Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Horizontal Stress: The Root Of All Evil?

    By J. Nielen van der Merwe

    The effects of horizontal stress in coal mine roofs in South Africa did not receive the attention it deserved for several years, but now there is a danger that it may be over emphasized. A number of p

    Jan 1, 2000

  • SME-ICGCM
    In Situ Strength Testing of Rocks with the Borehole Penetrometer

    By Kot F. von Unrug

    One of the major difficulties in the proper characterization of rocks surrounding excavations is the lack of data. The existing method for strength determination requires core drilling for sample coll

    Jan 1, 1998

  • SME-ICGCM
    Measurement Of Structural Deformation And Tilt During Subsidence

    By Revendra Awasthi

    The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi

    Jan 1, 1990

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Prediction And Control Of Surface Subsidence Over Abandoned Mined Lands In Carbonia (Italy)

    By Pier Paolo Manca

    The investigated area lies close to a large town and covers an area of about lkm2. The mine was worked at depths ranging from 5 to 100 meters but mining operations actually ceased some 50 years ago. T

    Jan 1, 1999

  • SME-ICGCM
    Enhancing Mine Subsidence Prediction and Control Methodologies

    By Michael Karmis

    During the last 25 years, technological advancement and subsidence research have resulted in more accurate and diverse prediction capabilities. The work presented in this paper focuses on the developm

    Jan 1, 2008

  • SME-ICGCM
    Determination Of Rock Strength Properties Using Geophysical And Ultrasonic Logging In Exploration Drill Holes

    By John Feddock

    This study deals with underground mines and ground control and the prediction of seats strength characteristics based upon ultrasonic logging. Exploration drill holes, both rotary and core holes are u

    Jan 1, 2003

  • SME-ICGCM
    Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face

    By S. Y. Liu

    Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t

    Jan 1, 1990

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • SME-ICGCM
    Pressure Distribution Of 2-Leg Shield Supports (fb20894a-e0d3-49e8-b331-69176f4a54a3)

    By Rao Pothini

    Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each under

    Jan 1, 1992

  • SME-ICGCM
    FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field Trial

    By H. Yavuz

    A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T

    Jan 1, 2001

  • SME-ICGCM
    Expanded Cement: New Solutions for Age-Old Problems

    By John K. Wood

    The development of an expanded cement product represents a major advance in the technology of roof control systems. Such a product is gaining recognition as a valuable tool in today's cost- consc

    Jan 1, 1986

  • SME-ICGCM
    Computerised Subsidence And Displacement Prediction Using Influence Function Methods

    A computerised influence function approach to subsidence and horizontal displacement prediction is described, with particular emphasis being placed on the applicability of the method to irregular- sha

    Jan 1, 1988

  • SME-ICGCM
    Performance of Various Standing and Cribless Tailgate Support Configurations in a Large Eastern Coal Mine

    By Gregory M. Molinda

    Difficult mining conditions in deep western U.S. Iongwalls have necessitated the use of novel tailgate support systems. Extreme ground movement in these yielding gate systems has caused operators to u

    Jan 1, 1997

  • SME-ICGCM
    Evaluating Roof Control In Underground Coal Mines With The Coal Mine Roof Rating

    The U.S. Bureau of Mines (USBM) has developed the coal Mine Roof Rating (CMRR) to aid in ground control. This paper describes the application of the CMRR at four coal mines operated by a major U.S. co

    Jan 1, 1994

  • SME-ICGCM
    The Influence Of Geomining Parameters Over Stress Distribution In And Around Depillaring Faces

    By Rajendra Singh

    In India, pillar mining is contributing more than 90% of underground production which involves extraction of a part of coal from bords with pillars around as natural support in the development stage.

    Jan 1, 1990

  • SME-ICGCM
    A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield

    By David Newman

    The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera

    Jan 1, 2002

  • SME-ICGCM
    Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of Weakness

    By Daniel W. H. Su

    Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr

    Jan 1, 1990

  • SME-ICGCM
    Pillar Design and Roof Support for Controlling Longwall Headgate Subject to High Horizontal Stresses

    By D. W. H. Su

    A two-year study was conducted by CONSOL in a northern West Virginia coal mine to evaluate pillar design and support requirements to improve roof control in right-hand longwall headgates subject to hi

    Jan 1, 2003