Drivage System In Retreat Longwall GateroadBy Kikuo Matsui
In a difficult economic environment, the coal mines in Japan have been making extensive efforts in order to survive by rationalizing the mining operations. Introduction of a new longwall mining system
Jan 1, 1995
-
Developments in Improving the Standard of Installation and Bond Strength of Full Column Resin RoofboltsBy Peter Altounyan
Goedehoop Colliery in the Witbank Coalfield of South Africa produces some 8 million tonnes of coal from fully mechanised room and pillar mining methods, using resin anchored bolts as roof support. Inv
Jan 1, 2003
-
Skin Failure Of Roof And Rib In Underground Coal MinesBy Eric R. Bauer
Skin failures of roof and rib in underground coal mines continue to be a significant safety hazard for mine workers. Skin failures do not usually involve failure of the support systems but result from
Jan 1, 1999
-
Visual Recognition of the Load of Roof-Bolts by an IndicatorBy Joachim Leonhardt
Hundreds ofbolt-indicators were already used successfully in the German deep hard coal-mines to increase the safety and economy. The bolt-indicator offers the simple possibility to show roof-bolt (anc
Jan 1, 2001
-
Recent Innovations for Slope DevelopmentBy Tim Burgess
Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc
Jan 1, 2011
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
3D FEM Simulation For Fully Grouted BoltsBy Khaled Morsy
Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh
Jan 1, 2004
-
Analysis Of Cable Bolt Performance Using Numerical ModelingBy M. Bouteldja
A finite element modelling approach is developed for the evaluation of the mechanical performance of cable bolts supports in underground mine structures. The modelling approach permits the simulation
Jan 1, 1999
-
Variation In The Load Transfer Of Fully Encapsulated RockboltsBy Paul Hagan
A diverse range of rockbolt designs and resin anchors are available for use in underground mines. Despite their wide spread use, the factors that affect the performance a rockbolt is not fully underst
Jan 1, 2004
-
Comparison Of Multiple And Single Entry Roadways For Highly Stressed LongwallsBy Klaus Opolony
The world's most popular method of longwall mining requires multiple entry systems for the panels. In contrast to this mine layout the roadways in German coal mining are used for advanced mining
Jan 1, 2003
-
Roof Instability Rating (RIR) System and Its Application at Enlow Fork MineBy John C. Stankus
ldentifcation of potential roof problems in coal mines has long been a complex issue due to the wide variety of mining and geological conditions. It is well known that mine roof falls are related to m
Jan 1, 2001
-
Comparison of Pillar Strengths Calculated Using Empirical Equations and Finite ElementsBy Aarao de Andrade Lima
Mechanical properties typical of coal are used in the comparisons of pillar strengths based on finite elements and the empirical equations of Holland-Gaddy, Salamon-Munro, Obert¬Duvall, and Bieniawski
Jan 1, 1997
-
Effect of the Approaching Longwall Faces on Barrier and Entry StabilityBy Klaus-Dieter Beck
RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred
Jan 1, 2004
-
Advances in Remote Sensing Techniques for Monitoring Rock Falls and Slope Failures (17th CONFERENCE ON GROUND CONTROL IN MINING)By J. M. Girard
Ground control problems at surface mining operations can occur for a variety of reasons. Stress, gravity loading, rock strength, geology, pore pressure, weather effects, underground workings, and many
Jan 1, 1998
-
Development of Geotechnical Procedures for the Analysis of Mine Seismicity and Pillar DesignsBy Hamid Maleki
Mining in the Book Cliffs Coal Field of Utah has historically been associated with seismicity because of high-stress environments and the presence of stiff, competent rocks. Recognizing the geotechnic
Jan 1, 2003
-
A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal MinesA two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic
Jan 1, 1988
-
Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining OperationsBy Yi Luo
Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However
Jan 1, 2001
-
Application in Design for Close Proximity Multi-Seem MiningVirtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl
Jan 1, 1987
-
Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining MethodsBy Bruce K. Hebblewhit
Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein
Jan 1, 2001
-
Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and EvaluationBy Stephen Tadolini
Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no
Jan 1, 2002