Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Climate and Hydrology Data Collection for Northern Mine DevelopmentBy Nathan P. Schmidt
Climate and hydrology data are required during all phases of mining projects, including impact assessment, mine planning and design, operational water management and mine closure and reclamation desig
May 1, 2004
-
Evaluating the Effect of Seeding on Zinc Recovery through the Zincor Iron Removal CircuitBy Jochen Petersen, Diane Taggart
"At an average of 90.3% (for the period of 1 January 2009 to 30 September 2011), Zincor’s zinc recovery was well below the industry standard of 96%. The losses through the residues, in particular the
Jan 1, 2016
-
Wireless Networks What You Must Have to be SUCCESSFULBy Gary Anderson
??Privately Held Corporation ??Incorporated in Delaware, May of 2002 ??HQ in Malvern, PA (just outside Philly) ??Approx 40 employees ?9 Field Engineers ?MSHA Certified ?10 Development/NOC Enginee
May 1, 2009
-
Hydrogen Cracking and Fracture of Galvanized Transmission Tower BoltsBy J. C. Thornley
Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si
Jan 1, 1979
-
Conjugate Oblique-Extension Veins in Shear and Tensile Fracture Systems at the Komis Gold Mine and Mufferaw Gold Prospect, Northern SaskatchewanBy Bruno Lafrance
Abstract - Quartz veins at the Mufferaw gold prospect and Komis gold deposit, northern Saskatchewan, are examples of oblique-extension veins that crystallized in shear and tensile fractures, which pro
Jan 1, 2004
-
Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approachesBy A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak
A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic
Jan 1, 2007
-
The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)By George H. Hope, Steve Ciccone
"The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe
Jan 1, 2003
-
Evaluation of Location Based Management System in the Construction of Power Transmission and Distribution ProjectsBy Abhiram Shankar
Construction projects are becoming more demanding both in terms of time and complexity. This necessitates intricate planning and sequencing of activities at the macro and micro level and continuous fl
Aug 1, 2013
-
Man's first use of jarosite: the pre-Roman mining-metallurgical operations at Rio Tinto, SpainBy J. L. Jambor, J. E. Dutrizac, J. B. O'Reilly
The present-day metallurgical community is quite familiar with the use of jarosites [MFe3(S04)2(0H)6 where M = K, Na, NH4, Ag, 1/2Pb, etc.] as a means of controlling iron, alkalis and sulphate in hydr
Jan 1, 1999
-
Recent Investigations on the Nature, Preparation, Storage, and Coking of Typical Coals from the Sydney Area, Nova ScotiaBy R. E. Gilmore
Introduction The Sydney coal-field extends for a distance of thirty miles along the northeastern coast of Cape Breton island. At a central focal point at the tip of the south arm of Sydney harbour, s
Jan 1, 1933
-
Vision for a Risk Adverse Integrated Geometallurgy FrameworkBy Guillermo Turner-Saad
"Best practice in the economic evaluation of mining projects and operations is based on the integration of geological, mining, metallurgical, environmental, marketing, economic and corporate informati
Jan 1, 2010
-
Flotation Circuit Analysis at Zinifex Century MineBy Dan Alexander, Ivan Crnkovic, Sarah Schwarz
"Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur
Jan 1, 2008
-
The Anisotropic Character of Talc Surfaces as Revealed by Streaming Potential Measurements, Atomic Force Microscopy, and Molecular Dynamics SimulationsBy J. Nalaskowski
A study of the interfacial properties of the basal plane and the edge surfaces of talc is described in this paper. The isoelectric point measured at the two different crystallographic planes by the st
Jan 1, 2006
-
Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore TailingsBy X. S. Yuan
With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha
Jan 1, 2006
-
Capital Cost Estimating for Mineral Processing PlantsBy R. J. Balfour, T. L. Papucciyan
"INTRODUCTIONCapital Cost considerations are basic to feasibility in the achievement of success for Mineral Processing Projects as much as or more than in many other industries. Capital cost is an imp
Jan 1, 1972
-
Gold recovery from waste-activated carbon— a comparison between mechano-chemical pretreatment and charcoal augmented oxidationBy W. K. Buah, R. K. Amankwah
Waste-activated carbon generated by gold ore processing plants that employ carbon adsorption technologies may contain very high gold values and represent a potential source of extra revenue. In this r
Jan 1, 2007
-
Tailings Disposal Area Development at Inco Sudbury OperationsBy J. P. Van Cruyningen, M. J. Puro
"A 2400 acre extension to the existing Tailings Area is under development at Inco's Copper Cliff Milling operations.The new area is being developed in stages as production levels dictate thus minimizi
Jan 1, 1987
-
Development of the automatic GO-60 drillBy R. England
"This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.
Jan 1, 1987
-
Radon barriers for underground uranium mine useBy James F. Archibald, H. Jame Hackwood
"Research was performed to assess the feasibility of barrier membrane substances, for use within mining or associated high risk environments, in restricting the diffusion transport of radon gas. Speci
Jan 1, 1987
-
Summary Of The EU Voluntary Copper Risk AssessmentBy K. Delbeke
Within the framework of the EU Existing Substance (93/793/EEC) and REACH regulations EC/1907/2006), the copper industry initiated in 2000 a comprehensive Voluntary Risk Assessment of copper and severa
Jan 1, 2007