Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? Synopsis

    By Z. G. Lin

    In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate

    Jan 1, 2010

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • DFI
    Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?

    By Bernard Hertlein

    ¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser

    Jan 1, 2001

  • DFI
    SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event

    By Richard T. Stain

    "In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred

    Jan 1, 2005

  • DFI
    Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon Construction

    By Ray Schmahl

    The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin

    Jan 1, 1990

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • DFI
    Fenway Park Modernization - Foundations For A Red Sox Nation

    By Mark H. Balfe

    Over the last decade, Fenway Park has undergone annual improvements to modernize the facility for players and fans. These renovations include the Monster Seats, the Right Field Roof expansion, a new

    Jan 1, 2011

  • DFI
    The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - Summary

    By Murray Gamble

    A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo

    Jan 1, 1997

  • DFI
    Recent Evolutions In Deep Foundation Technologies

    By Maurice Bottiau

    It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses

    Jan 1, 2006

  • DFI
  • DFI
    Recent Advances In Quiet & Vibration-Less Steel Pile Installation & Extraction

    By Ray. K. Filip

    The concept of installing a steel sheet pile retaining wall into the ground by "pressing" has resulted in the development of various equipment solutions over the last thirty years e.g. Taylor Woodrow

    Jan 1, 2006

  • DFI
    Influence of Presence of Overlaying Sand on Rock Socket Length of Bored Pile

    By Priyadharshini M. R., Premalatha K

    "Abstract With the development in the construction of heavily loaded structures, the necessity of pile foundations has increased. For the transfer of heavy loads, it is mandatory that the piles need t

    Jan 1, 2014

  • DFI
    Trends In Deep Foundations In Europe ? Synopsis

    By R. Stenne

    This paper presents the trends in deep foundations in Europe, both in terms of design and construction. Eurocode 7 which is a design code for geotechnical engineering will be introduced in the Eur

    Jan 1, 2000

  • DFI
    Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill Ground

    By Shaw-Shong Liew

    This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.

    Jan 1, 2006

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    Economic Foundation Design For Tall Buildings

    By Frances Badelow

    This paper describes a design process for piled raft foundations supporting high-rise buildings. The design process comprises an initial stage of geotechnical site characterization using the results o

    Jan 1, 2006

  • DFI
    Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? Synopsis

    By Y. G. Qin

    In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i

    Jan 1, 2010