Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The evolution of the Cadia 40-foot SAG mill to treat the Cadia East orebody: a case study of incremental change leading to operational stability

    By J Seppelt, B Akerstrom, A Rice, J Bubnich, T Waters

    The Concentrator 1 plant at Cadia transitioned from Cadia Hill open pit to the Cadia East block cave ore body in 2013. As a result of this change, major plant upgrades were required to achieve the des

    Aug 29, 2018

  • AUSIMM
    Discovery of the Solomon Iron Deposits

    By D Kepert, C Simpson, D Edwards

    Channel iron deposits (CID) currently supply over 40 per cent of the seaborne iron ore trade out of the Hamersley Province. The two well documented producing systems (Robe and Marillana palaeochannels

    Jan 1, 2009

  • AUSIMM
    WaihiÆs 2020 Vision: Part C: How Did We Get There - The Process

    By S M. Stewart

    Building and Maintaining Community Relationships   In mining terms, the town of Waihi is distinctive with the Martha mine situated right in the heart of the town. MarthaÆs central location and ot

    Jan 1, 2006

  • AUSIMM
    Sampling Practice at the Vera Nancy Gold Mine

    The efficient and profit-maximising daily and long-term management of the Vera Nancy resource depends on decisions based upon assay data. This paper examines the range of sample sources, the methods o

    Jan 1, 2000

  • AUSIMM
    Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India

    By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew

    "Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application

    Nov 5, 2014

  • AUSIMM
    Technology Based Innovation - The Next Decade

    The minerals industry focus over much of the past twenty years has been on cost reduction and production growth supported, but not driven, by technology improvements. Mergers and acquisitions, and the

    Sep 13, 2010

  • AUSIMM
    Managing the Transition from Exploration to Feasibility and Project Development

    The transition from exploration to feasibility is a stage in the development of mineral resource projects that is frequently not handled well. The transition marks a point in the project development p

    Jan 1, 2004

  • AUSIMM
    Zero Liquid Discharge in Coal Mining Operations

    By A Dal-Corobbo, R Zick

    The coal mining industry is now faced with new regulatory requirements that limit the discharge of chlorides into receiving streams. To meet these new regulatory standards for treated mine water, a ze

    Nov 26, 2013

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Modelling Mine Sustainability - Indicators Based on a Comprehensible Framework

    By A Lyon

    The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo

    Jan 1, 2009

  • AUSIMM
    Advanced mine to mill application at the Barrick Cortez mine

    By J Young, S Yu, P Moyo, M Powell, A Musunuri, B Bonfils, S Kanchibotla, P Yaroshak, V Jokovic

    The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn line

    Aug 29, 2018

  • AUSIMM
    Is there Gold that We do not Recognise?

    By J S. J van Deventer

    "Conventional wisdom is that gold not assayable is not recoverable or does not exist. There has been no formal study on the possibility that gold assays using advanced spectroscopy such as mass spectr

    Sep 26, 2013

  • AUSIMM
    Update of the geometallurgical model of a spirals circuit

    By R Belissont, C Veloso, L Senez, F Vasconcelos, E Kleiderer, J Mesquita, Y Basselin

    Mont-Wright mining complex is an important asset of ArcelorMittal located in the province of Quebec, Canada. It is composed by Mont-Wright and Fire Lake mines, operating 365 days per annum, and produc

    Sep 18, 2023

  • AUSIMM
    Ventilation Planning Considerations when Dealing with Hot Groundwater

    By S Bluhm, L van den Berg

    In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer

    Aug 31, 2015

  • AUSIMM
    Blasting Vibration Assessment and Innovative Blasting Methods in High-density Urban Environments

    By J W. Muir, N Bedford

    Hong Kong is one of the most rapidly developing cities in the world. With constant population growth and limited opportunities for space, the development of a fast and effective underground public tra

    Sep 17, 2014

  • AUSIMM
    Metallurgical Improvements at KagaraÆs Mount Garnet Mine Through the Use of High Chrome Grinding Media

    By R Whittering, C Greet

    High chrome grinding media has been used in the mining industry for quite some time, as it often proves economical on a wear basis. However, it is unusual for an operation to change to high chrome sol

    Jan 1, 2006

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Hoist Ropes for Double-Drum Winders ù A New Concept

    By R Verreet

    In April 2000 Mount Isa Mines installed hoist ropes of a new design on the double-drum winder at their P49 shaft. The ropes, CASAR Duroplast, were about three times as expensive as the previously used

    Jan 1, 2005

  • AUSIMM
    Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold Ores

    By M G. Aylmore, L W. de Klerk

    Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref

    Sep 26, 2013