Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Lean Manufacturing in a Mining Environment

    By B Lavin, R Sanford

    This paper examines the application of Lean Manufacturing in a mining environment, based on experience within the Rio Tinto entities: Rio Tinto Aluminium, Northparkes Mines and Hunter Valley Operation

    Jan 1, 2006

  • AUSIMM
    Predicting Field Performance of Lysimeters Used to Evaluate Cover Systems for Mine Waste

    By S L. Barbour

    Measurement of the net percolation from the base of a cover system into the underlying waste material is a key component of a cover system monitoring program. The units of measure (ie a percentage of

    Jan 1, 2003

  • AUSIMM
    Determination of cyanide and potentially toxic elements in gold tailings at Barberton, Mpumalanga, South Africa

    By K E. Mudzanani, T A. M Msagati, D T. Maiga, T T. Phadi, M R. Letsoal, B M. Chabalala, S W. Limani

    This paper addresses critical environmental, health, regulatory and scientific concerns related to gold mining activities in the specific area of Barberton, Mpumalanga, South Africa. The paper thus ca

    Apr 16, 2024

  • AUSIMM
    Bio-Beneficiation of Australian Iron Ores – Potential Applications of Indigenous Bacteria for Flotation, Flocculation and Phosphorous Removal

    By R Dwyer

    Iron ore currently mined in Australia generally requires very little beneficiation. However, depleting high-grade resources means that in the future low-grade iron ore deposits will need to be mined t

    Jul 11, 2011

  • AUSIMM
    Exploration and Innovation – The Discovery and Evolution of the 2 Moz Vogue Gold Resource, Sunrise Dam Gold Mine, Western Australia

    By T Blenkinsop, A Jenkins, H Moore, L Fisher, N Oliver, J Cleverley, M Nugus, J McLellan, J Hill, N Brunacci

    The 2 Moz Vogue mineral resource is a recent discovery at the Sunrise Dam gold mine (SDGM), lying approximately 600 m vertically below the Sunrise Dam open pit. Unlike most other lodes, which are domi

    Aug 18, 2014

  • AUSIMM
    Erosion Prediction Models and Factors Affecting the Application of the Universal Soil Loss Equation to Post-Mining Landscapes in Central Queensland

    By Aspinall T. O, Bell L. C

    Increased awareness and stricter enforcement of regulatory requirements for adequate rehabilitation of surface mining sites has made environmental planning an essential part of strip mine planning.

    Jan 1, 1991

  • AUSIMM
    Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia

    Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis

    Jan 1, 1997

  • AUSIMM
    The Influence of Material Properties on the Stability of Strata Surrounding Deep Excavations

    By Cox SJD, Kramadibrata S

    One of the major causes of accidents and loss of production in underground mines is falls of ground.As mines go deeper, higher stresses are encountered and strain energy stored in the rocks is more li

    Jan 1, 1990

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    A Seismic Source Wavelet with Applications to the Modelling of Blast Vibrations

    The blasting process involves a complex interaction of a delayed sequence of moving sources of seismic energy which produce nonlinear behaviour near the blast holes. A deterministic description of t

    Jan 1, 1990

  • AUSIMM
    Investigation of Weathering Properties of Tailings Sand From Boliden's Aitik Copper Mine, Sweden ù A Summary of Twelve Years of Investigations

    By N Eriksson

    BolidenÆs Aitik mine, located 100 km north of the Arctic Circle in northern Sweden, is one of EuropeÆs largest copper mines. This operation produces 18 Mt of ore per year and 99 per cent of this tonna

    Jan 1, 2003

  • AUSIMM
    Application of Probabilistic Seismic Hazard Analyses to Areas of Low Seismicity

    Probabilistic seismic hazard analyses (PSHA) have now gained wide acceptance in the development of design criteria for major projects. When used with regional criteria the procedures have also allowed

    Jan 1, 1990

  • AUSIMM
    Hot Strip Mill at Australian Iron and Steel Limited, Port Kembla

    The completion of the Hot Strip Mill at the Port Kembla works of Australian Iron & Steel Ltd., makes possible the production of steel plates and wide strip of a quality and in quantities not possi

    Jan 1, 1956

  • AUSIMM
    The Production of Nuclear Grade Uranium Dioxide Powders from Australian Ores

    Most types of nuclear power reactors use uranium dioxide fuel. Power reactors using natural uranium dioxide'fuel are of special interest to countries such as Australia that have their own uran

    Jan 1, 1969

  • AUSIMM
    Ore Dilution Versus Mine to Mill Optimisation at KCGM

    By M Spiteri, S Woth, J Caratti, K Henley

    Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic

    Jan 1, 2001

  • AUSIMM
    The Use of Direct Push Methods for Delineating Spatial and Temporal Variability in Groundwater Investigations

    By P J. Clark, A W. Fisher, R G. Ford

    Site characterisation of subsurface contaminant transport is often hampered by a lack of knowledge of site heterogeneity and temporal variations in hydrogeochemistry. The use of a regional-scale data

    Jan 1, 2004

  • AUSIMM
    The Weipa Kaolin Project (37afd6f9-e7cd-4419-b3aa-f6892748e3dc)

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operations at Weipa. The plant will produce 100,000 tonnes p

    Jan 1, 1988

  • AUSIMM
    Rehabilitation at Strongman Mine, West Coast, New Zealand

    Coal mining ceased at Strongman Mine this year after 70 years of production. Underground mining finished in 2003 and opencast methods began in 1998. During the life of the mine, 8 million tonnes of co

    Jan 1, 2006

  • AUSIMM
    Influence of Distorted Blasthole Patterns on Fragmentation as well as Roughness of, and Blast Damage behind, Remaining Bench Face in Model-scale Blasting

    By P Moser, R Ivanova, F Ouchterlony

    This paper describes model-scale bench blasts on mortar blocks with distorted drill hole patterns, done in 2013–2014 at the Montanuniversitaet Leoben. The main aim of the project is to see if the frag

    Aug 24, 2015