Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine to Mill Reconciliation - Three Case Studies

    By J T. Carswell, N A. Schofield

    Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the

    Nov 20, 2012

  • AUSIMM
    Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ

    Jan 1, 1980

  • AUSIMM
    Assessment of Mill-Feed Sampling Strategies Based on a Variographic Experiment

    By K L. Olzard

    At the WMC Resources Phosphate Hill operation, monitoring the quality of the ore delivered by the mine to the beneficiation plant is of prime importance to ensure the fertilizer is produced cost-effec

    Jan 1, 2005

  • AUSIMM
    Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc

    Aug 2, 2023

  • AUSIMM
    Supergene Iron Ore and Disorder

    By F R. M Pires, R M. Carvalho

    Supergene processes in banded iron formation (BIF) result in important dissolution, material transport and simultaneous disorder of the residual bands. The rock physical properties such as density, po

    Jan 1, 2002

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Regular Measurement Defines Upgrades on Scrubber Screens

    By R Wilson, S Luke, R Williams, B Freeburn

    "In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e

    Oct 10, 2016

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    The Integrative Technology of Slon Magnetic Separator and Centrifugal Separator for Processing Oxidised Iron Ores

    By X Dahe

    SLon vertical ring and pulsating high gradient magnetic separators possess excellent mineral processing ability and have been widely applied to process oxidised iron ores. SLon centrifugal separators

    Jul 11, 2011

  • AUSIMM
    Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metal

    By Y Zhang, Z Zhao

    The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t

    Aug 21, 2024

  • AUSIMM
    Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash Flow

    By S Shafiee, N Abbate

    The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati

    May 24, 2012

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaning

    By E Bouchard March, F Lavoie, B Legare, K Bourassa

    Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca

    Nov 8, 2021

  • AUSIMM
    Recent Process Developments at the Phu Kham Copper-Gold Concentrator, Laos

    By P Walker, I Crnkovic, D Bennett

    The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex

    Oct 29, 2012

  • AUSIMM
    Autonomous Haulage Systems – the Business Case

    By R Price

    "Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste

    Nov 15, 2016

  • AUSIMM
    Mathematical Modelling of the Convergence and Vertical Stress Patterns Around a Longwall Panel in New South Wales

    By Pattinaja MA

    Mathematical modelling was carried out to determine the probable convergence and vertical stress patterns around a retreating longwall panel in an underground coal mine in New South Wales. An &apo

    Jan 1, 1986

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    What is the Oxygen Depletion Potential of ?Water Vapour?

    By M A. Tuck

    Atmospheric air on a moisture free volume basis consists of approximately 21 per cent oxygen. The current minimum threshold for oxygen in Australia is 19.5 per cent. Atmospheric air generally will als

    Aug 31, 2015

  • AUSIMM
    The Pima II: A New Technique for Field-based Alteration Mapping

    By Cocks T

    The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the

    Jan 1, 1994

  • AUSIMM
    Mine Site Stream Diversions - A Balance of Competing Objectives

    By A Markham

    Stream diversions are a common feature of mine sites worldwide. From an operational perspective, a fundamental requirement of a stream diversion is that it should convey water flows between two points

    Jul 10, 2012