Search Documents

  • AUSIMM
    Geometallurgy - What do you Really Need to Know from Exploration through to Production?

    By K Ehrig

    You are a geologist, geometallurgist, or metallurgist/process engineer and are fortunate enough to work for an organisation who asks you to design/execute a geometallurgy program. What seems like a si

    Jul 15, 2013

  • IOM3
    Geochemical exploration for gold in tropical soils: four contrasting case studies from West Africa

    By E. O. Afreh, R. J. Bowell, E. Hanssen, D. Pohl, S. Abe, R. K. Yao, N. d'A. Laffoley

    In the largely preserved laterite profiles at Syama mine, in the savanna region of southern Mali, element geochemistry in the mottled-clay horizon and below can be related directly back to the protoli

    Apr 1, 1996

  • NIOSH
    RI 3468 Chemical Considerations Relating To Fires In Anthracite Refuse ? Introduction (1067f50f-d311-4814-b182-e930b23927c4)

    By G. W. Jones

    Fires in anthracite refuse banks are troublesome and may become exceedingly costly to combat. Instances are known in which refuse-bank fires have grown to such magnitude that entire mining properties

    Jan 1, 1939

  • CIM
    Geology and Mineralogy of the Hercynian Koudiat Aïcha Polymetallic(Zn-Pb-Cu) Massive Sulfide Deposit, Central Jebilet, Morocco

    By E. Marcoux, F. Lotfi, A. Belkabir, L. Maacha, A. C. Brown, S. Brunet

    "Koudiat Aïcha is a small Zn-Pb-Cu deposit, enclosed in the Visean Sarhlef volcano-sedimentary series of the Moroccan Hercynian Jebilet massif. Base metal mineralization is located between a basal uni

    Jan 1, 2008

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • NIOSH
    IC 8218 Research And Technologic Work On Explosives, Explosions, And Flames: Fiscal Year 1962

    The principle activities of the Explosives Research Laboratory from July 1, 1961 to June 30, 1962, are described briefly in part 1. Part 2 gives short abstracts of publications that appeared durin

    Jan 1, 1964

  • AIME
    Membership (a94e0fd0-b84d-485b-bf9f-87c2437839b1)

    NEW MEMBERS The following list comprises the names of those persons who became members during the period Oct. 10, 1916 to Nov. 10, 1916. ANCHOR, HANS C., Supt., Dome Extension Mines Co., Ltd., South

    Jan 12, 1916

  • SAIMM
    Burning pyrites compared to sulphur ? Synopsis

    By W. V. Mutler

    Present day capital costs are analysed for a 2 000 metric tonne per day (MTPD) pyrite burning plant and compared with a sulphur burning plant of the same capacity. Power, raw material and steam produc

    Jan 1, 2009

  • NIOSH
    OFR-75-79 A Statistical Evaluation Of The Effects Of Environmental And Operational Parameters On The Production Of Coal Mine Dust

    By G. D. Andria

    Contract J0275007 was to consist of a thorough two-phase statistical analysis of respirable coal mine dust data from USBM Contracts H0232061, H0232060, H0230029, H0230031, H0210050, and H0242013. Cons

    Jan 1, 1978

  • NIOSH
    OFR-77-79 Methods And Materials For High-Modulus Fills In Underground Mines

    By Koehler Stout

    Many hydraulic backfills are deposited at low density and provide less than optimum support strength to stope walls. This laboratory study shove that fill strength can be considerably increased. Place

    Jan 1, 1979

  • AUSIMM
    In-Pit Crushing and Conveying (IPCC) - An Economic Alternative to Trucks that Delivers on Safety and the Environment

    If the industry keeps doing what it has always done, it will continue to get what it has always got - rising operating costs. Why is this so? Generally grades being chased are becoming lower, strippin

    Jun 1, 2010

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • NIOSH
    IC 7294 Prospect Trenching With Caterpillar-Mounted Angledozers

    By S. H. Lorain

    Mechanized dirt-moving equipment has greatly increased the scope of prospect trenching by lowering the costs and increasing the speed of such work. Where the soil covering was more than 3 or 4 feet de

    Jan 1, 1944

  • DFI
    Strengthening Of A Cardboard Machine Foundation In Kemi, Finland ? Summary

    By J. Hartikainen

    Kemi cardboard mill is founded on the alluvial bed of Kemi river at the north-eastern cost of Botnic Culf in Northern Finland. The alluvium consists of sandy and silty layers underlain by thick medium

    Jan 1, 2010

  • SME
    Vari-Stem Blasthole Plugs Improve Blasting Patterns

    In September 2003, a test was conducted to see if a115-mm- (4.5-in.-) diam Mocap Vari-Stem blasthole plug could improve the pattern of explosives using different top stemming material. The test too

    Jan 1, 2004

  • NIOSH
    OFR-3-76 Feasibility Of Remote Control And Development Of Remote Control Devices And Sensors ? Shuttle Car Sensor System - Supplement - Automatic Steering Control For Mine Shuttle Car (Phase I)

    By Richard L. Fowler

    An automatic steering control system was designed, installed and tested on a coal mine shuttle car. The system utilizes sensors and associated signal processing electronics developed under a previous

    Jan 1, 1975

  • NIOSH
    OFR-180-84 Remote Manual Control Roof Bolter

    By Peter de Bakker

    The objective of this contract was to develop a simple, reliable, economical, remote-control roof bolting module for installation of mechanical and resin bolts. It was to be capable of placing longer

    Jan 1, 1983

  • NIOSH
    Air Curtain Provides Dust Protection - Objective:

    To reduce the exposure of mining machine operators to respirable dust. Approach: A protective curtain of filtered air is blown down around the operator's head, from a manifold mounted on

    Jan 1, 1976

  • SME
    A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation

    By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee

    This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul

    Sep 1, 2014

  • SAIMM
    Design and development of a low noise rockdrill

    By R. W. Ottermann, N. D. L. Burger, A. J. von Wielligh, P. R. de Wet, J. L. Steyn

    A low noise blast hole drilling system was developed to limit the risk of noise induced hearing impairment in mining operations. Noise induced hearing loss has been identified as a major occupational

    Jan 1, 2003