Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development of a Cover System Design for Potentially Acid-Forming Tailings at Peak Gold MinesBy M, C Silveira, C Ellice, D Christensen
Peak Gold Mines (PGM), a member of the Rio Tinto Group, is an underground and open cut gold mining operation located near Cobar, NSW. A multi-phase study was initiated in 2001 in support of developing
Jan 1, 2003
-
The Structural and Hydrodynamic Framework for Epithermal ExplorationBy M A. Etheridge
The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous deform
Jan 1, 1995
-
Pressure Oxidation Performance at Porgera: 1995 to 1997By Raudsepp R
Since 1991, the Porgera Joint Venture has processed refractory sulphide flotation concentrate by pressure oxidation with the subsequent gold recovery, from the washed residue, via a conventional lea
Jan 1, 1997
-
Forecasting Life-of-Mine Deformation and Seismic Potential at Rosebery Mine Using a Mine Scale Non-Linear Numerical ModelBy W Zirima
A detailed, mine scale non-linear numerical model of Rosebery mine has been built for the purpose of simulating life-of-mine global deformations. The model was calibrated using observations of displac
Jan 1, 2008
-
A practical guide to sampling in coal preparation plantsBy B W. Atkinson, J Docherty
An Australian Working Group has been compiling a guide for operators to use in order to improve the efficacy of their routine and non-routine sampling tasks within their coal preparation process. The
May 9, 2017
-
Overview of a New Mine Development at Gordonstone - An Interdisciplinary ApproachBy Quemard D, Troncoso J
The Gordonstone Project with a capital cost in excess of $500 million will become the largest underground coal mine in Australia. The project development decision was taken on 31 July, 1990 and at
Jan 1, 1991
-
The Development of a Zinc-Based Touch-Up Solder for General Galvanised ProductsBy Zervoudis J
Limitations of current touch-up solders for galvanised steel include coating thickness control problems and poor corrosion and abrasion resistance as well as health and environmental concerns due to
Jan 1, 1993
-
Grinding Circuit Improvements at Evolution Mining’s Edna May OperationBy D Atheis, S Williams, A Dance, D Taplin
"Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant
Sep 1, 2014
-
A case study: how being ‘aware of now’ is making work safer at Telfer undergroundBy S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle
Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper
Mar 15, 2021
-
Developing an evaluation method for bulk ore sortingBy S Dykes, R J. McCarthy, B Klein
There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),
Nov 10, 2020
-
Use of Metallurgical Test Data in Resource Evaluation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Jul 11, 2011
-
Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community RelationshipBy N Boughen, K Moffat, L Brooks, A Zhang
In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese
Jun 28, 2016
-
Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation DrillingBy M Goers, M Almond
"The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w
Aug 21, 2012
-
Bulk Solids SamplingBy J E. Powalisz
Obtaining a representative sample of bulk materials in process industries is critical to providing valid data for process control and custody transfer (valuation). The accuracy of a sample, that is to
Jul 29, 2014
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modellingBy S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
Observations on the Mineral Constitution of the Broken Hill LodeThe occurence of high silver values in the oxidised zone of the main lode at Broken Hill is well known as a large factor in achieving the early fame of Broken Hill, and the minerals of this zone form
Jan 1, 1926
-
Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)By D Audeyev
The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op
Oct 5, 2011
-
The Benefits of Mine Scale Three-Dimensional Structural Modelling at Macraes Mine, Central Otago – A Case StudyBy A J. Daniels
Macraes Mine is a large-scale open-cut and underground gold mine located in Central Otago, on the South Island of New Zealand. This paper presents the role of geological mapping in the grade control p
Aug 22, 2011
-
Valid spontaneous combustion hazard assessment for surface mine environmental impact statementsBy J Theiler, B Beamish
Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope
Jul 25, 2018
-
Open Pit Transition Depth Determination through Global Analysis of Open Pit and Underground Mine Production SchedulingBy K Dagdelen, I Traore
This paper presents an iterative net present value (NPV) maximisation method to determine the optimum surface to underground transition depth for an orebody to be mined by multiple open pits and an un
Nov 24, 2014