Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ballarat East-From Eureka to the 80's

    This paper puts the view that, for one gold deposit in Victoria at least, the Australasian Code for the Reporting of Identified Mineral Resources is severely deficient. The author questions whether

    Jan 1, 1990

  • AUSIMM
    Flotation machine gas characterisation – variation between different types of flotation machines

    By D Felipe, G J. Harbort

    In the past 40 years substantial changes have occurred in flotation machines. This has included increases in mechanical cell size to 630 m3 , significant changes to flotation column aeration design

    Aug 24, 2022

  • AUSIMM
    Challenges in Developing Integrated Process Models Based on Industrial Survey Data

    By M Yahyaei, F Vos, J Siliezar

    Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such

    Sep 1, 2014

  • AUSIMM
    Bulk sensing for effective ore sorting – learnings over 35 years

    By H Kurth, L Balzan

    The potential for bulk diversion was identified and quickly implemented following the development of bulk sensing technologies applied to conveyed flows. In the early 1980s real time analysis of ash i

    Nov 10, 2020

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    Using Geostatistics to Assist in Optimising Grade Control Estimation at KCGM's Fimiston Open Pit

    By Kelly D, Moore C

    The Golden Mile, which has been mined continuously for the past 100 years by both underground and more recently open pit methods, occupies an area of 1.2 km by 4 km adjacent to the city of Kalgoorli

    Jan 1, 1994

  • AUSIMM
    Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi

    By M Sparrow

    The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun

    Mar 8, 2011

  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    Development of a Turbulent Flotation Model

    By R-H Yoon

    A turbulent flotation model has been developed by considering the subprocesses of collision, attachment, detachment, and froth recovery. AbrahamsonÆs model (1975) of infinite Stokes number is used to

    Jan 1, 2005

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Sustainability in Mining Engineering - Strategies Through Education and Research

    By A J. Gunson

    The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain

    Jan 1, 2009

  • AUSIMM
    Improving flotation hydrodynamics to maximise nickel recovery from tailings

    By M Yvon, S Parkes, K P. Galvin, P Wang

    Mineral liberation is critical to maximise the grade and recovery of nickel, however this objective is challenged considerably by the poor flotation kinetics, especially that of ultrafine particles (K

    Aug 24, 2022

  • AUSIMM
    Improved Cleaner Circuit Design for Better Performance Using the Jameson Cell

    By R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro

    In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily

    Sep 1, 2014

  • AUSIMM
    Automatic search strategy for ROM stockpile recovery optimisation

    By M Wagner, H Assimi, F Neumann, C Garcia, B Koch

    Run-of-Mine (ROM) stockpiles are the inventory of valuable materials extracted from the mine. Depending on the customer requests, a selective addition of ore from stockyards should be selected at the

    Nov 10, 2020

  • AUSIMM
    Characterising the Spontaneous Combustion Propensity of Waste Rock

    By J Theiler, B Beamish

    The presence of reactive metal sulfide minerals in waste rock contributes to the hazard of spontaneous combustion in dumps, as these minerals react with air and water entering the dump at ambient temp

    Jun 28, 2016

  • AUSIMM
    In situ dynamic testing of mesh straps and W-straps

    By P Mikula, B Darlington, J Graham, P Young

    In underground mines experiencing dynamic events, there is an ever-present challenge to design and maintain a capable ground support system. One key component of ground support systems is surface supp

    Nov 29, 2022

  • AUSIMM
    Ambuklao Tunnel Plug Construction

    By B Hayes

    The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956

    Mar 8, 2011

  • AUSIMM
    Determining the Deportment of Minor and Trace Elements in Base Metal Concentrates, with an Example from Broken Hill

    By F Radke, P A. Tilyard

    Determination of the mineralogical location (deportment) of minor and trace elements (including credit and penalty elements) in base metal concentrates can indicate whether further processing is likel

    Jan 1, 1998

  • AUSIMM
    Mine reconciliation standardisation – R Factor Series

    By R Hargreaves, T Elkington, W J. Shaw, G W. Booth

    Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions

    Mar 22, 2022