Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure

    Jan 1, 1985

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • CIM
    Novel High Efficiency Gold Extraction Process Using Nanotechnology

    By Adil Aledresse, Louis Mercier, Laxman Amaratunga

    "The development of high capacity adsorbents with uniform porosity denoted, MP-HMS (Mercaptopropyl – Hexagonal Mesoporous Structure) using nanotechnology, and their ability to extract gold from soluti

    Jan 1, 2008

  • CIM
    Simulation of an Iron Ore Concentration Circuit Using Mineral Size Recovery Curves of Industrial Spirals

    By Pierre Roy, Claude Gosselin, Maryam Sadeghi, Michel Bourassa, Christian Rochefort, Claude Bazin, Gautier Mahieu, François Lavoie, Marilène Renaud, David Cataford

    "Spirals are gravity concentrators used for the concentration of iron oxide minerals from ores. This paper presents the mineral size recovery curves observed for spirals operating in two Canadian iron

    Jan 1, 2014

  • CIM
    Indicator Mineral and till Geochemical Methods for Kimberlite Exploration in Glaciated Terrain

    By M. Beth McClenaghan

    This paper summarizes diamond exploration techniques used in glaciated terrain, focusing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history,

    May 1, 2002

  • CIM
    Iron Sulfide Minerals in Thiosulfate-Gold Leaching: Some Problems and Solutions

    The negative effects of pyrite and pyrrhotite on thiosulfate gold leaching have been investigated. Possible remedies to reduce some problems are discussed. In a gold bearing pure silicate ore, 92% of

    Jan 1, 2005

  • CIM
    Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element Approach

    By S. Stefanizzi

    In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used

    May 1, 2009

  • CIM
    Leaching of a Gold Ore Using the Hydrogen Sulfide-Bisulfide-Sulfur System

    By P. West-Sells, B. Wassink, N. Fisher

    Gold leaching from a commercial cyanide-amenable gold ore was studied at 25°C using sodium bisulfide-hydrogen sulfide solutions containing elemental sulfur. Gold extraction from the ore using 0.55 M N

    Jan 1, 2005

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )

    By Trevor Yeomans

    "NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o

    Jan 1, 2008

  • CIM
    A MultiGaussian Approach to Assess Block Grade Uncertainty

    By Julián M. Ortiz

    Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a

    May 1, 2004

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    Administration Building Miners? Change-Rooms and General Offices of the McIntyre Porcupine Mines, Limited

    By Angus D. Campbell

    Introduction In the Twentieth Annual Report of the Mcintyre Porcupine Mines, Limited, for the year ending March 31st, 1932, the General Manager, Mr. R. J. Ennis, said: "During the period under revie

    Jan 1, 1933

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek Mine

    By Sergio Cattalani, David J. Kerr, Harold L. Gibson

    Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13

    Jan 1, 2000

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009