Search Documents

  • AUSIMM
    Some Notes on "The Davis Calyx Drill".

    All previous attempts to cut rock in boring by means of revolving steel cutters have failed, chiefly in consequence of the mis-shapen teeth grinding the rock and themselves simultaneously, until, afte

  • NIOSH
    IC 7925 Coal-Chemical Materials Produced At Coke Plants In The United States 1948-57 ? Summary

    By Joseph A. DeCarlo

    THE TOTAL VALUE of sales of coal-chemical materials in the 10-year period 1948-57 increased 34 percent or at an average annual rate of approximately 3.5 percent. According to the Chemical Industry Fac

    Jan 1, 1959

  • AUSIMM
    Some Operational Aspects of Heap Leaching at Rum Jungle

    An oxide ore heap (80,000 ton assaying 2 per cent copper) and a sulphide ore heap (300,000 ton assaying 1·7 per cent copper) are being leached in series in a closed circuit system. The ore is fri

    Jan 1, 1968

  • NIOSH
    Review Of Mining Technology (1dc40e31-63f9-4092-a148-2e045745fedc)

    By James E. Hill

    Tremendous improvements in mining technology have been witnessed during the past 100 years. For example, before 1860 all blastholes were drilled manually and blasting was done with low-energy black-po

    Jan 1, 1966

  • NIOSH
    RI 4972 Analyses Of Tipple And Delivered Samples Of Coal (Collected During The Fiscal Year 1952) ? Introduction

    By S. J. Aresco

    The Bureau of Mines has been active in promoting the purchase of coal for Government use under specificetiona that define the requirements in terms of heating value of the coal, expressed in British t

    Jan 1, 1953

  • NIOSH
    OFR-25(1)-83 Monitoring And Modeling Of Shallow Ground Water Systems In The Powder River Basin

    By Donald Koch

    The project investigated regional impacts of mining on the ground water system of the Powder River Basin by: 1) establishment of a regional ground water monitoring network, and 2)development of , set

    Jan 1, 1982

  • SAIMM
    Transfer Function For The Seismic Signal Recorded In Solid And Fractured Rock Surrounding Deep Level Mining Excavations

    By A. Cichowicz

    The objective of this work is to quantify the effect of the rock mass surrounding a stope or a tunnel on the seismic signal so that the rockburst damage on the excavation can be derived. It has been s

    Jan 1, 1999

  • AUSIMM
    Down-Hole XRD Analyses as a Guide to Hydrothermal Alteration in the Wharekirauponga Epithermal Gold-Silver Prospect, Hauraki Goldfield, New Zealand

    By R Soong

    The Wharekirauponga (WKP) epithermal gold-silver deposit is located about 10 km north of Waihi in the Hauraki Goldfield east of Auckland. WKP is notable for its sheeted to stockwork quartz veins hoste

    Jan 1, 2001

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • CIM
    The Nanisivik Mill

    By A. C. T. Bigg

    "The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of

    Jan 1, 1980

  • AUSIMM
    Avoiding Unnecessary Drilling

    The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian

    Jan 1, 1975

  • NIOSH
    OFR-101-80 Environmental Assessment Of In Situ Mining

    By Dennis R. Kasper

    This study evaluates selective environmental impacts of two distinct in situ mining techniques. In situ leaching of uranium, porphyry copper and native copper and in situ borehole (slurry) mining of u

    Jan 1, 1979

  • AUSIMM
    Measuring and Taking Notice of Orebody Variability – An Essential Ingredient for Reliable Plant Design

    By D David

    The majority of SAG and ball mill design methodologies are applied using a single design value for mill selection, such as the 80th percentile ball mill work index or SMC value. Inherent in the select

    Sep 7, 2015

  • NIOSH
    Methane Control Research: Summary Of Results, 1964-80

    By Maurice Deul

    This bulletin summarizes the work conducted under the Bureau of Mines methane control research program during the years 1964 to 1979. This research effort was directed toward improving existing method

    Jan 1, 1986

  • AUSIMM
    Pulverising Coal

    E. W. Stutchbury (Internationa~ Oombustion Aust. Ltd.) : Mr. Callcott made particular mention in his paper of erosion in primary air fans which are placed after the mill discharge. He adds that subseq

    Jan 1, 1957

  • AUSIMM
    Processing Options for Phosphate Ores with High Fe and Al Contents

    The prospect of utilisation of phosphate ores which contain high P2O5 values associated with Al and Fe has produced a great deal of interest over many years. Processing options have generally been bas

    Jan 1, 1990

  • NIOSH
    New Publications Of The Bureau Of Mines - List 937 - Jan.- Feb. 1995 - Electronic Information

    Commodities statistics and otter information are available through the following t et systems: Internet Access: To acccess the USBM Gopher server on Internet, connect to: gopher.usbm.gov port 70, us

    Jan 1, 1995

  • CIM
    Mettop´s New Ionic Liquid Cooling Technology is the Safest Way to Cool a Furnace

    By Stefan Wallner, Andreas Filzwieser, Stefan Konetschnik, Reinhard Preiss, Iris Filzwieser

    "Process Safety Management for METTOP means avoiding risks as far as possible - but also dealing with the residual risk by using all existing management tools or external assistance, if required. The

    Jan 1, 2014

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959