Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Red mud to green iron – proposed pathway for iron elution via bioleaching of bauxite residueBy A Tolley
Bauxite residue or ‘red mud’ is a by-product of the Bayer Process, the primary process of alumina refining. Due to its high alkalinity and variable composition, its storage and disposal poses high env
Sep 18, 2023
-
How Details of the Geometallurgical Optimisation Influence Overall ValueBy S Matos Camacho, K G. van den Boogaart, R Tolosana Delgado, U Mueller
"The precise formulation of a geometallurgical optimisation problem is by necessity a simplification of reality. It includes implicit choices such as data availability or mining block geometry. Additi
Jun 15, 2016
-
Logistics in Mining Towards 2000 'The Low Cost Provider'A combination of the needs of business, employee desires and safety and health considerations is stimulating increasing attention to the time spent by people at work and the timing of that work. Pa
Jan 1, 1996
-
Combining the power of computational thermochemistry with the convenience of Python within the digital platforms of SMS group GmbHBy S Khadhraoui, T Yusuf, C Kirmse, E Hecker, R Degel, A Akouch, N Borowski, M Reuter
For an optimal design and control of metallurgical processes, a deep understanding of the thermodynamics of the governing reactions is required. Modelling the thermochemical behaviour of those reactio
Jun 19, 2024
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Olympic Dam mine closure planning processBy G Hill, D Grant, M Tyler
Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered
Jul 25, 2018
-
Monitoring of M10000 IsaMill™ Process Performance by Passive Acoustic EmissionsBy A McEwan, J Masters, C A. Jackson, A Catanzano, V Sharp, M Millen, S Rainey, S J. Spencer, G Roberts
A passive acoustic emission (AE) monitoring system has been developed and trialled on two M10000 IsaMillsTM. The analyser detects AE stress waves generated by grinding media impacts with the mill line
Sep 1, 2014
-
Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°CBy E Jak, G Khartcyzov, M Shevchenko
The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco
Jun 19, 2024
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)By MacDonald AJ, Raffield MP
The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin
Jan 1, 1998
-
A New Metaheuristic Algorithm for Long-Term Open Pit Production PlanningBy C Niemann-Delius
The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new
Sep 26, 2011
-
Mineralogical Quantification of Iron Ore SinterBy S Hapugoda, J Manuel, E Donskoi, L Lu
Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det
Jul 13, 2015
-
Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems ProblemsThe paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t
Sep 26, 2011
-
The Inter-dependence of Mining and Mineral Beneficiation Processes on the Performance of Mining ProjectsBy McKee D. J
Much research is aimed at providing a revolutionary advance in technology that has the potential to render current mining and beneficiation problems obsolete. Such revolutionary advancements have b
Jan 1, 1994
-
Australia and it's Minerals Industry-Sharing the Same FutureIn Australia we usually define "resource" in purely material terms, and rarely relate it to intellect and human capacity. We look at the sheer abundance of our natural resources and are satisfied w
Jan 1, 1986
-
Process mineralogy of Tarkwaian paleo placer gold deposit in GhanaBy E A. Agorhom, M Beyuo, C Owusu, I Quaicoe
Understanding the mineralogy and liberation of gold particles in an ore is key to the development and optimisation of gold processing operations, being cyanidation or gravity separation. This can be a
Aug 24, 2022
-
Relating Textural Attributes to Mineral Processing - Developing a More Effective Approach for the Cadia East Cu-Au Porphyry DepositBy R Berry, S G. Walters, J A. Hunt, D Collett
The texture of an ore type is fundamental in understanding the metallurgical behaviour of an ore. This study will show examples of how quantified textural attributes (mineral shape, grain size and min
Jan 1, 2008
-
Computerised in Project ManagementWith the advent of the mini computer and the relational database project management has experienced a new lease of life. The project manager no longer has to wait days for his reports, and he doesn
Jan 1, 1983
-
Design and Operation of Backfill Silos for Reliable High Solids Concentration DischargeThis paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri
Jan 1, 1998
-
Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse RejectCoal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr
Jan 1, 1998