Search Documents

  • DFI
    Uplift Capacity Of Drilled Piers In Clay - Synopsis

    By Braja M. Das

    Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat

    Jan 1, 1987

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • NIOSH
    OFR-18-76 Economic Feasibility Of Recovering And Utilizing Methane Emitted From Coal ? I. Summary - A. Purpose And Scope

    The U.S. Bureau of Mines has been concerned for many years with the general problems of underground coal mining and the particular problems due to the methane content of the coal. The Bureau and other

    Jan 1, 1975

  • SME
    Modification and Enhanced Testing of Data Mining-Based Algorithm to Detect Subtle Errors in Temperature Sensors in Gold Stripping Circuit Mining, Metallurgy and Exploration (cca8e619-0fb1-422a-925d-6e04d2a067f5)

    By Eduardo Pimenta de Melo, Rambabu Pothina, Rajive Ganguli

    Sensors are everywhere in the mining industry, with sensor information being used to monitor and operate processes. Therefore, when sensor information is wrong, economic losses can occur. Unfortunatel

  • ISEE
    Ground Motions from and House Response to Underground Aggregate Mining

    By Professor of Civil and Environmental Engineering Northwestern University, Mike Wladron, Gordon Revey

    A unique judicial opportunity allowed measurement of the response of three cracks in residential structure to blasting for underground aggregate mining. Instrumented cracks were located in the interio

    Jan 1, 2007

  • DFI
    Experience Gained At The Application Of Atlas Piles In Poland

    By Kazimierz Gwizdala

    In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering

    Jan 1, 2006

  • SME
    Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump Equipment

    By A. Yazadni-Chamzini

    Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl

    Jan 1, 2012

  • SME
    Real-time measurements of diesel EC and TC in a Nevada Gold Mine with photoacoustic and dusttrak instruments: Comparison with NIOSH 5040 filter results

    By W. P. Arnott

    This paper presents real time photoacoustic measurements of diesel-soot black-carbon (BC or EC) and Dusttrak nephelometer total carbon (TC) concentrations in a Nevada gold mine. Comparisons with time-

    Jan 1, 2009

  • IIMP
    Estrategias de planeamiento de minado para maximizar el valor de la operación minera de Tintaya

    By Víctor Guimaraes

    El presente texto señala las estrategias de planteamiento de minado en la minera Tintaya con el objetivo de maximizar el valor neto de la operación minera y a un nivel aceptable de riesgo. Este ciclo

    Sep 9, 2007

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • SAIMM
    Insights Into The Influences Of Paste Additions And Levels On Söderberg Electrode Management

    By F. X. Prins, L. R. Nelson

    Tight control of electrode paste additions, hard and soft paste levels, baked zone position and electrode temperatures are integral to superior Söderberg electrode management practices. Paste addition

    Jan 1, 2004

  • IIMP
    Como optimizar los métodos tradicionales de estimación de reservas con el análisis variográfico geoestadístico

    By Samuel Canchaya

    Los paquetes medianos y grandes de software a minería contienen en sus módulos de estimación de reservas alguna forma de análisis variográfico geoestadístico. En esa perspectiva, el presente trabajo s

    May 25, 1998

  • ISEE
    Improving Safety of Drill Steel Diameter Changes on Rotary Drills

    By Zach Ellis, Dusty Fisher

    The Office of Surface Mining, Reclamation, and Enforcement (OSM) cited a large surface coal mine for a series of flyrock incidents that occurred when blasting close to the mining lease perimeter. The

    Jan 1, 2015

  • TMS
    Arsenic Removal By Electrocoagulation Technology In The Comarca Lagunera Mexico

    By José R. Parga

    In some parts of the Comarca Lagunera with population of about 2.5 million people, situated in the central part of northern México, chronic arsenic poisoning is endemic and severe adverse effects attr

    Jan 1, 2005

  • SME
    The Tichauer-DeTomi Matrix: a Tool for Assessment of Geological Uncertainty in Small-scale Mining Mining, Metallurgy and Exploration (9437b467-4b8d-4115-856e-5795cdbb6370)

    By Giorgio De Tomi, Ricardo Tichauer

    Mineral exploration is a critical step for success in mining. However, small-scale mining often ignores exploration best practices. This paper introduces the Tichauer-DeTomi Matrix, a tool for assessm

  • NIOSH
    RI 6043 Recovery Of Mineral Values In Cupriferous And Nickeliferous Pyrrhotite ? Summary

    By Oliver C. Fursman

    These investigations were conducted to determine conditions for recovery of nickel and copper from Funter Bay, Alaska, sulfide ore and recovery of nickel from nickel-silicate ore, Nickel Mountain, Rid

    Jan 1, 1962

  • RMCMI
  • AIME
  • ISEE
    Measuring Underground Face Drilling and Blasting

    By Thomas Barkley

    Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure

    Jan 1, 2003