Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Autogenous and semi-autogenous mill circuits

    By A. K. Ratte, C. M. Brown

    "IntroductionIn autogenous mills, grinding of the ore feed is accomplished by the direct action of the variously sized rocks making up the feed on each other and the mill interior. Size reduction is a

    Jan 1, 1989

  • CIM
    Selective Extraction and Recovery of Gold, Copper, and Other Base Metals from Mine Leach Cyanide Solutions Using Molecular Recognition Technology (MRT)

    By Ronald L. Bruening

    IBC has developed a cost effective MRT process for the selective extraction and recovery of gold, copper, and a mixture of other base metals from mine leach cyanide solutions. This is a two-stage syst

    Oct 1, 2003

  • CIM
    Hematite Deposits, Steeprock Lake

    By M. W. Bartley

    DURING the field season of 1938, the Ontario Department of Mines assigned a combined geological and geophysical survey patty to the investigation of the location, genesis, structural relationships, an

    Jan 1, 1939

  • CIM
    The Pronto Mine

    By James A. Robertson

    "The Pronto Mine located at the east end of Lake Lauzon, Long Township, some 12 miles east of Blind River is of historic note being the discovery locality and the first producing mine of the Elliot La

    Jan 1, 1986

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • CIM
    Selection of optimum ferronickel grade for smelting nickel laterites

    By B. Wasmund, M. Y. Solar, I. Candy

    The nickel laterite industry is divided into two camps when it comes to the grade of the ferronickels produced. One group, led by Falcondo and Cerro Matoso, markets high-grade ferronickels in the rang

    Jan 1, 2008

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    DynoMiner? APS Gassing Trials Stillwater East Boulder Mine

    DynoMiner APS Delivery Systems Overview ? New Design of DynoMiner APS-M2 ? Stand alone or attach to Cargo type 10,000 lb (4536 kg) emulsion bins. ? Hose reel w/200-ft (61-m) by 1-inch I.D (25-mm)

    May 1, 2004

  • CIM
    The Use of Charcoal as an Alternate Internal Fuel Addition in the Pelletising Process

    By Keith R. Vining

    Solid fuel, usually coke or anthracite, is commonly added to ground iron ore fines in the pelletising process to reduce the amount of burner fuel required and the maximum firing temperature, while mai

    May 1, 2007

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Water Management in Hydraulic Fill Operations

    By M. Helinski

    In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,

    May 1, 2007

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy

    By J. Châteauneuf, R. Dupéré, D. Mrabet

    "In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a

    Jan 1, 2016

  • CIM
    Microprocessor studies in process metallurgy

    By K. Ananthanarayanan, R. I. L. Guthrie, S. A. Argyropoulos

    "The low cost and availability of micro-computers and their peripherals provides the metallurgical engineer with the opportunity to use such computers in a wide variety of applications. In this paper,

    Jan 1, 1980

  • CIM
    Historical development of the INCO SO2/AIR cyanide destruction process

    By G. H. Robbins

    "Originally presented at TORONTO 94, CIM-AGM, this paper has been updated to reflect the present status of business development for theSO2/AIR process. The paper reviews the back-ground leading to the

    Jan 1, 1996

  • CIM
    Is the double drum hoist still viable at depth? Recent experiences (9ce85c2c-8422-465d-9ba0-c7f38d7a04a5)

    By B. McLaughlin

    "The Penna shaft is the deepest single-lift shaft in North America. Agnico-Eagle started sinking the Penna shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240-m deep shaft. Ex

    Jan 1, 2004

  • CIM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimizing the Rate of Froth Recovery using Outokumpu Froth master™

    By Peter Bourke, Marc van Olst, Seppo Ronkainen, Natalie Brown

    "Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and r

    Jan 1, 2001