Search Documents

  • NIOSH
    Subsidence Prediction Using a Laminated, Boundary-Element Program

    By Keith A. Heasley, Timotlly M. Barton

    Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub

  • CIM
    Thompson 1-D Deposit Geology and Structure

    By Rob Stewart

    Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G

    May 1, 2006

  • CIM
    Innovations in Reagent Technology: New Collectors and Modifiers for Difficult to Treat Ores

    By T. Bhambhani, D. R. Nagaraj

    "Ultramafic Ni ores present significant challenges in processing in that both recoveries and grades are not satisfactory, due to the presence of Mg silicates in large amounts. Significant quantities o

    Jan 1, 2012

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration Standards

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and

    Jan 1, 2014

  • IOM3
    Components of a recovery factor in gold and tin dredging

    By R. H. T. Garnett

    N.B. This paper provoked much (positive!) discussion in later issues, with responses from the author (and thanks also for the many private contributions he had received) - see under Garnett R.H.T. Exp

    Sep 1, 1991

  • NIOSH
    Bulletin 7 Essential Factors In The Formation Of Producer Gas

    By L. H. ADAMS, C. N. HASKINS, J. K. CLEMENT

    In the course of its investigations of the fuel resources in the United States and of the methods by which these resources could be utilized with greatest efficiency, the United States Geological Surv

    Jan 1, 1911

  • AUSIMM
    Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real Options

    By H M. Ahmed, W S. Dunbar

    Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of

    May 9, 2016

  • AUSIMM
    Disparate Tectonic Settings for Mineralisation in an Active Arc, Eastern Papua New Guinea and the Solomon Islands

    By C Spandler, S W. Richards G Rosenbaum, R J. Holm

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The recent and active magmatic arcs of eastern Papua New Guinea (PNG) and the Solomon Island

    Mar 18, 2015

  • AUSIMM
    Application of Lithostratigraphic and Chronostratigraphic Analysis to Seam Modelling in the Rapahoe Sector, western Greymouth Coalfield

    Seam correlation in the central Rapahoe Sector (Greymouth Coalfield) can be enhanced by detailed lithostratigraphy and chronostratigraphy. Rewanui Coal Measures are overlain comformably by lacustrine,

    Jan 1, 1996

  • SME
    MINExpo International 2004 Expects 40,000 Attendees

    The latest in mining technology and equipment will be show-cased this month at MINExpo International 2004. The event, billed as the world’s largest mining equipment exhibition, is set for Sept. 27-30

    Jan 1, 2004

  • CIM
    Engineers Canada Partnerships

    By Stephanie Price

    Engineering Associations ?Regulatory authority ?License individuals and firms ?Discipline licensed members ?Enforce against improper acts ?Programs for EIT?s, competence, etc

    Oct 1, 2010

  • NIOSH
    RI 7550 Noise In Underground Coal Mines

    By J. A. Lamonica

    The Bureau of Mines conducted an environmental noise survey to determine the noise levels to which underground coal mine employees are exposed, to evaluate noise survey techniques and equipment, and t

    Jan 1, 1971

  • RMCMI
    Air Quality Development Affecting Western Coal Fired Power Plants

    ? Develop a six year capital budget for future emission controls at Western Springfield Power Plant that would provide long-term operating certainty

    Jan 1, 2005

  • SAIMM
    As Cast And Heat-Treated Alloys Of The Pt-Al-V System At The Pt-Rich Corner ? Synopsis

    By B. O. Odera

    The Pt-based alloys have a high potential for replacing some Ni-based superalloys (NBSAs) used in the highest temperature and most aggressive environments, and vanadium would be a beneficial alloying

    Jan 1, 2012

  • SAIMM
    Measurements and analyses of blasting vibrations

    By J. Werfling, J. R. Kiehl

    SUMMARY: The effects of blasting on structures are assessed on the basis of the maximum amplitudes of the occuring vibration velocities. If the standard values in the German Standard DIN 4150 are not

    Jan 1, 2003

  • SAIMM
    Cyanidation Of Reef And Surface Gold Ores ? Synopsis

    By L. Rademan

    The kinetic leaching behaviour of a low-grade surface gold ore and a high-grade reef ore were evaluated to determine the achievable gold recovery from these ores and particularly mixtures of these ore

    Jan 1, 2012

  • NIOSH
    RI 6217 Examination Of An Experimental Iron Blast Furnace After Quenching With Nitrogen

    By J. P. Morris

    An experimental blast furnace in normal operation was quenched by substituting cold nitrogen for the hot blast air. More than 2,200 samples from the stack, bosh, and hearth were taken; 500 of these we

    Jan 1, 1963

  • NIOSH
    IC 8938 New Developments In Personal Lighting Systems For Miners

    By William H. Lewis

    Energy Research Corp., under contract to the Bureau of Mines, has developed a new miners' caplamp battery. The new battery is based on nickel-cadmium technology and offers significant improvement

    Jan 1, 1983

  • AUSIMM
    Beyond Rock Mass Characterisation – the Impact of Geology on Block Cave Mining

    By A Webster, T Murphy

    Block cave mining, in its broadest sense, has transitioned from an orebody/rock mass determined method of extraction, to a low-cost and high production mining method that may be applied to any large o

    May 9, 2016

  • AUSIMM
    The Waihi Epithermal Gold-Silver-Quartz Vein System, New Zealand: A High-Throughput Geothermal System of Late Miocene Age

    By P Blattner

    The Late Miocene gold-silver bearing epithermal system at Waihi has some close similarities in its paleo-thermal and geochemical structure with modern, volcanic-hosted geothermal systems such as Ohaak

    Jan 1, 1995