Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Contour banks in spoil rehabilitation – a matter of timing

    By J L. Merritt

    Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t

    Jul 25, 2018

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • AUSIMM
    Process Design Aspects at Bendigo Mining's Gold Operations

    By T E. Hayward, D H. English, S J. Smith

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Cadia East Open Pit Project Mining Study

    The Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea

    Jan 1, 2007

  • AUSIMM
    Derivation of High Reliability Water Quality Guideline Values for Cobalt in Freshwaters – Improving Water Quality Guidelines for Better Water Quality Compliance Management in Mining

    By F Butler, G E. Batley, A C. Hogan, A R. Butler

    The ANZECC/ARMCANZ (2000) Water Quality Guidelines (the Guidelines) are the primary reference used in Australia and New Zealand for managing and regulating water quality. For most mining operations in

    Jun 28, 2016

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Application of an Active Treatment System for the Reduction of Acidity and Dissolved Metals From Acid Sulfate Soil Drainage Waters

    By M D. Melville, B C. T Macdonald, J Dixon

    The acidic and metal rich waters that are generated from acid sulfate soil (ASS) drainage can have damaging impacts upon ecosystems. The most obvious impact has been the discolouration of water and oc

    Jan 1, 2003

  • AUSIMM
    The Obuasi Mine - Longitudinal Retreat Mining Method Application and Challenges

    By F Owusu-Mensah, F Nsarko

    The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple

    Mar 26, 2012

  • AUSIMM
    The Spent Pot Lining Treatment and Fluoride Recycling Project

    By G Swayn, J Harpley

    Spent Pot Lining (SPL) is an unavoidable waste product of the electrolytic process in the smelting of aluminium. SPL is considered to be a hazardous waste in various countries because it contains sign

    Jan 1, 2002

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    Non-Destructive Analysis of Diamond Core for Light Elements using Niton Field Portable X-ray Fluorescence

    By P Martin, A Somarin, S Bailey

    Field-based research was conducted to investigate the performance of field portable X-ray fluorescence (FPXRF) in the analysis of reverse circulation (RC) drill chips in iron ore exploration. For year

    Aug 12, 2013

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    A Methodology for Rock Mass Characterisation to Control Blast-induced Vibrations

    By A Karrech, E Hamdi

    The uncertainty of geomaterials properties is commonly encountered in resource engineering applications, especially in mining engineering where the rock mass texture, joints, fractures and damage zone

    Aug 24, 2015

  • AUSIMM
    Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater Quality

    By C Linklater, J Chapman, A Watson

    Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl

    Jun 28, 2016

  • AUSIMM
    Mid Sampling and Reserve Estimation Practice in the Base Metal Orebodies

    The Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr

    Jan 1, 1987