Search Documents

  • SAIMM
    Solvent extraction design consideration for the Tati Activox® plant - Synopsis

    By E. Robles

    The Tati Activox® Project (TA®P) is the first step towards the implementation of the Norilsk Nickel Activox® process. The ultrafine grinding (UFG) and autoclave pressure leach process conditions are t

    Jan 1, 2009

  • NIOSH
    IC 8108 Waterborne Mineral Wastes And Water Uses Of Various Industries In The Lower Missouri River Basin - Summary

    By Roy F. Waters

    An inventory was made by the Bureau of Mines of wastes of mineral origin, water requirements, treatment of wastes, and water treatment practice of 163 industrial installations in the Lower Missouri Ri

    Jan 1, 1962

  • NIOSH
    OFR-35-85 Productivity Of Parent Materials On Mined Prime Farmlands Using Alternative Sources Of Organic Materials Compared To Topsoil Replacement

    By J. H. Jones

    The original term of grant No. 1115174 was September 1980 through December 1983. An extended progress report, covering this time period, was forwarded to the Bureau of Hines in January 1984. The p

    Jan 1, 1985

  • CIM
    Comparative Study on Flotation Performance of Stockpiled and Fresh Ore Samples

    By C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar

    "As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B

    Jan 1, 2006

  • AUSIMM
    Recovery of Precious Metals from Chloride Solution by Magnetite

    Recovery of Precious Metals from Chloride Solution by Magnetite The development of environmental-friendly lixiviants as alternatives to cyanide and the increasing recycling activities to recover prec

    Sep 13, 2010

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • DFI
    Prediction And Performance Of Drilled Shafts Constructed Under Slurry

    By Clyde N. Baker

    The paper describes procedures used to predict the settlement performance of drilled shafts constructed under slurry through water bearing deposits to a dense bearing strata, considering both side res

    Jan 1, 1991

  • NIOSH
    Bulletin 150 Electrodeposition of Gold and Silver from Cyanide Solutions

    By S. B. Christy

    This report on the electrodeposition of gold and silver from cyanide solutions represents work that has occupied my time at intervals during the past 20 years. The investigation has been carried on si

    Jan 1, 1919

  • AIME
    Nodulizing Iron Ores And Concentrates At Extaca

    By M. V. Mielke, R. E. Hagen, R. L. Bennett

    FINE IRON ORES, and concentrates such as those produced from taconite, must be converted to lump form by some process of agglomeration before they can be used effectively in the blast furnace or open

    Jan 1, 1954

  • NIOSH
    IC 8518 Analyses Of Natural Gases, 1970 ? Introduction

    By L. E. Cardwell

    This publication contains routine analyses and related source data for 377 natural gas samples from 19 States and two foreign countries. Of this total, 373 samples were collected during calendar year

    Jan 1, 1971

  • SME
    Incorporating Value to Waste Rock in the Ultimate Pit Optimization for Haul Road and Mining Pads Construction and Maintenance Purposes

    By Rodrigo Peroni, Vitor Campos

    Carajás is one of the largest open pit mines in the world. The mine is comprised by a haul road network more than 100 km long, where the need for good roads is paramount and determining of the truck p

    Jun 25, 2023

  • NIOSH
    RI 9105 - Fumes From Shielded Metal Arc Welding Electrodes

    By J. F. McIlwain

    The Bureau of Mines has investigated fumes generated by selected welding electrodes used in mines in order to help determine their relative health hazard potential. Fumes were generated and collected

    Jan 1, 1987

  • ISEE
    Planning to Demonstrate Why High PPVs Work for Close-In Blasting

    By Chris Breeds, Larry Leone, Jerry Wallace

    Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str

    Jan 1, 2010

  • DFI
    Underwater Concrete - Mix Design And Construction Practices

    By Sam X. Yao

    The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde

    Jan 1, 2013

  • SME
    Nature Friendly Sustainability: Mining

    By M. Javier

    This concept paper is presented in the hope of raising the awareness of mankind on the necessity for its peaceful coexistence with nature. It is a food for thought. It takes compromise and sacrifice o

    Feb 27, 2013

  • NIOSH
    OFR-44-74 Coal Cleaning Plant Noise And Its Control

    By E. E. Ungar

    Criteria applicable to noise in coal cleaning plants are presented, and the generally applicable noise control principles and approaches are discussed. The operating characteristics and equipment of c

    Jan 1, 1974

  • NIOSH
    OFR-79(2)-76 Concept Feasibility Study For Training Equipment To Improve Coal Productivity - Volume 2 Of 2 ? Purpose

    By Anthony E. Szczuka

    The purpose of this design note is to document the data that has been received from manufacturers, coal companies, training centers, government agencies, etc., that pertains to the completion of the C

    Jan 1, 1976

  • CIM
    A New Method for the Stabilization of Arsenic from Enargite Concentrates

    By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.

    Jan 1, 2017

  • DFI
    What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary

    By Jorj O. Osterberg

    The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc

    Jan 1, 1999

  • DFI
    Specialized Slurry Wall Equipment - The Hydromill - Summary

    By Mario Mauro

    The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l

    Jan 1, 1994