Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction ActivitiesBy D Davis
The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi
Mar 8, 2011
-
Newmont Tanami Operations – Tailings Storage FacilitiesBy S Thacker, M Noakes
The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and
Jul 27, 2015
-
Operational readiness – what is it and how to get it done?By A G. L Pratt
Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f
Mar 29, 2023
-
Developments in Tube Bundle Gas MonitoringBy M Watkinson
Tube bundle monitoring systems have come a long way from their first introduction to coal mining in the late 1960s/1970s. Early developments in the United Kingdom (UK) commenced with single gas analys
Aug 31, 2015
-
Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western AustraliaBy D R. Anstey
The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from
Jul 11, 2011
-
An Inversion Method for the Prediction of Peak Particle Velocity in BlastingBy A T. Spathis, M L. Lawlor-O’Neill
A methodology for the inversion of a scaled charge weight superposition model to predict peak particle velocity (PPV) has been examined. The inversion involves two steps: first simulated annealing is
Aug 24, 2015
-
On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant PerformanceBy D Morgan, K Jones
"In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co
Oct 10, 2016
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper MinesXstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne
Jan 1, 2007
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress EnvironmentBy L Nienaber
Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper
Mar 8, 2011
-
Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head GradeBy K Jupp, T J. Howard
Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled
Jan 1, 2009
-
Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil DumpBy R Van Laeren, G Langerak, S Fityus, K Koosmen
Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal
Jul 27, 2015
-
Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, FinlandOptimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland
Sep 13, 2010
-
Application study of UAV technology in tailings pond monitoringBy T Zhao, K Wang, Z Zhang
Tailings pond safety monitoring is vital for preventing dam failures and ensuring environmental safety. Unmanned Aerial Vehicles (UAVs) can enhance tailings pond monitoring with flexible operational c
Sep 1, 2024
-
Rwanda and the Africa Mining VisionBy I H. Wilson
After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa
Jul 16, 2014
-
The æMountain Camp Reef' at Alford's Mine, Wakamarina, Marlborough: Active Role of Fault Dynamics Controlling Lode EmplacementThe æMountain Camp reefÆ at Alford's mine, Wakamarina,Marlborough, had no recorded gold production although assays of 5 - 26 g/t were reported, but it did produce c. l000 kg of scheelite. The lod
Jan 1, 1996
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry MineBy J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021
-
A New Method for Rapid Vertical Development of Underground Ventilation ShaftsBy R Markoski, P Grealish
The requirement for rapid vertical development for underground ventilation is often a factor when dealing with dynamic mine plans, with short vertical developments being used to optimise ventilation s
Sep 17, 2014
-
A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, SwedenBy R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian
Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v
Aug 24, 2022