Search Documents

  • CIM
    Architecture of Gold Mineralization at Anomaly A of the Clarence Stream Deposits, Southern New Brunswick

    By A. J. Hynes, Lutes. G. G., Ravenelle. J. -F.

    "The Anomaly A area of the Clarence Stream gold deposits in southwestern New Brunswick contains mineralized structures that bear geometrical relationships to regional folding events. The four minerali

    Jan 1, 2008

  • NIOSH
    OFR-33-76 Remote Control For Continuous Miners: A State-Of-The-Art Review

    By L. D. Gent

    This report reviews the current state of the art of remote control techniques for underground continuous miners. A delineation of aspects requiring additional data is presented. Also a summary and del

    Jan 1, 1975

  • SAIMM
    Technical skills?a major strategic issue - Synopsis

    A shortage of technical skills in all areas of the mining industry is being experienced worldwide. This has significant consequences for design, operations, productivity and safety and, therefore, nee

    Jan 1, 2009

  • CIM
    Sulphur-Burning Sulphur Dioxide Gas Plants for Hydrometallurgical Processes

    By K. Loutet, A. Guenkel, K. Nikolaisen

    "The INCO SO2/air process was patented by INCO in 1985. Well over 80 mining operations worldwide are using this process to oxidize cyanides to cyanates in the tailings from gold, silver and copper min

    Jan 1, 2016

  • SME
    Strain energy considerations related to strata failure during caving operations

    By Vasilis Androulakis, Caroline Gerwig, Zach Agioutantis

    Mining operations that involve caving of the overlying strata are designed so that caving occurs in a controlled manner by progressive overburden failure. However, there are many cases where the overl

  • NIOSH
    OFR-51-83 Telephone Communication System For A Deep-Vein Metal Mine

    This report describes the results of a program to design, procure, install, and evaluate a multi-channel underground telephone system of modern design in the Sunshine Silver Mine near Wallace, Idaho.

    Jan 1, 1982

  • AUSIMM
    Boiling Fluids in the Otago Schist û Potential for Epithermal Mineralisation?

    Some Otago quartz veins display spectacular open-space filling textures indicative of shallow formation. Fluid inclusions in some such veins show that fluid immiscibility occured before or during mine

    Jan 1, 1987

  • NIOSH
    RI 8724 In-Plant Recycling of Stainless and Other Specialty Steelmaking Wastes

    By L. W. Higley

    It is estimated that well over 20 million lb of chromium and 8 million lb of nickel, plus other metal values, are diverted annually to furnace dusts, mill scale, and contaminated swarfs in the domesti

    Jan 1, 1982

  • NIOSH
    OFR-47(10)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 10. Elements Of Macro- And Microclimate

    By Richard H. Bares

    The general or macroclimate of the study sites in western North Dakota is characterized by rapid and sometimes extreme daily and day-to-day temperature fluctuations, rainfall patterns which are errati

    Jan 1, 1982

  • NIOSH
    OFR-115(1)-78 Study Of Mine Fires And Mine Ventilation - Part I - Computer Simulation Of Ventilation Systems Under The Influence Of Mine Fires - Summary

    By Rudolf E. Greuer

    The existing computer programs for the simulation of ventilation systems under normal ventilation conditions are reviewed and a suitable program for including the influence of mine fires is selected.

    Jan 1, 2011

  • CIM
    The Red Dog VIP Mill Optimization Project - A Study in Fast-Track Project Execution and Alliance Contracting

    By Steve W. Ciccone

    The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes per

    May 1, 2002

  • SAIMM
    Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - Synopsis

    By G. S. Maré

    Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas

    Jan 1, 2010

  • TMS
    Hot Working Behavior of 17-4 PH Stainless Steel

    By Hamed Mirzadeh

    The hot working behavior of 17-4 PH stainless steel was studied using the hot compression test at temperatures of 950-1150 °C with strain rates of 0.001-10 s-1. A step by step procedure for data analy

    Jan 1, 2010

  • CIM
    Ground Control Aspects of Mining Deep Remnant Panels at Falconbridge Lockerby Mine ? A Case Study

    By J. Ran

    There are challenges in mining deep tabular ore deposits using the open stoping method, particularly mining remnant panels towards the end of mine life. The remnant panels have experienced stress conc

    Apr 1, 2005

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Ironmaking Melter

    By C Garlick, O Gregory, H Rogers, B I. Winters, Z C. Ye

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multihearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-li

    Jan 1, 1995

  • NIOSH
    RI 7809 Separating Copper From Scrap By Preferential Melting - Laboratory And Economic Evaluation

    By Vance G. Leak

    A technique for recovering copper and steel from metallic scrap has been developed by the Bureau of Mines based on preferential melting in molten salt baths at 1,150° to 1,250° C, The molten salt, pre

    Jan 1, 1973

  • AIME
    Industrial Section (2c3453a1-3f7f-4542-8ccc-838f254e36e5)

    Preheating Feature of Leyner Oil Furnace for Heating Drill Steel The No. 3 Leyner oil-burning furnace, used for heating drill steel, is now made with a preheating chamber. By this addition it is clai

    Jan 3, 1916

  • IOM3
    Bearing capacity of open-cut coal-mine backfill materials

    By A. R. Naderian

    Laboratory strength and deformation testing of freshly blasted sandstone and claystone overburden from Jeebropilly colliery in Queensland and in-situ plate-bearing tests on four backfills of different

    Jun 19, 1905

  • NIOSH
    IC 7741 Drill-Dust Collectors Approved By The Bureau Of Mines As Of January 31, 1956 ? Introduction

    By C. W. Owings

    One phase of Bureau of Mines health and safety work is promotion of the use of safe and effective dust-collecting devices in connection with rock drilling in coal mines. To insure that adequate equipm

    Jan 1, 1956

  • CIM
    Leadership in Maintenance Best Practices - The Mining Experience

    Leadership "Organizing a group of people to achieve a common goal" Paradigms ? Rush to produce or cut costs. ? The most important thing after safety is production. ? We?ll take care of ??this?? o

    Aug 1, 2013