Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Standardizations of Execution and Quality Control on Piling and Deep Mixing MethodBy Masaki Kitazume, Yoshiaki Kikuchi
"Abstract Pile foundation is one of fundamental techniques to improve the bearing capacity and settlement characteristics of superstructures. Wide varieties of piles having various shape, size and mat
Jan 1, 2014
-
Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - SummaryBy Alec C. Bloem
A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of
Jan 1, 1991
-
Working Platforms In Geotechnical Jobs: Recommendations For Execution And MaintenanceBy Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
Application Of High-Strength Concrete To Drilled Shafts - 1. SummaryBy A. E. Fiorato
A test program was conducted to evaluate use of high-strength concrete in drilled shafts (caissons). The objective of the program was to determine if internal temperatures developed during cement hydr
Jan 1, 1991
-
Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During Earthquakes (Student Paper Competition 2010)By Arash Khosravifar
The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).
Jan 1, 2010
-
A New Analysis Of Data From Statnamic Tests On Piles In ClayBy William F. Anderson
A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre
Jan 1, 2006
-
Design Of The Foundation Of Zhu Jiang Fanying High-Rise Building Complex ? SynopsisBy A. F. Deng
A general description of the project, mainly the pier foundation design of the ZHU JIANG FANYING is presented in the paper. The major contents include the foundation scheme, the evaluation of bed-rock
Jan 1, 2010
-
Anchored Pile Foundations In British ColumbiaBy Cory J. E. Yacyshyn
Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t
Jan 1, 2004
-
Sheetpile Installation Vibration StudyBy Kenneth A. Pidgeon
This paper presents a case history on mitigating vibration problems associated with the installation of steel sheetpiles. The project in-cludes installation of steel sheetpiles for a utility trench wi
Jan 1, 1995
-
Drilled Piers With Base Preloading By Grouting - 1. IntroductionBy Boleslaw A. Klosinski
Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile
Jan 1, 1995
-
Critical Evaluation of Indian Standard for the Design of Laterally Loaded PilesBy Sanket Rawat, Ravi Kant Mittal, Vikash Prasad
"The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p
Jan 1, 2017
-
The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok SubsoilBy Narong Thasnanipan
This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w
Jan 1, 2006
-
Soil Profiles Along The Alignment Of The I-880 Replacement ProjectBy Mark A. Willian
The purpose of this short paper is to present soil profiles and basic soils information for the portion of the I-880 Replacement Project alignment where highway structures are to be built. The informa
Jan 1, 1996
-
Reduction Of Local Scour Around Cylindrical Bridge Piers Using Upstream Protective PilesBy A. K. Bhattacharya
Cylindrical bridge piers are widely used and equations exist that can predict the maximum depth of local scour around such piers. Scour around piers is an undesirable phenomenon, as it requires the fo
Jan 1, 2009
-
Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scadinavian Development ProjectsBy K. Viking
This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and
Jan 1, 2005
-
Bore Pile Stabilization Issues in Offshore Marine WorksBy Nuno Cruz, Saúl Rodríguez
"When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work
Jan 1, 2017
-
Resonance Test On Piles - SynopsisBy Y. Z. Xu
This paper presents a new dynamic method called Resonant Pile Test (HPT) for evaluating bearing capacity of pile. The basic conception of RPT is given in brief and the measuring system is also introdu
Jan 1, 2010
-
Soil Displacement Caused By Pile Driving In ClayBy K. Rainer Massarsch
The effects of soil displacement caused by pile driving on adjacent piles and structures are discussed. A method is proposed to estimate the point of force equilibrium which makes it possible to calcu
Jan 1, 1989
-
Three-Dimensional Stability Analysis Of Vertical Shafts In Homogenous SoilsBy Reza Y. Khaksar
Presented is a rigorous solution for the three-dimensional stability analysis of vertical shafts (excavations) subjected to the self-weight of the soil based on the upper-bound theorem of limit analys
Jan 1, 2006
-
Performance Of Non-Displacement And Displacement Piling, Adelaide Convention Centre, South AustraliaBy Felix Cheng
Extensions to the Convention Centre in Adelaide, South Australia consisted in part of construction over the existing railway system comprising nine rail lines and passenger platforms. Vibro-pile (Aust
Jan 1, 2002