Search Documents

  • CIM
    The coarse particle recovery process

    By G. S. Hill, B. J. Huls

    This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate ana

    Jan 1, 2006

  • AUSIMM
    Measurement of Phase Transformation Rates During the Reduction of Iron Oxides Using High-Temperature X-Ray Diffraction

    By Madsen I. C, Langberg D. E

    Recent advances in X-ray diffraction (XRD) technology have made it possible to conduct powder XRD measurements on samples at high temperatures during reaction. State-of-the-art detectors are now cap

    Jan 1, 1999

  • DFI
    Driven Piles

    By S. Merjan

    Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf

    Jan 1, 1991

  • AUSIMM
    Geochemical Ore Guides and Techniques in Exploration for Tin (f197bab6-bf99-45ab-8d21-404dd026e852)

    Geochemical data on Australian granites and pegmatites, and the mineral components of these rocks, are compared with that obtained in similar studies in the U.S.S.R. and elsewhere.The geochemical char

    Jan 1, 1963

  • NIOSH
    RI 3218 Volatilization of Impurities from Zinc Concentrates

    By G. L. Oldwright, F. K. Shelton, W. E. Keck

    "INTRODUCTION Zinc must be of high grade to satisfy the present demand. Even when the amount of premium paid is small, the purer metal as the buyers' preference. The following specifications for spelt

    Jun 1, 1933

  • AUSIMM
    Comparative evaluation of manual sampling and Outotec MSA 2/50 metallurgical slurry sampler

    By J Loimi, P Minkkinen, T Korpela

    The head loss caused by metallurgical sampling for slurry streams can be reduced by metallurgical sampler design. When the process volumetric flow rate is reduced by vertical static cutters before the

    May 9, 2017

  • AUSIMM
    The Water Flume Conveyors of the Mount Lyell Mining and Railway Company Limited

    THE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June) 1896, been derived continuously from the extensi

    Jan 1, 1910

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • SME
    National Mining Hall Of Fame To Honor Four (c2bf092c-db9b-40a9-aef1-4f24d0616a10)

    Ceremonies for the induction of four mining industry pioneers into the National Mining Hall of Fame will be held Saturday, Sept. 13, 2008 at the Charles F. Barber Pavilion of the Museum Convention Cen

    Jan 1, 2008

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada (7fbdd5b5-ed88-46a3-b280-65b8ab04c5b6)

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "Abstract — The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed an

    Jan 1, 2012

  • AUSIMM
    Mount Angelo Copper Prospect, East Kimberleys, W.A.

    The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t

    Jan 1, 1966

  • SME
    Steel Linings In Vertical Openings

    By James W. Harrower, Gerald S. Ball

    This paper discusses the installation of steel linings in vertical, raisebored openings. Design criteria used to evaluate the applicability of liner type and design are presented as well as a brief de

    Jan 1, 1985

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • SME
    Knelson-Deswik Mill: Evaluation Of Operating Variables ? Introduction

    By D. Rahal

    All ores have an economic optimum particle size (Wills and Napier-Munn, 2006). This optimum value is often a compromise between the need to achieve adequate liberation for the efficient separation and

    Jan 1, 2011

  • SAIMM
    Assessment Of The Precision And Bias Of An Online Gauge Using A Single Reference Instrument ? Synopsis

    By F. Lombard

    We consider the Grubbs estimation of the precision of an online gauge. Typically, this type of estimation involves independent results from two or more reference instruments (sampling and laboratory a

    Jan 1, 2012

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • DFI
    Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical Approach

    By Özgür Bezgin

    This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t

    Jan 1, 2009

  • AIME
    Mining - Experimental Impact Craters in Basalt

    By J. Moore, D. Gault, R. V. Lugn

    Impact of small projectiles with velocities between 0.9 and 7.3 km per sec on basalt produce craters chiefly by the ejection of fragments. Weight-size distributions of the ejecta are linear for part o

    Jan 1, 1963

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006