Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Challenges And Solutions To Designing Deep Excavations For Urban Transit StationsBy Ching-Liu Wu, John Hawley, Andrew H. Liu, James Chai
The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the
Jan 1, 2007
-
Review of Organic Binders for Iron Ore Concentrate AgglomerationBy S. K. Kawatra, J. A. Halt
"Low-grade iron ores are finely ground and processed to recover iron-bearing minerals. However, the iron-rich powder is too fine to be used directly in blast furnaces and most direct reduction furnace
Jan 1, 2015
-
What Will Halt The Worldwide Decline In Mine Equipment Performance?By R. Adsero
The analysis of equipment trends in AUSIMM?s Revision of Monograph 19; Australasian Mining and Metallurgy Operating Practices (AMMOP) in the paper by Dight et al (in press) raised some interesting and
Feb 27, 2013
-
An Integration Of Long-Term Mine Planning, Tailings And Reclamation PlansOil sands processing generates huge volumes of slurry, known as tailings, that is being stored in tailings ponds. The volume of produced tailings is a very important factor in oil sands surface mine p
Feb 27, 2013
-
Limestone Marketing In A Changing Economy - The Economic RealitiesBy Robert C. Freas
While on the surface limestone marketing may appear mundane, it has continued to provide a series of challenges beyond the realm normally envisioned with this industry. This paper presents a case hist
Jan 1, 1981
-
Carbon Emissions From Base Metals - Preprint 09-096By M. J. Farrell
Mining is a significant emitter of greenhouse gases and is the focus of increasing attention from green groups and regulators. Miners need to know their own carbon emissions and how they compare with
Jan 1, 2009
-
The Big Walnut—A Planned ApproachBy Tom Szaraz, Steve Skelhorn
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through
Jan 1, 2007
-
Influence of Rock Mass Properties on Performance of Hard Rock TBMsBy Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh
Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec
Jan 1, 2005
-
Relationship Between Bond Work Index And Textures And Cooling Method Of Granulated And Cooled Ferronickel Refining SlagsBy D. Richter
The Pyrometallurgical refining stage of ferronickel manufacturing produces a slag rich in iron and nickel, which is usually further processed for metal recovery. The recovered material is returned to
Jan 1, 2011
-
Mine PreplanningBy Christopher J. Bise
INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula
Jan 1, 1986
-
A Mathematical Programming Model For Open Pit Short-Term Production SchedulingIn this paper, a mixed integer linear programming (MILP) model for the short-term scheduling of open pit mines is formulated. The proposed model aims at sequencing the blocks extraction over multiple
Jan 1, 2011
-
Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, TexasBy Greg Wieland
Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.
Jan 1, 2008
-
Release Of Heavy Metals From Sulfide Flotation Tailings Under Deepwater Discharge EnvironmentsBy H. K. Lin
Deepwater discharges of sulfide flotation tailings have been practiced for several decades. Oxygen penetration and organic matter content in such environments are the two major factors that determine
Jan 1, 2009
-
Mojave Sustainability Project – Model For Community PartnershipsBy Neville Slade, Doug Shumway, Dayan Anderson, Joe Siefke, Curtis James
The Mojave Desert is a particularly fragile ecosystem that faces several significant impacts. These include rapid housing development, overdrafted water supplies and loss of wildlife habitat — all a
Jan 1, 2005
-
Cable-Shovel Dipper DynamicsBy M. A. Raza
Cable shovels are capital-expensive and primary production equipment in many surface mines. The forces acting on the shovel dipper vary as the dipper moves through the muck-pile. The variations in the
Jan 1, 2011
-
Recovery Of Zinc From Metallurgical Dusts And Fumes (83e8ef4f-c1d2-450c-958c-952d3d39e665)By D. Pearson
About 15,000 tonnes of zinc per year is present in the dusts and fumes produced in electric arc and BOS steelmaking, secondary copper refining and brass ingot making. Apart from the use of some coppe
Jan 1, 1980
-
Mining Matters At National Western Mining ConferenceWith unprecedented worldwide growth and increasing global demand for energy expected to swell by 60 per-cent in the next two decades, mining matters as much now, if not more, than it ever has. This w
Jan 1, 2008
-
EPA’s EPCRA Assistance Visits: Getting Prepared (EPCRA Actually Consists Of Sections Other Than 313?)By K. Ward
The Environmental Protection Agency (EPA) is beginning to provide compliance assistance visits to various industries, including mining, for Emergency Planning and Community Right-to-Know Act (EPCRA) c
Jan 1, 2001
-
Determining Quantitative Mineralogy Using A Modified Modan Approach On The Questa Rock Pile Materials, New Mexico - Preprint 09-020By V. T. McLemore
Petrographic analysis of rocks is traditionally performed with optical microscopy using thin sections and point counting. However, this does not provide accurate mineral proportions for sedimentary, v
Jan 1, 2009
-
Current Status of Federal Regulations and Rulemaking in Governing Subsidence Due to Underground MiningBy Dermot Winters
The Surface Mining Control and Reclamation Act (SMCRA, or the Act) was enacted on August 3, 1977. The Act was written, in part, to put an end to uneven environmental standards and to establish minimum
Jan 1, 1986