Search Documents

  • AUSIMM
    On-Stream Shale Detector for Sedimentary Iron Ores

    By Holmes R. J, Miles J. G

    An on-stream shale detector has been developed that is suitable for use on conveyor belts carrying iron ore of up to 200 mm particle size. The shale is distinguished from high-grade iron ore by means

    Jan 1, 1981

  • AUSIMM
    Paper No. 169. The Training of a Mining Engineer.

    A GREAT deal of attention has lately been given to the discussion as to the education required for engineers, and especially for mining engineers. The Institute of Civil Engineers has had a committee&

    Jan 1, 1909

  • IIMP
    Expansión de producción de Condestable con innovaciones tecnológicas en clasificación de molienda

    By Roberto Chambi

    "El presente trabajo señala la expansión de la producción de la mina Condestable a través de las innovaciones tecnológicas en clasificación de molienda como: la utilización de estas zarandas derrick d

    Sep 9, 2007

  • SME-ICGCM
    Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)

    By S. E. Phillipson

    Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such

    Jan 1, 2009

  • NIOSH
    RI 3195 Selective Oiling and Table Concentration of Phosphatic Sands in the Land-Pebble District of Florida

    By Pamplinm J. W.

    "INTRODUCTION For the past six years the United States Bureau of Mines in cooperation with the University of Alabama, Tuscaloosa, Ala., the Missouri School of Mines and Metallurgy, Rolla, Mo., and cer

    Dec 1, 1932

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • AIME
    Papers - Nonferrous Metallurgy - Investigation of Anodes for Production of Electrolytic Zinc, II

    By H. R. Hanley

    The characteristics of alloyed anodes and their influence on the products of electrolysis and power consumption have been noted previosly ously in the literature.' This paper presents data in con

    Jan 1, 1931

  • NIOSH
    IC 8322 Vapor Pressure Of Pure Liquid Nitrogen

    By P. C. Tully

    The vapor pressure-temperature relationships for saturated pure liquid nitrogen are calculated by the Strobridge equation using a digital computer. This information is presented in two tables: first)

    Jan 1, 1967

  • AUSIMM
    Subsidiary Mine Drainage

    Underground Mine Drainage may be conveniently divided into two operations:(a) Collecting and transporting drainage water to the pump eastern.(b) Elevating water to the surfacc by pumping.This short pa

    Jan 1, 1927

  • DFI
    Effects Of Mineral And Polymer Slurries On Drilled Shafts - 1. Introduction - 1.1 History Of And Principles Of Mineral Slurries In Drilled Shaft Construction

    By Michael W. Neill, O&apos

    Drilling slurry has become an effective aid to the construction of drilled shafts in caving and/or waterbearing soils. Historically, drilling slurry made of bentonitic clay and water was first used in

    Jan 1, 1991

  • ISEE
    A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When Decking

    By Neal Lee, Braden T. Lusk, Brendan McCray

    Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp

    Jan 1, 2016

  • AUSIMM
    Stacking and Reclaiming Facilities at the Thiess Bros Pty Ltd, South Blackwater Coal Mine from Conception to Operation

    By R Hoskings

    Conceptual studies of the run of mine stockpiling and reclaiming requirements commenced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equipm

    Jan 1, 1980

  • AUSIMM
    Golden Cross Mine - Gold Mining in a Sensitive New Zealand Environment

    The Golden Cross mine is situated in a sensitive environmental setting on the North Island of New Zealand, about 150 kilometres south-east of Auckland and about 8 kilometres NW of Waihi. The mine is s

    Jan 1, 1995

  • AUSIMM
    Maori Expectations for Consultation

    James Barnes is Managing Director of James Barnes & Associated Ltd which is a company that has invested ten years of development to provide developers with a transparent, user friendly consultatio

    Jan 1, 2000

  • DFI
    Soil Nail Support Of Excavation System For The Embassy Of The Peoples Republic Of China In The United States

    By Giovanni A. Bonita

    The new Embassy of the Peoples Republic of China in the United States (Chinese Embassy) is located in the Embassy Row portion of Northwest Washington DC. The 475,000 ft2 (44,125 m2) struct

    Jan 1, 2006

  • NIOSH
    OFR-34-77 Digital Computation Of Transients And Safety Testing Of Mine Electrical Power Systems. - Periodic Inspection Of Mine Electrical Power Systems ? 1.1 Introduction

    Airy kind of a power system is a complicated network of various electrical components, such as cables, transformers, electric machines, circuit breakers, etc. For a system to work continuously and eff

    Jan 1, 1975

  • SAIMM
    Beneficiation of Marble From Griekwastad, Northern Cape Province

    By N. P. Mahumapelo

    This paper is based on a study to determine the potential beneficiation opportunities for marble from Griekwastad in the Northern Cape Province. The marble was characterized mineralogically by X-ray

    Jan 1, 2014

  • SME
    The Crossrail Experience

    By Bill Tucker, Mike Black

    "PROJECT OVERVIEW Crossrail, Europe’s largest construction project, will increase London’s transportation capacity by 10% when it opens in 2018. The Crossrail scheme is a combination of surface and un

    Jan 1, 2016

  • CIM
    Aspects of Tailings Reclamation in Ontario and Quebec

    By E. M. Watkin

    "Land directly disturbed by hard rock mining activities in Ontario and Quebec was surveyed in 1974 as part of a country-wide assessment, (Murray 1977). Some 15, 000 hectares, or 5 7 square miles, are

    Jan 1, 1980

  • AUSIMM
    Testing for the Selection of Comminution Circuits to Prepare Concentration Feed (a815d937-44c4-4647-9f91-461932a0c73e)

    The selection of the best comminution circuit for the preparation of concentration feed is a compromise based on economics, energy efficiency, labour costs, steel consumption, availability and other f

    Jan 1, 1984