Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Passive Integrating Measurements Of Radon And Thoron: Methods And Field Observations

    By S. Murdock, R. L. Fleischer, H. W. Alter, J. E. Gingrich

    The use of solid state track deters allows totally passive, integrating measurements of 222Rn (radon) or of 220Rn (thoron) plus radon. A track-detecting solid is placed in a holder that is closed by a

    Jan 1, 1981

  • SME
    Room And Pillar In-Seam Excavator And Roof Supporter (RAPIERS)

    By Summers D. A.

    A mining machine has been designed and fabricated to mine coal from room and pillar operations combining high pressure waterjet cutting and mechanical fragmentation. Waterjets are used to slot the coa

    Jan 1, 1992

  • SME
    Performance of the Support System Following Multiple 3.0+ Mn Seismic Events at Vale’s Creighton Mine – A Case Study - RASIM2022

    By Stephanie Singarayer, Damodara Reddy Chinnasane, Mike Yao, Danielle Pelletier

    Mining at Vale’s Creighton Mine has been active for nearly 120 years in Sudbury, Ontario, Canada. Being the deepest mine in the Sudbury region, mining induced seismicity is a common occurrence at Crei

    Apr 26, 2022

  • SME
    A Numerical Modeling Approach for Assessment of Seepage Characteristics and Performance of Protective Water Barrier Pillars in Underground Coal Mines

    By S. K. Sharma, ANKUSH GALAV, G. S. P. Singh

    Providing a suitable protective water barrier pillar (PWBP) is common to reduce inundation hazards in underground coal mines. The imperative factors influencing its performance include the water head

    Aug 18, 2022

  • SME
    Attracting Engineering Students To The Mining Industry

    By Willard C. Lacy

    INTRODUCTION A program to insure adequate talent for development and management of our mineral resources entails two equally important and interrelated aspects: 1) attracting and retaining promising

    Jan 1, 1971

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • SME
    Decision Tools For Integrating Sustainability Into Planning And Feasibility Phases Of Projects For Extractive Sector Enterprises ? Introduction

    By A. Ramage

    Since late 2010, CH2M HILL has been working with a confidential client who holds a long-term commitment to sustainable development (SD). The commitment is aligned with all three elements of the triple

    Jan 1, 2012

  • SME
    Geology Of The Iron Deposits Of Western Australia

    By Burton H. Boyum

    The paper generally reviews the iron ore occurrences and regional geology of Western Australia, but features in particular the mesa deposits of PJasic Materials - Cliffs International. Initial product

    Jan 1, 1964

  • SME
    Justifying API Bentonite Rheological Behavior Through Its Forming Size Fractions Mining, Metallurgy and Exploration

    By A. A. El-Midany, R. M. Farag, A. M. Salem, S. E. El-Mofty

    Bentonite represents one of the main players in the stability of the drilling mud. Its particle size and particle size distribution affect the physical properties of the drilling mud especially the rh

  • SME
    Operation Yellowboy-Design And Economics Of A Lime Neutralization Mine Drainage Treatment Plant ? Introduction

    By H. B. Charmbury

    The acid mine drainage problem in Pennsylvania is of continuing and growing interest to the coal mining industry, the state government and the citizenry at large. Approximately one-third of the total

    Jan 1, 1967

  • SME
    The Clinkering Process In Portland Cement Manufacturing ? Synopsis

    By J. Richard Tonry

    In portland cement manufacturing, the raw materials axe changed to clinker in the burning operation. Generally the rotary kiln is used for this purpose and involves many processes, including pelletizi

    Jan 1, 1963

  • SME
    The preparation of high purity MgO and precision separation mechanism of Mg and Ca from dolomite "Metallurgy & Exploration"

    By Sihua Lei, Hong Zhong, Shuai Wang, Yu Gan, Zhanfang Cao

    High purity MgO is widely used in various fields as an important magnesiumcompound. The separation of Mg and Ca is of great importance for the preparation of high purity MgO from dolomite. In this stu

    Apr 21, 2020

  • SME
    Introducing a new mine ventilation design method by integrating discreteevent mining process simulation and ventilation simulation - SME Transactions 2018

    By K. C. Kocsis

    Underground ventilation systems, which require electricity to operate the fans and fossil fuel for heating in winter, can account for a significant portion of the energy consumption of mines. Recent s

    Jan 1, 2018

  • SME
    New Books (94ca3dbe-8124-4752-9b68-d7b4e04dd7a6)

    Despite limited discussion, Chemistry of Flotation is a good text and reference 1985 by M. C. Fuerstenau, J. D. Miller, and M. C. Kuhn Society of Mining Engineers Caller No. D Littleton, CO 80

    Jan 7, 1986

  • SME
    Apparent Viscosity Evolution of Copper Converter Slag During a Reduction Process

    By Zhonglin Ye, Guangping Dai, Ba Zhang, Yonggang Wei, Shiwei Zhou, Bo Li, Hua Wang

    Decreasing copper content in slag is critical for improving copper recovery, where apparent viscosity is the main factor affecting the separation of matte/copper from the slag. The viscous behavior of

    Nov 7, 2022

  • SME
    Using Simulation to Quantify Uncertainty in Ultimate-Pit Limits and Inform Infrastructure Placement (cfb5b753-1dd1-4b26-ba46-16856224ab1e)

    By M. Deutsch, E. González, M. Williams

    "Uncertainty exists in ultimate-pit limits due to geologic variation and unpredictable economic landscapes. In this work, we show how this uncertainty affects the ultimate pit and how it can be analyz

    Jan 1, 2015

  • SME
    Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions

    By Ergin Arioglu, Werner Burger

    "SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp

    Jan 1, 2016

  • SME
    Metallogenesis of Central America

    By Enrique Levy

    The publication from which this paper was abstracted is the first at-tempt to correlate all the metallogenic deta compiled by the author for the preparation of the 1:2,000,000 Metallogenic Map of Cent

    Jan 1, 1971

  • SME
    Stability mechanism and control technology for fully mechanized caving mining of steeply inclined, extra-thick seams with variable angles

    By Hongwei Wang, PEIPEI CAO, Yongping Wu, JIANQIANG JIAO

    In the fully mechanized top caving mining of steeply inclined, extra-thick seams with variable angles, the mechanisms of roof rock movement, failure, caving and filling are highly complex. This is due

  • SME
    Minesite - Resource Analysis Results

    By W. C. Brice

    Minnesota contains a major copper-nickel resource. In anticipation of requests by industry to develop this resource, the Minnesota Department Of Natural Resources has developed a computerized resource

    Jan 1, 1980