Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)By Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASINGBy Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special ApplicationBy Andhra Pradesh, Nagarajkumar B. V
As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad
Sep 1, 2022
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted PilesBy David T. Farber
"Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste
Jan 1, 2005
-
Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - SynopsisBy George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA FinalistBy Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Difficulties In Caisson ConstructionBy Ronnie W. Sisk
1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum
Jan 1, 1988
-
Risk Management Techniques to Avoid LitigationBy Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
Design And Construction Of Shear Pins For Landslide StabilizationBy Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New OrleansBy Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) MethodBy Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
Sustainability and the Future for the Deep Foundations IndustryBy Tony Suckling
"As we head toward the United Nations Climate Change Conference in Copenhagen in December, the environment and sustainability will become headline news for a while. Governments are expected to agree t
Jan 1, 2009
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) MethodBy Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.