    Reactive Ground Blast Management in a South Africa Open Pit Manganese Mine

    By Grant Small, Deon Pieterse

    Reactive ground conditions at an open pit manganese mine in the Northern Cape of South Africa resulted in an unexpected detonation.

    Feb 1, 2020

  • ISEE
    Tug Fork Big Bend Cutoff Blast Monitoring Study

    By Charles E. Joachim

    Railroad and blast induced vibrations were measured in the vicinity of the proposed Big Bend Cutoff. Peak horizontal and vertical particle velocity relations were developed using least squares regress

    Jan 1, 1984

  • ISEE
    Physical Security On-Siite Magazines, Keys, Trucks & Periimeters

    By John Brulia

    "Definition of On-Site Security: All mandatory and non-mandatory, deterrent and loss control measures undertaken by an authorized explosives business tokeep its stocks of explosive materials and precu

    Jan 1, 2006

  • ISEE
    Field Application of Concentrated Remote Control Blasting System

    By Minoru Kawamora, Koichi Kurokawa, Kenji Hashimoto

    We developed concentrated remote control blasting system to blasting simultaneously at a large number of sites in a mine of large scale. This system is consisted of three parts, the first part is a co

    Jan 1, 1990

  • ISEE
    Worsey-Silva Equation for Modeling Fragmentation Caused by Row Timing

    By J. Silva, T. Worsey

    The Worsey-Silva equation determines the optimal row timing for the smallest fragmentation and allows fragmentation models to be adjusted due to row timing. The equation utilizes the concept of dynami

    Jan 1, 2024

  • ISEE
    Small Borehole Blasting in High Liability Locations

    By Geff Gordon, Dale Nies

    Small diameter borehole blasting can be very efficient and cost effective. As residential development continues to expand, many areas are now requiring blasting for site preparation and upgrading old

    Jan 1, 1990

  • ISEE
    Fugitive Carbon Based Gases Blasting Related or Not

    By Fred Baldassare, Marcia Harris, Kenneth K. Eltschlager

    Surface mine blasting was recently investigated as a potential source of high concentrations of stray gases found in nearby residences of western Pennsylvania. In one incident carbon monoxide was dete

    Jan 1, 2004

  • ISEE
    Determination of Seismic Velocity from Quarry Blasts Using GPS Enabled Vibration Monitors

    By William. J. Birch, Catherine. E. Johnson, Robert Farnfield

    Rocks and other materials can be characterized by their elastic properties. However, seismic velocities represent a more practical set of physical properties for seismic methods. Seismic velocities de

    Feb 6, 2023

  • ISEE
    New Horizons of the Engineering of Blasting in Service of Productivity: Selective Sequencing

    By Matias Suarez, Diego Zenteno

    This paper is aimed to display the new advancements of blasting engineering done in different mining sites throughout the country, associated to electronic sequencing, energy of the explosive and its

    Feb 1, 2020

  • ISEE
    Managing Risk – Evaluating Existing and New Tools Used in Industry

    By Kristen R. Bingham

    "Today, more than ever, drilling and blasting contractors are challenged to manage the ever-changing risks associated with blasting operations. New neighborhoods are encroaching upon mine sites and bl

    Jan 1, 2017

  • ISEE
    Blast Segmentation for Vibration Management

    By Lee Julian

    Ground vibrations generated by mine blasting must be controlled to comply with legislation and to protect sensitive local or site infrastructure. The consequences of exceeding imposed limits can range

    Jan 1, 2014

  • ISEE
    Vibration prediction from controlled blast tests

    By Nadir Plasencia, Rogerio: Neves Mota

    The evaluation of vibrations induced to build structures is one of the main concerns when dealing with blast works. EDP, the main Portuguese producer of electricity is presently incrementing energy pr

    Jan 1, 2008

  • ISEE
    A Rational Method for Predicting Damage to Historical Structures Subjected to Blasting Vibrations

    By Kenneth Medearis

    The accurate prediction of possible damage to historic structures subjected to blasting-related ground motions is not infrequently the dominant factor in whether or not a mining or quarrying operation

    Jan 1, 1993

  • ISEE
    In-Plant Demolition of 900 Cubic Yard Machine Base

    By Ed Jr Smith, Calvin J. Konya

    The purpose of this paper is to describe the case history of a blasting project conducted jointly by Precision Blasting Services and Cherokee Explosives. It is the intent of the authors to show how bl

    Jan 1, 1986

  • ISEE
    Attenuation of Blasting Vibrations in South Florida, Part II

    By Greg Mclellan, Mark Johnson, John Pepper

    In this paper, the measured vibrations are plotted in terms of the individual PPV components versus Scaled Distance (SD) on logarithmic scales. The maximum PPV is pIotted on a separate graph and equat

    Jan 1, 2001

  • ISEE
    Elements of Dynamic Airblast Overpressure Modelling

    By A. S. Romphf, C. K. McKenzie

    Recent full-scale field studies involving single-hole charges fired to free faces under a wide range of operating conditions have delivered precious insights into airblast characteristics and propagat

    Jan 26, 2026

  • ISEE
    Comparison of Highwall Control Methods at Bayswater Colliery

    By Tapan Goswami, Michael Croucher

    At Bayswater Colliery various methods of controlling highwall stabii were investigated. The use of presplitting was trialled and its effectiveness measured. The presplit hole spacing and explosive cha

    Jan 1, 1999

  • ISEE
    Modeling VOD and Initiation Effects on Blast Vibration PPV Using Nonlinear Charge Weight Scaling and Variable Time-window for Charge Elements

    By Mathias Jern, Ruilin Yang

    A blast vibration model has been developed that simulates effects of almost all blast design parameters on the blast vibration peak particle velocity (PPV) from a production blast with multiple blasth

    Jan 1, 2019

  • ISEE
    Blast Optimization from Drone Imagery

    By Markus Pötsch, Andreas Gaich

    Optimization of surface blasting based on 3D models from drone imagery and a closed loop that starts with an automatic analysis of the geometry and the geological conditions and ends with an objective

    Feb 1, 2020

  • ISEE
    Preventing Blast Damage to Underground Infrastructure from Open Pit Operations

    By C. Liley

    Open cut blasting at the Ernest Henry mine has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project which was conducted to