Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical OperationsBy A. Khan
The purpose of this paper is to demonstrate the value of identifying and optimizing throughput constraints by utilizing a Constraint Model. This will be achieved by first understanding the overall con
Aug 1, 2013
-
Busbar Section OptimizationBy D. P. Ziegler
Formulas relating economic optimum busbar cross sectional areas to busbar cost, electric price and financial parameters are reviewed and revised. Application of the formulas is illustrated with discus
Jan 1, 2006
-
The Geological Survery of CanadaBy F. W. Gray
Foreword: It is not my purpose, in this address, to write the history of the Geological Survey of Canada, which has from time to time been reviewed by the officers of the Survey itself, and by men m
Jan 1, 1932
-
Study of Elemental Sulfur Formation in the Fluid Bed Dryer BaghouseBy J. Lui
Inco Copper Cliff Smelter commissioned two new Inco flash furnaces in 1991/1993 as part of its S02 abatement program. Each flash furnace is equipped with a fluid bed dryer. The ~ 12 wt% water content
Jan 1, 2007
-
Cape Breton Development Corporation - Victoria Junction coal preparation plantBy J. G. Martin, J. C. Campbell
THE VICTORIA JUNCTION 31,4-million-ton coal preparation complex went into operation in October 1976."' It is designed to produce a metallurgical coking coal by lowering the sulphur and ash content of
Jan 1, 1985
-
Protection of Magnesium Alloys by Keronite Plasma Electrolytic OxidationBy S. Shrestha
Magnesium-based alloys are of growing interest for many industrial applications due to their favourable strength-to-weight ratio and excellent castability. Mass reduction has advantages in many indust
Jan 1, 2006
-
Experimental Investigation on Dilation Mechanism of Ultra-Heavy Oilsands from Xinjiang OilfieldBy Botao Lin, Yan Jin, Hongjuan You, Jingjun Pan, Huiwen Pang, Mian Chen, Sen Chen
"Steam Assisted Gravity Drainage (SAGD) has become the mainstream technology for ultra-heavy oil recovery in Xinjiang oilfield, the success of which depends heavily on shortening of preheating period
Jan 1, 2015
-
Studies on hot working and microstructure evolution of aluminum alloys in RussiaBy D. S. Salonine
Aluminum alloys offer a wide range of capability with a unique combination of advantages that makes them the materials of choice for numerous products and markets. One of the most important applicatio
Jan 1, 2004
-
Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov FurnaceBy L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov
Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in
Jan 1, 2007
-
The Eastern Contact Zone of the Coast Range Batholith on the Stikine RiverBy Forrest A. Kerr
The subject of the Coast Range batholith and its eastern contact zone needs no introduction to British Columbia mining men. Because of its reputed potentialities, this zone has aroused much interest.
Jan 1, 1928
-
The Copper SituationBy Arthur Notman
Since addressing the Institute a year ago on The Future of the Copper Industry (l), many things have happened, most of them bad. It has been a hard year for profits and prophets. It was, therefore, wi
Jan 1, 1932
-
Uranium deposits* of the Bancroft area, OntarioBy J. W. Griffith
"The mines in the Bancroft area of southeastern Ontario, a few kilometres west of the town of Bancroft, are in Faraday and Cardiff Townships. Three companies, known as Canadian Dyno Mines Limited, Mac
Jan 1, 1986
-
Gold Deposits of the Afton-Scholes Area, OntarioBy E. S. Moore
GOLD was discovered previous to the year 1900 on the east shore of Emerald lake, Afton township, Timagami Forest Reserve. It was found in a small cavern in banded iron formation, close to the water&ap
Jan 1, 1936
-
Leaching Characteristics of Nickeliferous Pyrrhotite Tailings from the Sudbury, Ontario AreaBy Elizabeth Edwards, Radhakrishnan Mahadevan, Vladimiros G. Papangelakis, Srinath Garg, Kurtis Judd
Mineralogical characterization of the tailings showed the deportment of Ni to be similar in the Vale and Glencore tailings, with 60% of the total Ni locked in pyrrhotite, and the balance 40% associate
Jan 1, 2017
-
Biopolymer Addition to Boost Recovery and Throughput in Gold Leaching Processes. A Case Study from Antam Pongkor, IndonesiaBy Rolf Andreas Lauten, Adam Pratomo, Dani Ramdani, Helminton Sitanggang
A universal challenge for the mineral processing industry is the diminishment of high grade ores. Instead, low grade ores, sometimes also containing problematic gangue minerals is the reality. With lo
Jan 1, 2014
-
The halide mediated electro-oxidation of ammonia, cyanide, cyanate and thiocyanate in mine/mill waste watersBy D. J. MacKinnon, Kazi E. Haque
Ammonia present in a variety of mine/mill waste waters was almost completely oxidized to nitrogen by chloride mediated electro-oxidation. A closed circuit operation of preconcentration of ammonia on a
Jan 1, 1996
-
Determining of Drivetrain System Skid Steer 6x6 Wheeled Robot LoadBy Lopatka. M. J.
This paper presents the results of 3 tons skid steer 6x6 wheel robot drive system field tests. The aim of the investigation was verification of assumed data for drivetrain diesain and forces identific
Aug 1, 2013
-
Structured Analysis ? An Important Tool for Understanding and Describing Complex Mining SystemsBy Mario A. Morin
Mine design, planning and scheduling is a very complex, iterative process comprising several interrelated and interdependent activities. Understanding how this process works, identifying the critical
May 1, 2002
-
Commissioning and Operation of the Copper Cliff Weak Acid Treatment PlantBy T. Xue
429 As part of Inco's S02 abatement project for its Sudbury operations, a weak acid treatment plant (W ATP) was commissioned at the Copper Cliff smelter in August of 2004 to treat the weak acid
Jan 1, 2006
-
Comparison and Analysis of the Deformation Taken Place at the North Board of the Open Pit Copper Mine Asarel Registered by the Geotechnical Radar System Msr-300 and the Survey LandmarksBy Kr. N. Karparov
Measurements made with high precision GPS landmarks and geotechnical radar Reutech MSR- 300 associated with the observed movements in the north face of Assarel Mine, where on a horizontal distance of
Aug 1, 2013