Search Documents

  • NIOSH
    IC 8838 Polychlorinated Biphenyls: Regulations And Substitutes - A Compliance Manual For The U.S. Mining Industry

    By R. A. Westin

    [Polychlorinated biphenyls (PCR's) have been widely utilised as fire-resistant dielectric coolants; in electrical equipment used in mining applicants, including transformers, capacitors, electric

    Jan 1, 1980

  • IOM3
    Development of exploration and industrial technology to exploit new sources of wollastonite in Europe

    By D. Bitzios, A. Gracia, V. Meggiolaro, J. D. Baker

    Synthesis report on a project carried out under the EC-funded BRITE-EURAM programme. A large deposit in Spain and several smaller ones in Greece and Sweden were investigated. Beneficiation testwork, i

    Jun 21, 1905

  • NIOSH
    Recovery Of Tungsten From Searles Lake Brines By An Ion-Exchange Process

    By P. B. Altringer

    Searles Lake, CA, contains the largest known domestic tungsten resource. The brines in this near-dry lake bed, located in the Mojave Desert 130 mi northeast of Los Angeles, contain an estimated 135 MM

    Jan 1, 1985

  • NIOSH
    IC 8228 Examining And Testing Clay From Hartford County, Conn., For Lightweight Aggregate Use - The Clark Brick Co. Deposit At South Windsor

    By W. T. Millar

    Field reconnaissance and laboratory tests on clay from South Windsor, Hartford County, Conn., indicate that the clay is suitable for lightweight aggregate raw material. Exploration of the deposit s

    Jan 1, 1964

  • CIM
    Influence of Highly Permeable Geologic Structure on Inflows to A154 N/S Open Pit Diavik Diamond Mines Inc., Lac de Gras, NWT

    By Jeff R. Reinson

    The Diavik Diamond Mine is producing diamonds from two orebodies, the A154 South and A154 North kimberlite pipes, discovered beneath the waters of Lac de Gras. Innovative dike technology with appropri

    May 1, 2006

  • SME
    Influence of material composition on post‑failure behavior of overburden dumps in opencast coal mines - Mining, Metallurgy & Exploration (2023)

    By Anup Tiwari, Khanindra Pathak, BIBHUTI BHUSAN MANDAL

    Failure of in-pit overburden dumps in open-pit coal mines causes debris to flow toward the active working face, threatening the safety of people and equipment. The evaluation of the potential mobility

    May 29, 2023

  • AUSIMM
    The Kulumadau Epithermal Breccia-hosted Gold Deposit, Woodlark Island, Papua New Guinea

    By L Spencer, H Zwingmann, I Graham, D Cendon, B Kelly, D Burkett, F Lau, P Lennox

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kulumadau deposit represents an intermediate-sulfidation epithermal gold deposit (3.8 M

    Mar 18, 2015

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • AIME
  • ISEE
    Interpreting Continuous Velocity of Detonation Measurements

    By Bruce Vandenberg

    Two tests were set up as part of the course given by Blasting Analysis International. Both tests were performed using the prototype Velocity of Detonation Recorder (VODR). The prototype has several li

    Jan 1, 1990

  • CIM
    Advancements in Coarse and Fine Particle Flotation

    By M. Fan, M. Mankosa, G. Luttrell

    "Column and other non-conventional flotation approaches continue to provide benefits where conventional flotation processes have exhibited limited success. This is particularly evident with respect to

    Jan 1, 2010

  • AUSIMM
    The Post-Mining Water Balance

    By A Watson

    We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from on

    Jan 1, 2009

  • SME
    Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section

    By D. J. Gilbert

    As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co

    Jan 1, 2011

  • NIOSH
    OFR-3(5)-75 Design And Development Of Protective Canopies For Underground Low Coal Electric Face Equipment, Including Shuttle Cars - Installation And Maintenance Manual: Protective Canopy For Galis Mfg. Co. Face Drill ? 1. Introduction

    This manual provides instructions for installing, operating, and maintaining a protective canopy on the Galis Mfg. Co. face drill. The instructions are based upon an actual installation made in the mi

    Jan 1, 1973

  • DFI
    Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History

    By Aly M. Mohammad

    State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,

    Jan 1, 2006

  • IOM3
    Flotation of pyrite and arsenopyrite at alkaline pH

    By R. J. Gochin, M. A. Diaz

    A modified Hallimond tube is described which allows the determination of the ultimate recovery R and the flotation rate constant k in a single, continuous experiment. The range of fine particles which

    Apr 1, 1995

  • AUSIMM
    Property Rights and Mineral Law Reform

    In understanding the consequence of existing law, and the likely implications of its reform, it is necessary to comprehend the logic of the situation that the law provides individual decision makers a

    Jan 1, 1988

  • SME
    Compression Testing Of Green And Dry Iron Ore Pellets ? Introduction

    By David S. Cahn

    For many years the green and dry compressive strengths' of pellets have been, considered as possible criteria of pellet performance during induration. Although widely quoted throughout the indust

    Jan 1, 1967

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • NIOSH
    Water Resistant Enclosure For Extensometer - Objective

    Provide long-term measurement of mine sidewall closure in backfilled stapes subject to flooding. Approach A water resistant extensometer is made by enclosing a rod-actuated transducer in a tel

    Jan 1, 1978