Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Quantification of Drill Hole Deviation – Century Mine Case StudyBy C D. Pocock
Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to
Nov 8, 2011
-
Influence of Iron Bearing Carbonates and Reactive Iron Sulfides on Acid Rock Drainage Static Predictive TestworkBy J Thoma, W Skinner, W Stewart, R Smart
The acid neutralisation capacity (ANC) of rock sample containing significant iron carbonates and/or reactive framboidal pyrite can be a difficult parameter to determine. Results indicated that negativ
Jan 1, 2003
-
Permitting in the face of uncertainty – how to deliver confidence to regulators and investorsBy R L. Grogan
Mining is currently undergoing a progressive expansion into novel environments (such as the deep ocean), commodities (such as tantalum, rare earths, and other ‘green economy minerals’), and new method
Jul 25, 2018
-
Integrated Communications for Surface and Open Pit ApplicationsBy G Booth
Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope
Jan 1, 2008
-
Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspectiveBy A Kleinitz, J Halilovic, K Trappitt
Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne
Mar 22, 2022
-
Dredger drop impact on slope stability – Hazelwood MineBy J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4
ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du
Jun 21, 2022
-
Reply to Contributed Discussion (this issue) by John Shepher and L. Keith RixonBy ALAN J. HARGRAVES
It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec
Jan 1, 1983
-
Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and ConstructionBy A Hughes, S G. Rosin
This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the
Sep 17, 2014
-
Mining automation human-systems integration – CMOC-Northparkes case studyBy J Cronin, R Burgess-Limerick, T Horberry, L Steiner
"Automation offers the mining industry great potential for improvements in productivity and safety. However, the experience of introducing automation in other industries has been that the full potenti
Oct 16, 2017
-
Jameson Cell Test Work on Copper Streams in the Copper Concentrator of Mount Isa Mines LimitedBy Griffin PT, Espinosa-Gomez R, Jameson GJ
Two major issues are to be addressed in the Copper Concentrator of Mount Isa Mines Limited. The first of these is the need to increase concentrator flotation capacity to increase copper recovery, wh
Jan 1, 1993
-
Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, AustraliaBy L Bertoss, D Carvalho
In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil
May 24, 2023
-
Climate, safety leadership, and critical risk management in the Australian mining sectorBy A Fern, A Hawkes, o
This presentation will cover: the importance of high-quality safety leadership; insights from a Safety Climate Survey that includes responses from 7903 employees working at 19 Australian mining organi
Apr 16, 2024
-
Mining-RoX – Mobile Robots in Underground MiningBy H Mischo, M Ferber, M Donner, B Jung, S Grehl, A Dietze
Mobile robots have been making impressive inroads in a variety of domains. Within the Mining-RoX project, Technical University Bergakademie Freiberg is exploring a further frontier for mobile and auto
Nov 4, 2015
-
Sublevel Open and Fill Stoping Method Used in the Hedong Gold Mine (9bf3555f-32de-4bf1-9441-2d6607584635)By Wang J, Ma Y, Jia H
The Hedong Gold Mine is located in the Yan(ai area, tihandong hroo%ill, e. China. It is an underground mine with an annual gold output of some 700 0(H) grams. The orebody is located on the edge of t
Jan 1, 1998
-
Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer ProjectsBy N Lewis
Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying
Mar 8, 2011
-
Electron Microprobe Mapping ù A Diagnostic Tool for Ilmenite CharacterisationBy C MacRae, N Wilson
CSIRO Minerals has recently developed an electron microprobe (EMP) based imaging (or mapping) method for characterising ilmenite concentrates. The method requires an electron microprobe analyser to co
Jan 1, 2001
-
Underground Mines of TomorrowBy P Hatherly, H Gurgenci
With the depletion of the mineral reserves that can be mined by surface mining, demand for highly productive and safe underground mines will increase. Underground drill and blast techniques continue t
Jan 1, 1998
-
Mechanical Properties of Cementitious Grout Serving in Fully Grouted Cable Bolting SystemsBy P C. Hagan, J Chen, S Saydam
Fully grouted cable bolts have been used in underground mining industry for more than 40 years and are becoming more and more popular especially when severe geological conditions are encountered, such
Nov 5, 2014
-
Glass Earth's Greenfields Gold Discovery Strategy Using Multi-Faceted Airborne Geophysical Surveying is Poised to Rewrite the Geology Of Central OtagoBy S Henderson
The Otago Goldfield has produced approximately 8 million ounces of alluvial gold and over 2.5 million ounces of hard rock gold and is currently home to New ZealandÆs largest producing gold mine. In th
Jan 1, 2007
-
Defining Residual Risk for Successful Mine Closure – a Geochemical PerspectiveBy T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham
Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a
Jun 28, 2016