Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024By Jeff Reid, Mohamed Maghari, Nicholas Joens
The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un
Jun 23, 2024
-
Room And Pillar In-Seam Excavator And Roof Supporter (RAPIERS)By Summers D. A.
A mining machine has been designed and fabricated to mine coal from room and pillar operations combining high pressure waterjet cutting and mechanical fragmentation. Waterjets are used to slot the coa
Jan 1, 1992
-
Silica Control At Reserve Mining CompanyBy W. J. Nosek
Reserve Mining Company completed construction on a major process modification project in June of 1980. These modifications enabled Reserve to reduce and control its final iron ore pellet silica conten
Jan 1, 1983
-
Attracting Engineering Students To The Mining IndustryBy Willard C. Lacy
INTRODUCTION A program to insure adequate talent for development and management of our mineral resources entails two equally important and interrelated aspects: 1) attracting and retaining promising
Jan 1, 1971
-
Analysis Of Reported Ventilation Costs For Uranium Mine Radon Daughter ControlBy Robert C. Bates
Published information discussing uranium mine radon daughter controls and related costs was examined and used to develop an estimated (projected) cost per ton for any level of control. Results show a
Jan 1, 1983
-
Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline StudiesBy C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani
The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th
Jan 1, 2001
-
Decision Tools For Integrating Sustainability Into Planning And Feasibility Phases Of Projects For Extractive Sector Enterprises ? IntroductionBy A. Ramage
Since late 2010, CH2M HILL has been working with a confidential client who holds a long-term commitment to sustainable development (SD). The commitment is aligned with all three elements of the triple
Jan 1, 2012
-
Operation Yellowboy-Design And Economics Of A Lime Neutralization Mine Drainage Treatment Plant ? IntroductionBy H. B. Charmbury
The acid mine drainage problem in Pennsylvania is of continuing and growing interest to the coal mining industry, the state government and the citizenry at large. Approximately one-third of the total
Jan 1, 1967
-
Geology Of The Iron Deposits Of Western AustraliaBy Burton H. Boyum
The paper generally reviews the iron ore occurrences and regional geology of Western Australia, but features in particular the mesa deposits of PJasic Materials - Cliffs International. Initial product
Jan 1, 1964
-
2022 MPD Student Poster Contest – Winning AbstractsBy Qingqing Huang, Mohammad Rezaee
The Mineral & Metallurgical Processing Division (MPD) of the Society for Mining, Metallurgy & Exploration held the 12th MPD Student Poster Contest on March 2, 2022, during the MINEXCHANGE 2022 SME Ann
Nov 22, 2022
-
Failure Characteristic Analysis and Warning Method of Sandstone Based on Catastrophe Theory - Mining, Metallurgy & Exploration (2023)By Ping Li, Baokun Zhou, Lei Yang, Changfeng Li, Erhui Zhang
A uniaxial compression experiment was conducted on standard sandstone specimens to explore the sandstone’s mutation characteristics and early warning interval during deformation and failure. Meanwhile
Aug 23, 2023
-
Justifying API Bentonite Rheological Behavior Through Its Forming Size Fractions Mining, Metallurgy and ExplorationBy A. A. El-Midany, R. M. Farag, A. M. Salem, S. E. El-Mofty
Bentonite represents one of the main players in the stability of the drilling mud. Its particle size and particle size distribution affect the physical properties of the drilling mud especially the rh
-
The Clinkering Process In Portland Cement Manufacturing ? SynopsisBy J. Richard Tonry
In portland cement manufacturing, the raw materials axe changed to clinker in the burning operation. Generally the rotary kiln is used for this purpose and involves many processes, including pelletizi
Jan 1, 1963
-
Grouting Aggressive Ground in Qatar - NAT2024By Hernan Fernandez, Khalid Saif F S Al- Khayareen, Volkan Salepciler, Jacek B. Stypulkowski
Wakrah and Wukair Drainage Tunnel, WWDT is 13 km long with a 4.5 m ID sewer water tunnel about 50 to 60 m below ground surface. Integral to the project are several adits with provisions for future con
Jun 23, 2024
-
Introducing a new mine ventilation design method by integrating discreteevent mining process simulation and ventilation simulation - SME Transactions 2018By K. C. Kocsis
Underground ventilation systems, which require electricity to operate the fans and fossil fuel for heating in winter, can account for a significant portion of the energy consumption of mines. Recent s
Jan 1, 2018
-
Evaluation of Different Shielding Materials for Reducing Electromagnetic Interference of the Personal Dust Monitor 3700By J. Noll, C. DeGennaro, C. Zhou, J. Srednicki
"The personal dust monitor (PDM) (model PDM3700), as well as other electronic devices, can cause electromagnetic interference (EMI) which can disrupt the operation of some proximity detection systems
Jan 1, 2018
-
Single Fracture Of Brittle SpheresBy N. Arbiter
Fracture under low velocity free-fall and double impact, and under slow compression have been-investigated. The pattern of breakage and the size distribution of resulting fragments for sand-cement and
Jan 1, 1968
-
Performance of the Support System Following Multiple 3.0+ Mn Seismic Events at Vale’s Creighton Mine – A Case Study - RASIM2022By Stephanie Singarayer, Damodara Reddy Chinnasane, Mike Yao, Danielle Pelletier
Mining at Vale’s Creighton Mine has been active for nearly 120 years in Sudbury, Ontario, Canada. Being the deepest mine in the Sudbury region, mining induced seismicity is a common occurrence at Crei
Apr 26, 2022
-
New Books (94ca3dbe-8124-4752-9b68-d7b4e04dd7a6)Despite limited discussion, Chemistry of Flotation is a good text and reference 1985 by M. C. Fuerstenau, J. D. Miller, and M. C. Kuhn Society of Mining Engineers Caller No. D Littleton, CO 80
Jan 7, 1986
-
Role and Performance of Chemical Grout in the Underpinning of an Active Subway StationBy Daniel J. Dobbels, Eric R. Drooff, James R. Wheeler
Construction of Boston’s C11A1 Section of the Central Artery (I-93)/Tunnel(I-90) Project beneath the existing MBTA Red Line Subway at South Station required excavation to depths in excess of 33.5 m (1
Jan 1, 1999