Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sulfate Reduction - Designing Systems For Long Term Treatment (238ad8d9-2dab-4d3c-a3f1-88274f1b5135)By J. Wagner, P. Eger
Although lifetime estimates for sulfate reduction based on total substrate carbon typically range from 20 to 30 years, field and laboratory experiments showed that rates of sulfate reduction decreased
Jan 1, 2001
-
Technology and Productivity Changes in US Coal Mining: a 45-year ReviewBy Joel Darmstadter
The position of the coal industry in America’s fuel and power picture remains one of prime importance. Measured in Btu terms, the industry is the country’s leading energy producer and an important ex
Jan 1, 1999
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009
-
Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)By Jürg Schlumpf
Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off
Jan 1, 2008
-
Innovative Roof Support Systems For The Next Generation Of MiningBy S. C. Tadolini
Roof support systems have evolved from standing posts and timbers to a generation termed ?big nails? where steel bars are inserted into boreholes and anchored with expansion shells and/or resin cartri
Jan 1, 2012
-
Development And Comparison Of Subsidence Prediction Methods For The Eastern U.S. CoalfieldsBy P. Schilizzi, A. Jarosz, M. Karmis
This paper is concerned with subsidence prediction methods and in particular with two techniques, one based on profile functions and the other on influence functions. Profile function methods provide
Jan 1, 1986
-
Creation Of An Underground Mine Development Sequencing OptimizerBy M. J. Blattman
Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret
Jan 1, 2003
-
Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite OresBy J. M. Ekenes
New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser
Jan 1, 2012
-
The Development Of Ultra Fine Grinding At KCGMIn February 2001, Kalgoorlie Consolidated Gold Mines (KCGM) commissioned its first full-scale ultra fine grinding (UFG) plant to supplement existing roaster concentrate treatment capacity. This proces
Jan 1, 2002
-
Evaluating Underground Mining Hazards By Fuzzy FMEABy S. K. Oraee
Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he
Jan 1, 2011
-
Shutdown and restart at Pinto Valley - a maintenance viewpointBy Robert S. Shank
Introduction The Pinto Valley open-pit copper mine is located in southern Arizona, 11 km (7 miles) west of Miami. Production at Pinto Valley began in 1974. About 350 Mt (386 million st) of ore and wa
Jan 4, 1985
-
Health Of The Underground Construction Industry Evident At RETCIn spite of a global economy that continues to seesaw and a U.S. Congress that is at odds with the president and themselves, cities around the world are still spending billions on their infrastructure
Jan 1, 2011
-
Long-Term Stability Of Overburden Above Room And Pillar MinesBy Gennaro Gerald Marino
Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for
Jan 1, 1986
-
Successful Tunneling for Water Tunnel No. 3, New York City, New YorkBy Thomas P. Kwiatkowski, Joginder S. Bhore, Christopher D. Orlandi, Jose Velez
Three case histories of successful TBM tunneling for New York City Water Tunnel No. 3 are presented. The tunnels, costing about one billion dollars total, are the 5-milelong, 18'-11" OD Brooklyn
Jan 1, 2007
-
Accelerated Weathering Of Limestone For CO2 Mitigation: Opportunities For The Stone And Cement IndustriesBy William H. Langer
Large amounts of limestone fines co-produced during the processing of crushed lime-stone may be useful in the sequestration of carbon dioxide (CO2). Accelerated weathering of limestone (AWL) is propos
Jan 1, 2009
-
Dominican Republic and Haiti continue to explore their alluvial gold depositsBy Gerald M. Ellis
ntroduction As the gold mining industry continues to develop in the Dominican Republic and Haiti, more deposits will undoubtedly be discovered that will be amenable to development. The Pueblo Viej
Jan 8, 1986
-
Effect Of Flotation Frothers On Bubble Size And Foam StabilityBy Bradshaw, Y. S. Cho
The size of bubbles plays an important role in flotation. Equations used to calculate the size of bubbles all show the effect of liquid/gas surface tension. However, the surface tension does not cha
Jan 1, 2001
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Exploratory Shaft Design For The Salt Repository ProjectBy S. A. G. Poppen, M. B. Mirza, A. I. Cooley
The U.S. Department of Energy (DOE) is responsible for siting and constructing a licensed geologic repository for commercially generated high-level nuclear waste. Within DOE, the Office of Civilian Ra
Jan 1, 1987
-
Geotechnical Considerations No. 7 Subway Line Extension Project in New York CityBy P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts
As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro
Jan 1, 2005