Engineering the New Olympic Dam Backfill SystemBy A G. Grice
WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur
Jan 1, 2000
-
Improving Safety and Production – The Transition to Electronic Detonators at George Fisher MineBy M Breen
In 2009, George Fisher mine began to seriously consider the transition from pyrotechnic detonators to electronic detonators. Initially, the electronic detonators were used for complex crown shots or a
Nov 8, 2011
-
Mineral Supply Chain Optimisation under Uncertainty Using Approximate Dynamic ProgrammingBy R Dimitrakopoulos, C Paduraru
The optimisation of mine complexes and related value chains is a challenging problem due to the simultaneous presence of a highly-dimensional decision space, integer decision variables, non-linear con
Nov 24, 2014
-
An Investigation of Expanding Split Sets in Weak GroundBy G Davison, C Rossimel, M Bouazza
Expanding rock bolts anchor within a rock mass more efficiently than non-expanding varieties. This is of great importance in weak ground conditions, where grouted friction bolts perform less efficient
Mar 24, 2014
-
Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold ProjectBy D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie
Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi
Nov 5, 2014
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo
Jan 1, 2007
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Assessment of lifter effect on tumbling mill dynamics using CFD-DEM coupling approachBy K Mayank, A N. Mainza, I Govender, M Narasimha, A Mittal
In mineral processing industries grinding is the most energy-consuming process. A tumbling mill is an essential grinding equipment widely used for particle size reduction. Power consumption, impact fo
Aug 24, 2022
-
Data cross validation for a newly commissioned dynamic drop test facilityBy D W. Evans
Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M
Nov 29, 2022
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectBy R Godard, J Gantumur, F Prince, C Pascoe
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera
May 9, 2016
-
Improving tungsten recovery through the reuse of mine wastewaterBy Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen
Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the
Aug 24, 2022
-
Photogrammetry-based mapping techniques in slope stability managementBy T Wang, D Wang
Photogrammetry-based techniques supported by traditional mapping tools are more frequently used for open pit geotechnical mapping. It fundamentally involves the collection of geological, structural an
Nov 29, 2022
-
Mines versus Mineralisation – Deposit Quality, Mineral Exploration Strategy and the Role of ‘Boundary Spanners’By J P. Sykes, T C. McCuaig, J E. Vann
Resources added to the global metal inventory through exploration over the past 15 years have been generally of poor quality (declining grades, recoveries and lack of acceptable financial return). Sim
Aug 18, 2014
-
A new look at detrital iron deposit geology of the Hamersley Province of Western AustraliaBy C Simpson, J M. F Clout, G Plummer
Detrital iron deposits (‘DID’) in the Hamersley Province of Western Australia have been successfully mined and processed as small quantities of saleable standalone or blended lump and fine ore product
Nov 8, 2021
-
High-Grade Optimisation and Improved Grade Control Practices in Mount Tom PriceBy B Morey, J Gordon, P Mackenzie
Mount Tom Price Mine is peerless amongst Rio Tinto iron ore resources around the world. It has provided Hamersley Iron with premium quality, high lump yield haematite ore over the last four decades. T
Jan 1, 2002
-
Creating the Optimal Coal Working SectionBy P Lukic
The definition of the working sections that will be used in a mine is usually initially made in the field by the geologist supervising the drilling program. These initial definitions are often made on
Sep 26, 2011