Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Problems Encountered in Dewatering a Nigerian Coal Mine

    The only functional underground Coal Mine in Nigeria is located in Enugu in Anambra State. For some years now the mine has been beset with a perenial problem of flooding. This has hampered produc- t

    Jan 1, 1988

  • AUSIMM
    The Load-Bearing Process of Fully Coupled Rock Bolts

    The paper focuses on how rock bolts are loaded in different rock masses, as well as in pullout tests. Three analytical models for rock bolts are presented in brief, one for bolts in continuously defor

    Jan 1, 2000

  • AUSIMM
    Decline Excavation by Roadheader at Ballarat East

    By Dorricott M. G

    Ballarat Goldfields NL is developing an exploration decline at Ballarat East using a Mitsui Miike S-125 roadheader. To-date, 530 in of advance has been achieved at an average rate of 16.1 m/week. Ro

    Jan 1, 1995

  • AUSIMM
    Recent Developments in the Gravity Concentration of Gold at Peko Mines LTD, Warrego N.T.

    From August 1962 to June 1976 Peko Mines Ltd. produced Gold Bullion at the Peko Control Mill using 18x24 Denver Mineral Jigs and strake tables. Gold ores treated during this period were obtained fr

    Jan 1, 1978

  • AUSIMM
    The Use OF Synthetic Polymer As A Drying Aid In Pelletizing (5a431b5e-3741-4ee5-b8f2-2d3b5f851251)

    A new watersoluble binder for mineral ore pellets has been developed by the sulfonation of bituminous materials. A highly effective binder for iron ore pellet making is obtainable from bituminous mate

    Jan 1, 1974

  • AUSIMM
    Raise Drilling in Australian Coal Measures

    By Fraser RJ

    A Robbins Raise Drill Model 61R was used to provide one 7' diameter shaft 1050' deep in Clutha Development's exploratory mine at Blackwater in Central Queensland and two 7' diam

    Jan 1, 1972

  • AUSIMM
    Sodium Sulphite As A Sulphide Depressant-Theory And Practice At The CSA Mine Concentrator, Cobar, NSW

    Cobar Mines Pty. Limited (CMPL) uses sodium sulphite as the principal depressant to attain selectivity in copper flotation prior to sequential recovery of lead and zinc. The usage of sodium sulphi

    Jan 1, 1983

  • AUSIMM
    The Big Bend and Cobra Molybdenum Prospects - A Comparison

    The Big Bend and Cobra molybdenum prospects which occur near the margin of the Karamea Batholith in the Northwest Nelson molybdenum province are compared. The Big Bend Prospect is a 3000 m by 800 m ar

    Jan 1, 1979

  • AUSIMM
    Transition to Sulphide Treatment - Laboratory Testwork to Operations

    As the oxide reserves in an oxide/sulphide deposit are exhausted transition to the treatment of sulphides should be investigated in detail and well before processing the sulphide ore commences. The

    Jan 1, 1989

  • AUSIMM
    Submarine Hot Springs, Cold Seeps, and Serpentinte Diapirs on the Pacific Rim

    Fluid circulation occurs in oceanic crust of all ages, at the seafloor spreading axis, on mid-ocean ridge flanks, in the ocean basins, and in subduction zones. In the first three settings the fluid or

    Jan 1, 1990

  • AUSIMM
    Construction and Maintenance of Underground Mine Roads

    By Seedsman R. W

    Good roads are essential in moving men and materials to and from the underground workplace. Coffey Partners International Pty Ltd (Coffey) has recently completed a underground coal industry funded p

    Jan 1, 1995

  • AUSIMM
    Geotechnical Shaft Reconciliation at Oyu Tolgoi, Mongolia

    By A Purvee, M F. Lee, L J. Mollison

    Oyu Tolgoi is a large Cu-Au porphyry deposit in the south Gobi desert, Mongolia. The first of several deep, large-diameter, concrete-lined shafts, Shaft 1, is nearing completion. It will have a finish

    Jan 1, 2008

  • AUSIMM
    Zinc Extraction and Refining

    Australia has been an important producer of zinc minerals and metal for many years.Late in the last century Edgar A. Ashcroft, a versatile and enterprising electrical engineer proposed the treatment o

    Jan 1, 1985

  • AUSIMM
    Digital Simulation Model of Sub-Level Caving

    By Ham G. I, Just G. D

    The model considers a range of design parameters and operating condit- ions and evaluates the significance of these in the ultimate design of a mine. It also considers organizational features associ

    Jan 1, 1974

  • AUSIMM
    Water Supply at the Warrego Mine, Tennant Creek, Northern Territory (533fe125-f87f-451f-a8a7-f8cc9efcc262)

    By Ride G

    The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in and areas of Aust

    Jan 1, 1980

  • AUSIMM
    Analytical Method for Gold

    Obtaining correct assays for gold determinations relies on the correct methods being chosen and the assayer being made aware of the mineralogy of the sample and its general origin. Usually when a geol

    Jan 1, 1986

  • AUSIMM
    The Design of Carbon-in-Pulp Plants

    The efficient design of carbon-in-pulp (C.I.P.) plants involves the integration of both process engineering and design engineering.Many recently constructed plants have not recognised the above interr

    Jan 1, 1986

  • AUSIMM
    The Manufacture of Ferro Manganese and Alloy Steels in the Electric Furnace

    In recent years, the. art of electric steelmaking has received a great deal of attention, and naturally, much controversy has existed from time to time regarding the relative merits of different pract

    Jan 1, 1951

  • AUSIMM
    Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken Hill

    By Johns AS

    Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.

    Jan 1, 1978

  • AUSIMM
    Underground Mining Operations at The Selwyn Project

    Since the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill

    Jan 1, 1988