Search Documents

  • NIOSH
    OFR-25-80 Cost And Time Analysis Of The Mining And Environmental Requirements In The Premining Stage For Copper Mining In The Northern Highland, Wisconsin

    By James P. Ludwig

    This report provides the results of a two year study of the projected time and cost requirements for new mine development in Wisconsin and is based on a unique blend of information from mining company

    Jan 1, 1979

  • SAIMM
    Winning Paper: Analysis Of Strike Gully Stability At Tautona Mine

    By J. Thompson

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree A study into the stability of strike gullies at TauTona mine was to be carried out. In reaching

    Jan 1, 2002

  • NIOSH
    OFR-79(1)-76 Concept Feasibility Study For Training Equipment To Improve Coal Productivity - Volume 1 Of 2

    By Anthony E. Szczuka

    Two facets of surface mining were studied: feasibility of using training simulators to increase productivity of haulage trucks, front-end loaders, and shovels; and improving the efficiency of dragline

    Jan 1, 1976

  • AUSIMM
    An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and Grinding

    By M Korte, J McMaster, C Brent

    The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and has increased production from the original 119 t/h design capacity to a milling throughput of 265 t/h in

    Jan 1, 2009

  • CIM
    Vision for a Risk Adverse Integrated Geometallurgy Framework

    By Guillermo Turner-Saad

    "Best practice in the economic evaluation of mining projects and operations is based on the integration of geological, mining, metallurgical, environmental, marketing, economic and corporate informati

    Jan 1, 2010

  • DFI
    Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam

    By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett

    "A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu

    Jan 1, 2017

  • NIOSH
    RI 3288 Detailed Statistical Microscopic Analyses Of Ore And Mill Products Of The Utah Copper Co. ? Introduction

    By R. E. Head

    [This paper embodies the data obtained by a detailed statistical, microscopic analysis of the composite mill feed concentrate, and tailing from the Magne and Arthur mills of the Utah Conger Co. for 1

    Jan 1, 1935

  • NIOSH
    RI 3288 Detailed Statistical Microscopic Analyses Of Ore And Mill Products Of The Utah Copper Co. ? Introduction (22f9bf8a-7549-4c23-9796-010e350bad1a)

    By R. E. Head

    This paper embodies the data obtained by a detailed statistical, microscopic analysis of the composite mill feed concentrate, and tailing, from the Magne and Arthur mills of the Utah Conger Co. for 1

    Jan 1, 1935

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME
    Newmont Gold Company Post Mill Grinding Circuit

    By David L. Hill

    Newmont Gold Company's Mill No. 4 is located along the Carlin trend, about 25 miles North of Carlin, Nevada. The plant consists of a primary grinding circuit using a 7.2 m (22 ft) diameter by 2.6

    Jan 1, 1993

  • NIOSH
    RI 3580 Progress Reports -Metallurgical Division ? 48. Electrolytic Manganese And Its Alloys ? Manganese Metal - Methods Of Preparation

    By R. S. Dean

    [Methods s of preparing the manganese metal that has been used in chemical and metallurgical investigations have passed through a cycle. Most of the investigations made e before the turn of the centur

    Jan 1, 1941

  • CIM
    Flotation Circuit Analysis at Zinifex Century Mine

    By Dan Alexander, Ivan Crnkovic, Sarah Schwarz

    "Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur

    Jan 1, 2008

  • AIME
    Gold and Silver Operations in Australia and Adjacent Lands

    By M. W. BERNEWITZ

    AUSTRALIANS and New Zealanders, whose countries have respectively yielded gold to the value of £666,000,000 and £96,000,000, are taking full advantage of the current high prices for that metal. There

    Jan 1, 1934

  • NIOSH
    RI 4481 Diamond Drilling In The Metaline District Pend Oreille County, Wash.

    By N. L. Wimmler

    The Metaline mining district was examined in 1942 by Bureau of Mines engineers with the cooperation of geologists of the Federal Geological Survey. Because the demands of war production were rapidly

    Jan 1, 1949

  • NIOSH
    IC 8720 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines Developed For Longwall Mining - Mines With Annual Production Of 1.3 And 2.6 Million Tons By Longwall Mining From A 48-Inch Coalbed

    By John R. Duda

    The Bureau of Mines is developing estimates of capital investment, operating cost, and selling price for underground mines producing bituminous coal by various mining methods. This study estimates the

    Jan 1, 1976

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • CIM
    The Anisotropic Character of Talc Surfaces as Revealed by Streaming Potential Measurements, Atomic Force Microscopy, and Molecular Dynamics Simulations

    By J. Nalaskowski

    A study of the interfacial properties of the basal plane and the edge surfaces of talc is described in this paper. The isoelectric point measured at the two different crystallographic planes by the st

    Jan 1, 2006

  • AUSIMM
    Notes on the Engineering Design of Tungsten-Carbide Rock Bits

    In presenting this paper the author has in view a twofold purpose. In the first place, it is intended to set forth for the benefit of practical mining men some account of the principles underlying the

    Jan 1, 1950

  • SME
    Shaft Sinking on the MetroWest Water Supply Tunnel Project

    By A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson

    The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f

    Jan 1, 1999