    The Use of Electronic Detonators to Control Air Blast

    By Andy Hudson, Stuart Brashear, David Lilly

    Because of greatly increased timing accuracy, electronic detonator systems are a well-known and widely accepted major tool to control and reduce ground vibration. At a Southeastern quarry the authors

    Jan 1, 2009

  • ISEE
    Difficulties and Suggestions when Drilling and Blasting in a Karst Environment

    By James T. Ludwiczak

    Drilling and blasting in a Karst (sinkholes and mud seams) environment has long been a problem for blasters, miners, quarry operators, contractors, and developers. While one cannot change the geologic

    Jan 1, 2005

  • ISEE
    Mine Expansion Towards Blast Sensitive Areas

    By Scott G. Giltner, Alex Schwenk

    An iron operation sought to extend the life of the mine by conducting a major pit pushback in an area close to several public structures and the neighboring town. The result of the pushback would make

    Jan 21, 2025

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • ISEE
    Blasting Related Aggregate Size Optimization

    By John Cory, Ran Tamir

    Blasting data analytics are being increasing used to increase mining productivity, reduce mining costs, maximize high margin aggregate products, and to reduce fines. Three examples will be illustrated

    Jan 1, 2012

  • ISEE
    Gurney’s Journey—pipe-bomb Fragments And Fumes

    By Michael Wieland

    The thrust of this report is to overcome some of the technical deficiency in the scientific methodology that correlates the work output during a charge explosion to the resulting toxic fumes. Thermody

    Jan 1, 2010

  • ISEE
    Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity

    By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang

    A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr

    Feb 1, 2020

  • ISEE
    A non-toxic, safe and reliable non-primary-explosives detonator

    By Marco Antonio Falquete

    Conventional detonators and blasting caps make use, as igniters, of flame-shock-, andfriction-sensitive primary explosives, such as lead azide, lead styphnate, mercury fulminate, etc, most of them sev

    Jan 1, 2007

  • ISEE
    Fire Protection Provided by Detonator Containers

    By Lon D. Santis

    The Code of Federal Regulations Title 30, Parts 56, 57, 75, and 77 require that detonators and explosives be separated by four inches of hardwood or equivalents when transported together in mines. Thi

    Jan 1, 1997

  • ISEE
    Design of a Passive Underwater Pressure Gauge

    By S. Lim, G. Walsh, V. Romero

    The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i

    Jan 1, 2009

  • ISEE
    Improved Blasting Economics at an Uzbekistan Copper Mine

    By Viktor Aranovich, Thomas E. Brown

    The Almalyk Integrated Mining and Metallurgical Plant is located near Tashkant in Uzbekistan and is one of the former Soviet Union's largest copper producers. Almalyk consumes about 10,000 metric tonn

    Jan 1, 1998

  • ISEE
    Impact of the Mine to Plant Methodology on the Global Profitability of the Mining Industry

    By Ronald Ticona

    Generally, the drilling and blasting operation are managed independently to the processing plant outcomes. Therefore, the technical segmentation to determinate the ore drill and blast designs do not i

    Feb 6, 2023

  • ISEE
    Problem Boulders, Big and Bigger

    By Jerry Wallace

    Two recent-release boulders posed serious threats to public transportation and utilities in Washington State. Both required challenging drilling and blasting solutions.

    Jan 1, 1997

  • ISEE
    Drill and Blast Optimization at the Sparkhule Limestone Quarry

    By Paul L. Matrin

    This paper will discuss the recent and on-going drill and blast optimization measures at the Sparkhule Limestone Quarry, which have resulted in a 44% reduction of drill and blast unit costs per ton of

    Jan 1, 2004

  • ISEE
    Using an Electronic Detonator System and Expanded Blast Patterns to Prevent Sympathetic Detonation at Powder River Basin Coal Mine

    By Joseph Haid, om, Rio Yang, Kelly Fleetwood

    Some coal mining operations in the Powder River Basin are currently observing a number of blast holes detonating sympathetically within their cast blasts. Sympathetic detonation can cause poor cast re

    Jan 1, 2005

  • ISEE
    Vibration Data Analysis to Increase Slope Adhesion

    By August Ferraz Ribeiro, Guilherme Dias Mendona, Paula Henrique Lisboa, José Silvio Corsini

    Correct slope adhesion is related to the conformity of the slope’s real geometry to slope planning. It is very important in mining because slope design has economic and safety implications. Slope desi

    Feb 6, 2023

  • ISEE
    A New Blast Vibrations Analysis Methodology

    By Francisco Sena Leite, Raquel Sobral, Vinicius Gouveia de Miranda, Céu Jesus

    "The urgent need for improvements in the control and mitigation of environmental and social conditions associated with the extraction and processing of raw materials is increasingly a demand imposed b

    Jan 1, 2017

  • ISEE
    Marvel Loch – Core and Shell Mass Blast

    By Joseph Hoang, Nick Reed, Scott Wishart, Michael Lovitt

    Marvel Loch Underground forms part of St Barbara Limited’s Southern Cross Operations which is located 360km (224 miles) east of Perth. Southern Cross Operations produces approximately 120,000 ounces o

    Jan 1, 2012

  • ISEE
    Increasing El Toro Mining Productivity through the Application of Massive Blasting Techniques while Reducing Environmental Impact on Neighboring Communities

    By César Ugaz Castañeda, Paulo Fernández Alvarado, Richard Sotomayor Oblitas, Rocke Enríquez

    Mina El toro has been making substantial changes in its operation to improve its social impact and productivity. Because of the use of gasified emulsions and electronic initiation system, it was possi

    Feb 1, 2020

  • ISEE
    Optimization of Blast Evacuation Zones using the "Exclusion Zone" Module

    By C. Morel, P. Fredes, L. Rojas

    This article presents a comprehensive study on the development and application of the specific module called "Exclusion Zone" created by Orica to determine blast evacuation exclusion zones. This modul

    Jan 1, 2024