Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
InterludeIf it had not been for the almost unbelievable adventures that came before and after, the last ten months of 19 15 would have been exciting enough for anyone. As it was they were a cheerful interlude.
Jan 1, 1976
-
Moderate Cover Bleeder Entry and Standing Support Performance in a Longwall Mine: a Case Study "Mining, Metallurgy & Exploration (2021)"By Ihsan Berk Tulu, Mark Alexander Van Dyke, Deniz Tuncay, Ted M. Klemetti
Bleeder entries are critically important to longwall mining for the moving of supplies, personnel, and the dilution of mine air contaminants. By design, these entries must stay open for many years for
Jan 7, 2021
-
South African Gold Production: How Long the Dominant Factor?By Edward H. Jr. Boyle, Paul R. Thomas
Introduction It is estimated that nearly 40% of all the gold ever mined in free world countries has been produced by South African operations. There is concern that this immense productive capacity w
Jan 11, 1984
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and ShaftBy Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Production OperationsBy Lee W. Saperstien
At the heart of the mining process are a number of basic and fundamental tasks whose regular and repeated performance constitute the mining cycle. As will be discussed presently, these tasks are the b
Jan 1, 2008
-
New Frontiers in Mining: Meeting 21st Century Challenges – Theme of SME Annual Meeting 2022By Tim O’Neil
Nearly 4,800 mining professionals and exhibitors occupying 580 booths attended the 2000 SME Annual Meeting and Exhibit, Feb. 28-March 1, in Salt Lake City, UT. The technical program included80 sessio
Jan 1, 2000
-
Sustainable mining operations with Atlas Copco’s productsBy L. Bergkvist
"History can provide many answers with regard to what today’s mining industry looks like and how we got to where we are today. It has always been self-evident that safety has to be given the highest p
Jan 1, 2011
-
The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and ResultsBy Enrique Fernandez
M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to
Jan 1, 2007
-
Reserve calculations, mining, and milling of Homestake Mining’s Open Cut project describedBy Jerry D. Pfarr, Gary Loving, David G. McDowall
Introduction The Open Cut is one of the best known landmarks in South Dakota's Black Hills. It is the site of the original discovery of the Homestake ledge, or lead, in 1876. Between that time a
Jan 10, 1987
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Expediting the Environmental Planning Process for Small Mine Permit ApplicationsBy Gary J. Fletcher
Mining and processing activities which are proposed on private land, state leases, or unpatented mining claims are governed by numerous local, state, and federal laws which identify the procedures and
Jan 1, 1987
-
Spectroelectrochemistry Of Enargite I: Reactivity In Alkaline SolutionsBy R. N. Gow
The presence of enargite (Cu3AsS4) is problematic in gold processing because it is environmentally hazardous due to its arsenic content but also because it is double refractory causing both cyanide an
Feb 27, 2013
-
Considerations for Baselining Groundwater Conditions for Tunneling ProjectsBy Steven W. Hunt, Isabelle Lamb, Steven B. Fradkin
Groundwater control is generally an important consideration and significant source of risk during most tunneling projects. Proper baselining of groundwater conditions requires: 1) a thorough understan
Jan 1, 2005
-
Opportunities for Plant-Site 3D Coarse Particle Characterization with Automated High-Speed X-Ray Tomography (f5f74fcc-44e0-47db-a251-7416acf76474)By J. D. Miller, C. L. Lin
"The use of 3D X-ray tomography analysis for plant-site characterization of coarse particles at a sampling rate of about 3 kg/min for particles ranging in size from 150 mm to 1 mm at a voxel resolutio
Jan 1, 2016
-
Rock Mechanics Study Of A Longwall PanelBy Lewis V. Wade
This paper summarizes the results of the rock mechanics monitoring program performed as part of Old Ben Coal Company's longwall coal mining demonstration project conducted in cooperation with the
Jan 1, 1977
-
Ground Support Systems for Heavy, Squeezing Ground at Burgin MineBy Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg
INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130
Jan 1, 1982
-
Annual Review 2006 – Exploration ReviewBy D. R. Wilburn
This summary of international mineral exploration activities for 2006 draws upon avail-able information from literature, industry and U.S. Geological Survey (USGS) specialists. The summary provides da
Jan 1, 2007
-
Bagdad Concentrator Process Control UpdateBy Peter Amelunxen, Craig Lockhart
Significant effort was made in 2003 and 2004 to upgrade the existing instrumentation and process control infrastructure at the Phelps Dodge Bagdad copper concentrator. Specifically, • cameras were
Jan 1, 2005
-
Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, IranBy Jafar Khademi Hamidi
The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne
-
An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical ModelingBy Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson
Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen
Jan 1, 2000