Search Documents

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • AUSIMM
    Some Operational Aspects of Heap Leaching at Rum Jungle

    An oxide ore heap (80,000 ton assaying 2 per cent copper) and a sulphide ore heap (300,000 ton assaying 1·7 per cent copper) are being leached in series in a closed circuit system. The ore is fri

    Jan 1, 1968

  • SAIMM
    Transfer Function For The Seismic Signal Recorded In Solid And Fractured Rock Surrounding Deep Level Mining Excavations

    By A. Cichowicz

    The objective of this work is to quantify the effect of the rock mass surrounding a stope or a tunnel on the seismic signal so that the rockburst damage on the excavation can be derived. It has been s

    Jan 1, 1999

  • AUSIMM
    Some Notes on "The Davis Calyx Drill".

    All previous attempts to cut rock in boring by means of revolving steel cutters have failed, chiefly in consequence of the mis-shapen teeth grinding the rock and themselves simultaneously, until, afte

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • CIM
    Mettop´s New Ionic Liquid Cooling Technology is the Safest Way to Cool a Furnace

    By Stefan Wallner, Andreas Filzwieser, Stefan Konetschnik, Reinhard Preiss, Iris Filzwieser

    "Process Safety Management for METTOP means avoiding risks as far as possible - but also dealing with the residual risk by using all existing management tools or external assistance, if required. The

    Jan 1, 2014

  • AUSIMM
    Avoiding Unnecessary Drilling

    The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian

    Jan 1, 1975

  • AUSIMM
    Pulverising Coal

    E. W. Stutchbury (Internationa~ Oombustion Aust. Ltd.) : Mr. Callcott made particular mention in his paper of erosion in primary air fans which are placed after the mill discharge. He adds that subseq

    Jan 1, 1957

  • AUSIMM
    Flint Clays of the Merrygoen-Digilah Area

    The area between Merrygoen and Digilah is located on a structural high that separates the Sydney Basin from the Great Artesian Basin, and hence the stratigraphic succession of younger rocks overlying

    Jan 1, 1973

  • AUSIMM
    Down-Hole XRD Analyses as a Guide to Hydrothermal Alteration in the Wharekirauponga Epithermal Gold-Silver Prospect, Hauraki Goldfield, New Zealand

    By R Soong

    The Wharekirauponga (WKP) epithermal gold-silver deposit is located about 10 km north of Waihi in the Hauraki Goldfield east of Auckland. WKP is notable for its sheeted to stockwork quartz veins hoste

    Jan 1, 2001

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • NIOSH
    Introduction - The Mission (c66faee9-c577-4c7d-8a77-1b62b2f800d7)

    When the Organic Act of 1910 established the Bureau of Mines within the Department of the Interior, the Bureau's programs involved only health and safety research and education, and fuels testing

    Jan 1, 1976

  • NIOSH
    Bulletin 232 Manual for Oil and Gas Operations

    By T. E. Swigart, C. E. Beecher

    The Federal Government, as the largest lessor of oil and gas lands in the United States, is vitally interested in the conservation of those resources. This manual has been prepared at the direction of

    Jan 1, 1923

  • SME
    An Investigation Into The Use Of Backfill Zones And Yielding Pillars For Subsidence Control

    By Keith A. Heasley, Lee W. Saperstein

    This paper investigates the use of backfill zones and yielding pillars for subsidence control. The investigation begins by choosing an appropriate subsidence predictive technique to simulate the propo

    Jan 1, 1986

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • TMS
    An Efficient Method of Stirring Melt With a Modulated Traveling Magnetic Field

    By Xiaodong Wang

    A liquid metal flow generated by a magnetic field whose traveling direction is periodically reversed, the Reversed Traveling Magnetic Field (R-TMF) is studied. The modulation frequency ranges from 0 t

    Jan 1, 2009

  • CIM
    The Nanisivik Mill

    By A. C. T. Bigg

    "The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of

    Jan 1, 1980

  • NIOSH
    New Publications Of The Bureau Of Mines - List 937 - Jan.- Feb. 1995 - Electronic Information

    Commodities statistics and otter information are available through the following t et systems: Internet Access: To acccess the USBM Gopher server on Internet, connect to: gopher.usbm.gov port 70, us

    Jan 1, 1995

  • AUSIMM
    Processing Options for Phosphate Ores with High Fe and Al Contents

    The prospect of utilisation of phosphate ores which contain high P2O5 values associated with Al and Fe has produced a great deal of interest over many years. Processing options have generally been bas

    Jan 1, 1990

  • NIOSH
    OFR-35-88 Prediction Of Incipient Electrical-Component Failures

    By Jeffery L. Kohler

    This final report on Bureau of Mines Contract J0338028 presents the results of a research effort to predict incipient failure in electric-power-system components. The development of continuous monitor

    Jan 1, 1987