Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Dynamic hydraulic shovel simulator for improved machine performance

    By S. Frimpong

    Hydraulic shovels are widely used for primary production in surface mining operations. Variability in material diggability, unstructured mining environments and limited space and operator inefficiency

    Jan 1, 2005

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles

    By L. Bloomquist

    This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t

    Jan 1, 2004

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles (8e8c3b94-ac75-4947-840c-a59d92585998)

    By L. Bloomquist, C. Arnoldi

    "This paper describes how Automated Mining Systems (AMS) is evolving the state-of the- art in guidance systems for autonomous underground vehicles. The techniques, tradeoffs, and lessons learned from

    Jan 1, 2004

  • CIM
    UNIMAX SD100 Depressant - A Cyanide Replacement

    By T. Schmidt, J. Merza

    "This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse

    Jan 1, 1992

  • CIM
    Tensile Strength Anisotropy of Barre Granite

    By F. Dai

    Granitic rocks usually exhibit strongly anisotropy due to pre-existing microcracks induced by geologic loadings. The understanding of the rock anisotropy in mechanical properties such as tensile stren

    May 1, 2009

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    The Application of the Marconaflo Slurry System to Mineral Processing and Extraction

    By N. W. Kirshenbaum

    "The Marconaflo slurry system was originally developed to reduce costs and solve technical problems in the marine transport of mineral cargoes. In the short time since its inception, it has been found

    Jan 1, 1973

  • CIM
    Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines Limited

    By G. Halverson, K. Blower

    "Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per

    Jan 1, 1987

  • CIM
    Recent Advances and Applications of Radiometric and Photometric Sorting

    By J. R. Goode

    "Coarse ore sorting is here defined as the physical separation of a mixture of coarse (+3/8 inch) ore particles into two or more separate groups of total value greater than that of the unsorted ore. A

    Jan 1, 1975

  • CIM
    Dust Collection at The Carol Project, Iron Ore Company of Canada

    By H. Rozovsky

    This paper deals with the large iron ore concentrating plant owned by the Iron Ore Company of Canada. The plant is part of the Carol Project, which is being developed in the Wabush area of western Lab

    Jan 1, 1962

  • CIM
    Brunswick Mine SAG Mill Liner Design and Wear

    By Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah

    "An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent

    Jan 1, 2003

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009

  • CIM
    Processing of Refractory Sulphides at Mantos de Oro, Chile

    By John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.

    "Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow

    Jan 1, 2009

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    Hydraulic Hoisting & Long Distance Pumping of Coal

    By R. E. McElvain

    "Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.

    Jan 1, 1978

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    A Review of Advanced Control Applications in Mineral Processing

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "This paper provides a critical review of the development and application of advanced controls in mineral processing at the industrial level. These algorithms can be sub-divided into four broad catego

    Jan 1, 1992

  • CIM
    Supporting Robust Strategic Underground Mine Decision-Making

    By Tarrant Elkington

    Underground mine planning practices are typically manual and time consuming and will often produce sub-optimal solutions due to the application of generic rule-of-thumb assumptions or ?tried and teste

    May 1, 2010