A. T. Sweet, G. Douglas Gardner
"INTRODUCTION In the ammonium sulfate process for the production of alumina from clay,,3/ the clay is baked with amonium sulfate at about 400ºC. to form anhydrous ammonium alum and free ammonia or amm
Jan 1, 1948
-
Parallel Surface Fan Operation At Hoyle Pond MineBy M. Desjardins
The Hoyle Pond underground mine, located in the Porcupine Gold Camp, east of the city of Timmins, Ontario, Canada, is the cornerstone of Goldcorp Canada Ltd?s Porcupine Gold Mines. Cut and fill, shrin
Aug 1, 2013
-
Process Development at the Raglan ConcentratorBy Joe Holmes, Peter Langlois
"Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high
Jan 1, 2001
-
Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)By Kray Luxbacher
Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.
Jan 1, 2007
-
Prediction And Design Control Of Surface Subsidence By Global Simulation Of Mine Behavior Using Finite Element ModeBy Shosei Ph. D Serata
The Stress Control Method of mine design provides enhanced engineering control over the behavior of underground structures in comparison to conventional mine design methods. The same Method can be app
Jan 1, 1986
-
Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia LimitedBy M. C. Pietrobon
"A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la
Jan 1, 2002
-
Environmental Assessment Study For Extension Of Spadina Subway In TorontoBy Verya Nasri, Scott Thorburn
The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi
Jan 1, 2007
-
Towards Predictive Control Of Ferroalloy Furnaces: Combining Thermochemistry, Inventory Modelling And Systems EngineeringBy S. J. Frank
Ferroalloy furnaces are well known to be extremely difficult to control from a metallurgical perspective. Mostly metallurgical control is still reactive in nature, causing a significant amount of rewo
Jan 1, 2004
-
Pile Monitoring, Testing, And Data Processing: New Developments And Remaining IssuesBy Alain E. Holeyman
After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi
Jan 1, 2006
-
Innovative management techniques at Kiena Gold Mines LimitedBy Brian A. Ferguson, Raynald O. Vezina, Marielle Gaudet, Raoul R. Boissonneault
"Kiena has been committed to developing a fresh management and employee relations approach since the commencement of production in 1981. The functional organizational structure encourages joint partic
Jan 1, 1987
-
Residual Aeolian Placers - A New Style of Gold Deposit in New ZealandResidual aeolian placers (RAPs) are formed by the wind, by preferential entrainment and removal of small and low-density detritusfrom a pre-existing, typically sedimentary sequence containing heavy mi
Jan 1, 2004
-
Behaviour of magnesia-bearing fluxes during iron ore sinteringBy B. M. England, L. C. Mackey
Magnesia minerals are included in most iron ore sinter mixes to provide the MgO requirements of blast furnace slag. The properties of these minerals have an influence on the eventual sintering propert
Jun 18, 1905
-
IC 8849 Room And Pillar Retreat Mining - A Manual For The Coal IndustryBy Peter W. Kauffman
This Bureau of Mines publication is designed primarily to provide mine engineers and production-level mine managers with the following: 1. Information to assist them in making the decision to retr
Jan 1, 1981
-
Gyratory Crusher Wear Monitoring Using Laser TechnologyBy Persio P. Rosario
Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the
May 1, 2002
-
Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite FlotationEffect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation
Sep 13, 2010
-
Integración y optimización de procesos de la mina a la concentradora – aplicación en la compañia minera antaminaBy Juliana Colacioppo
La voladura es un procedimiento que está diseñado para obtener pilas a través de una fragmentación adecuada para el carguío y transporte, aumentando así la productividad de las palas y camiones y aseg
Sep 9, 2007
-
Heavy Mineral Concentration from Oil Sand TailingsBy Francis Chachula, Niel Erasmus
"In 2002, Titanium Corporation Inc. focused its attention on the development of a process for the recovery of valuable heavy minerals, including zircon and titanium bearing minerals from oil sands fro
Jan 1, 2008
-
Eglinton Crosstown, a New Step in Toronto’s Subway SystemBy Lars Richter, Franz-Werner Gerressen
"The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation
Jan 1, 2017