Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reductant Characterisation And Selection: Implications For Ferroalloys ProcessingBy R. Khanna, M. Dubikova
A variety of carbonaceous reducing materials are being used for the production of ferroalloys. Reductant materials include not just carbons such as coke, coal, char but also bio-carbons in form of cha
Jan 1, 2004
-
Burr Project Potash Mine DevelopmentBurr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth
May 1, 2009
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
Paste Fill Design at the Louvicourt MineBy Pierre Lacombe
"The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be
Jan 1, 1995
-
Roof Stability Issues in Underground Limestone Mines in the United StatesBy Leonard J. Prosser, Dennis R. Dolinar, John L. Ellenberger, Gabriel S. Esterhuizen, Anthony T. Iannacchione
The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shall
-
Knelson-Deswik Milling Technology: Bridging the Gap between Low and High Speed Stirred MillsBy David Rahal, Des Erasmus, Ken Major
"Over the past twenty years there has been an increased emphasis on fine grinding in the minerals industry. This spurred the development of a range of new fine grinding equipment in the 1990s. At that
Jan 1, 2011
-
OFR-38(2)-74 Survey Of Electromagnetic And Seismic Noise Related To Mine Rescue Communications - Volume II - Seismic Detection And Location Of Isolated Miners ? IntroductionBy Robert L. Lagace
This final report documents the work dune by Arthur D. Little, Inc. (ADL) on behalf of the U.S. Bureau of Mines, Pittsburgh Mining and Safety Research Center (PMSRC), on Contract H0122026 (which began
Jan 1, 1974
-
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension TunnelsBy Christophe Bragard
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project
Jan 1, 2008
-
Seismic Section- Video Review - Understanding Vibrations from BlastingBy Keith Pucalik
Understanding Vibrations fr om Blasting focuses on explaining blast vibrations and their effects on people and homes while keeping an eye on the importance of the use and significance of explosives i
Jan 1, 2004
-
The Justification of Process Control Systems in Mineral and Coal Processing ApplicationsBy R. F. Hochstein, A. J. Neale, B. C. Flintoff
"Process control technology holds very significant potential benefits for many mineral and coal processing plants. The impact can be expected in terms of performance improvements (e.g. increased throu
Jan 1, 1990
-
Indicator Mineral and till Geochemical Methods for Kimberlite Exploration in Glaciated TerrainBy M. Beth McClenaghan
This paper summarizes diamond exploration techniques used in glaciated terrain, focusing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history,
May 1, 2002
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004
-
Capturing unrealized capacityBy M. W. Lewis, B. Sambirsky, J. Werner
A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh
Jan 1, 2004
-
OFR-56-74 System Study Of Coal Mine Communications - 1.0 IntroductionCollins Radio Company, through this contract with the Bureau of Mines, has conducted a System Study of Coal Mine Communi¬cations. The program was a three phase program to establish a data base, perfor
Jan 1, 1973
-
Wangaloa Coal Mine Rehabilitation - The First Six MonthsBy D Craw, C E. Martin, C Smith, C Rufaut
Wangaloa Coal Mine opened in 1945, and by the time of its closure in 1989, had produced 750 000 tonnes of coal and disturbed an area of 75 ha. The original mining licence required land rehabilitation
Jan 1, 2003
-
Continuous Bioleaching of a Polymetallic Black Shale Concentrate Using the Stirred Tank TechnologyBy P. Spolaore
In the frame of Bioshale FP6 project, the bioprocessing of a polymetallic and polymineral concentrate produced in an industrial operation in Lubin, Poland, was assessed. Following successful batch cul
Jan 1, 2014
-
Computer-Aided Design & High-Precision Systems in Drilling & BlastingBy William Wilkinson, Vladisla Kecojevic
Current three-dimensional (3D) computer design technology leveraged into drill and blast planning and operations is changing the way engineers and operations approach drill and blast design. Additiona
Jan 1, 2004
-
Saving Time and Money with Mobile Reporting and Online DatabasesBy Matt Slezak, Tristan Worsey, Nathan Rouse, Kyle Hall
As everyone knows, blasters are required to file blast reports of every blast for regulatory purposes. To this day, the authors see many handwritten blast reports. Handwritten blast reports are notori
Jan 1, 2018
-
Experimental research on the behavior of ventilation air around shafts during a fireThe safety of personnel is the most important matter during a mine fire. However, there is not enough research on a case when a fire occurs near a shaft and the behavior of the fire gas is not well un
Jan 1, 2009
-
Design of the Second Block Cave at Northparkes E26 MineThe pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur
Jan 1, 2001