Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ventilation of an Open Pit Iron Ore Mine in the Pilbara Region of Western Australia

    By Mouritz M

    Ventilation characteristics and the occurrence of nocturnal surface inversions have been investigated within the Mount Whaleback open cut iron ore mine at Newman in Western Australia. When winds ar

    Jan 1, 1988

  • AUSIMM
    Unpredictable Gassiness Changes During Longwall Extraction

    By Kerkhoff G, Wood J

    The maximum gas emission into underground workings can be predicted by the use of established methods which have world wide recognition. Changes in gas emission and the influence of the gas and g

    Jan 1, 1988

  • AUSIMM
    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical Aspects

    The paper describes the geotechnical as- pects of design and construction of two 12 m diameter concrete lined tunnels from the start of design to completion of construction. Prob- lems occurred due

    Jan 1, 1981

  • AUSIMM
    Characterisation of Ilmenites from Western Eucla Basin Heavy Mineral Concentrates

    By G J. Sparrow, M J. Fisher-White

    A mineral and chemical characterisation study was conducted on ilmenite-rich heavy mineral concentrates sourced from the western sector of the Eucla Basin in southern Australia. Test work involved usi

    Jan 1, 2008

  • AUSIMM
    Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHAS

    By Thompson D, Burgess G. C

    Subsequent to large scale trials in 1987, the installation of a submerged lance Sirosmelt furnace system was approved in late-1988 for the cupellation of retort bullion to dore silver. Commissioning

    Jan 1, 1992

  • AUSIMM
    Fundamental Study on Fracturing Grouting for Shaft Lining Reinforcement at Deep Alluvium Seam in Eastern China

    Many problems result when coal mine shafts are built in complicated geological conditions and serious shaft lining ruptures have often occurred in the eastern part of China since 1987. Grouting is app

    Dec 6, 2010

  • AUSIMM
    The Soft Ground Bored Tunnel Under Sydney Airport

    The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway

    Jan 1, 1999

  • AUSIMM
    Copper Skarn Deposits in Eastern China (92f36f50-d094-4edf-add9-cf3f94eac5a1)

    In eastern China, most of the copper skarn deposits occur in folded troughs which are controlled by the EW-trending faulted fold systems (the Pal-Asian geotectonic domain), and the NNE-trending rift

    Jan 1, 1995

  • AUSIMM
    Natural Gamma Logging as an Aid to Iron Ore Exploration in the Pilbara Region of Western Australia

    By Walraven F, Knott G. G

    Using a typical small logging instrument (Neltronic KPD), a natural gamma reference section for part of the Brockman Iron Formation and part of the Mt. McRae Shale has been established in the Newma

    Jan 1, 1973

  • AUSIMM
    The Melbourne Underground Rail Loop Overall Tasks and Organisation

    By Watson F. G

    As an introductory paper of a series on the Melbourne (Australia) Underground Rail Loop extension to the extensive electrified suburban railway system the paper outlines the need for the Loop, leg

    Jan 1, 1981

  • AUSIMM
    The Application Of Low Energy Anfo At Dolphin Mine, King Island Scheelite

    King Island is situated at the western approach of Bass Strait and approximately mid way between Victoria and Tasmania. The scheelite orebodies lie within the south east of the island. Ore bearing

    Jan 1, 1977

  • AUSIMM
    Grade Recovery Optimisation Using Data Unification and Real Time Gross Error Detection

    By R Linares

    The efficient operation of any modern metallurgical facility depends on the accurate measurement and estimation of flow rates, inventories, and composition of their intermediate and final products. Al

    Jan 1, 2005

  • AUSIMM
    Clay Quantification of Channel Iron Deposits (CID), Pilbara, Western Australia

    By E R. Ramanaidou

    The presence of clays in channel iron deposits (CID) within the Pilbara region of Western Australia causes problems in the classification and subsequent processing of the iron ore. In particular, the

    Jan 1, 2007

  • AUSIMM
    What Women in Mining Want

    With the next mining boom looming, the industry will once again struggle to meet skills needed as the current generation boomers are set to retire. In order to meet these needs it is going to need to

    Jun 1, 2010

  • AUSIMM
    Challenges on the Front End Activities of the Uranium Fuel Cycle - Areva's Approach

    Energy is central to respond to critical stakes on human and industrial development requirements as well as on climate change. The increase of the share of carbon-free energy sources in the global sup

    Sep 13, 2010

  • AUSIMM
    Managing floor heave in an underground longwall coal mine

    By P Corbett, P Sheffield

    Springvale Mine is an underground coal mine in the western coalfield of New South Wales which utilises retreat longwall mining technique. The mine encountered significant gateroad floor heave issues d

    Nov 30, 2018

  • AUSIMM
    Development of a damage/failure mechanisms database for Kazakhstan underground mining industry

    By A Mortazavi, M Akhmedya

    Mining is recognised as being one of the most dangerous industries in the world due to the difficult working conditions. Working in such hazardous circumstances in an underground mine often results in

    Nov 29, 2022

  • AUSIMM
    The Role of Advanced DEM Based Modelling Tools in Increasing Comminution Energy Efficiency

    By R Morrison, P Owen

    Particle breakage is an essential part of mineral processing. The aim is to reduce run of mine mineral ore to an optimal size for liberating target minerals and for subsequent recovery by separation p

    Jan 1, 2004

  • AUSIMM
    Museum Station -Structural and Architectural Design

    By Simpson D, Skopakow J

    This paper is one of the series of papers relating to the Melbourne Underground Rail Loop and specifically describes the structural and architectural design of Museum Station. Structural arrangeme

    Jan 1, 1981