Factors Bearing On The Interpretation Of In Situ Testing ResultsBy D. J. Dodds, W. L. Schroeder
INTRODUCTION The plate loading test is a simple, useful tool in rock mechanics. The test consists of applying load to a rock surface and noting the resulting deflections. Plate loading tests are ty
Jan 1, 1974
-
Breaking The Glass Ceiling In Advance Rates Via Technology And PeopleBy B. C. Lewis
Have technological advancements in underground coal mining driven people's skills to new highs or have the expanded skills of mining people driven the industry's technological advancements.
Jan 1, 1999
-
Ground Control Design For Highwall Mining (237c3f7a-5149-4dad-a860-b8b9ad20fedb)By R. Karl Zipf
Highwall mining is an important surface coal mining method, and it may account for approximately 4% of total U.S. coal production. Highwall stability is the major ground control related safety concer
Jan 1, 2005
-
Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation MethodA practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor
Jan 7, 2020
-
A 4.75m Contractor Manufactured EPB MachineBy Bruce Richardson
A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec
Jan 1, 2008
-
Rock Mass Characterization for the WSSC Bi-County Water TunnelBy Paul Headland
The Washington Suburban Sanitary Commission (WSSC) has recently completed design for the Bi-County Water Tunnel Project. The project will include a 10-foot diameter, 5.3-mile long hard rock tunnel loc
Jan 1, 2008
-
Performance And Experiential Development Of The Mobile Miner At Mount IsaBy R. J. Boyd
SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc
Jan 1, 1987
-
Flambeau And Ridgeway Mines – Lessons LearnedBy F. D. Fox
The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa
Jan 1, 2003
-
Precious Metal Heap Leaching In A High Rainfall Alpine Setting At The Barrick Gold Pierina Mine In PeruBy G. Bee, Z. Gavelan, R. Espinel, Y. Roditis, X. Ochoa
In August 1996 Barrick Gold Corporation acquired the Pierina property, an advanced stage exploration project, high in the Andean Cordillera of Peru and in November 1998, in a record time of just over
Jan 1, 2002
-
Studies On Mechanical Properties And Influence Of Structural Defects Of Cu-Mo Composite Materials Obtained By The PVD MethodBy V. G. Grechanyuk
The paper presents the mechanical properties of Cu-Mo composite materials depending on the molybdenum content. The influence of structural defects on the mechanical-physical properties of the condensa
Jan 1, 2008
-
Ocean Bottom Tap Point Lepreau Cooling Water Tunnels New BrunswickBy Fred Breu, Ronald E. Heuer
INTRODUCTION The Point Lepreau nuclear generating station was constructed in the late 1970's and early 1980's by the New Brunswick Electric Power Commission. Point Lepreau is a small peni
Jan 1, 1985
-
Homestake’s McLaughlin mine : One of the largest US gold mines comes onstream in 1985Introduction The Homestake Mining Co. has always been big on gold. After 108 years in the business, the company and its principal product are almost synonymous. The relationship continues. On Sept.
Jan 1, 1986
-
Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage PreventionBy Fritz Grübl
Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.
Jan 1, 2001
-
The Mine Safety And Health Act: Legislative, Policy, And Enforcement Initiatives Following The Upper Big Branch Explosion ? IntroductionBy L. E. Beverage
In 2006, the Mine Improvement and New Emergency Response Act (?2006 MINER Act?), Pub. L. No. 109-236, 120 Stat. 493 (2006) was enacted in a bi-partisan move to strengthen the 1977 Mine Safety and Heal
Jan 1, 2011
-
Elm Road Generating Station Water Intake TunnelBy Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
Mining And Marketing Altered Volcanic Tuff At The Heart Of Nature?s Alum/Sulfur MineBy John Heter
An alum/sulfur deposit (USDA organic registered) was mined underground for alunite (K,Na) Al3 (SO4)2 (OH)6 from the early 1900s to the 1930s. It is now being mined as an open pit quarry. A larger as
Jan 1, 2008
-
Preventive Maintenance Policy Supported By A Quality Control Chart And Kolmogorov-Smirnov Tests: Emet Colemanite Mineral Processing Plant, TurkeyBy S. Yerel
In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous ProcessBy J. O. Marsden
Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f
Jan 1, 2007
-
Carburization Effects On Pig Iron Nugget MakingBy B. Anameric, S. K. Kawatra, K. B. Rundman
The iron nugget process is an economical, environmentally friendly, cokeless, single-step pig iron making process. Residence time dependent process requirements for production of pig iron nuggets at a
Jan 1, 2005