Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Trigger Action Response Plans for Diesel Exhaust Exposures

    By J Jeffery, P G. Knott, F Velge, C Evans

    A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.

    Aug 31, 2015

  • AUSIMM
    A Review of BHP - Utah Coal Limited's Dragline Stripping Operations

    BHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut

    Jan 1, 1989

  • AUSIMM
    Multiparallel Fan Method to Prevent Significant External Air Leakages through a Goaf Area of a Shallow Covered Coalmine

    By F Wu, H Wang, W Chen

    A pressurisation method with multiparallel fans has been adopted at HongLiuLin Coalmine to control the significant external air leakage through the goaf area of coalface 15207. Potential damaging effe

    Aug 31, 2015

  • AUSIMM
    Options for Concentrate Drying Technologies when Designing a Copper Smelter

    By H Lehtonen, H Mansikkaviita

    In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect

    Jan 1, 2006

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    Evaluation of Exploration Projects

    It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment

    Jan 1, 2007

  • AUSIMM
    Visual Communication of Geological Confidence - A Move Toward a Less Subjective Approach

    By J Seery, N Savage, A Wilson, L Nicholas

    Geological modelling provides a means of spatially representing the three dimensional distribution of geological information to downstream stakeholders. The geologist completing the modelling work int

    Aug 12, 2013

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    Investigation of silica removal by reverse flotation to improve quality of mixture concentrates produced through spiral gravity separation and Slon-VPHGMS process

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    This research was done to reduce silica from mixed hematite concentrate of Barfkar Iron Ore Sample and increase Fe grade using reverse flotation method (Depressing Hematite and floating Silica). The u

    Aug 24, 2022

  • AUSIMM
    Geohazmap Implementation in Block Cave Mines

    By S Talu, E Savage, S Howe

    Major falls of ground, strainbursts, airblast and mudrush events are the major hazards in block caving environments, resulting in both safety and financial consequences and losses. Rio Tinto mines hav

    May 9, 2016

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Organic Management Structure – Its Advantages in a Mining Consultancy

    By G Pitkin, D Sorley

    The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga

    Jun 22, 2016

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011

  • AUSIMM
    Integrating Sustainability Principles into Mineral Processing Plant Design

    By G Corder

    Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to

    Aug 8, 2011

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Glass Earth's Greenfields Gold Discovery Strategy Using Multi-Faceted Airborne Geophysical Surveying is Poised to Rewrite the Geology Of Central Otago

    By S Henderson

    The Otago Goldfield has produced approximately 8 million ounces of alluvial gold and over 2.5 million ounces of hard rock gold and is currently home to New ZealandÆs largest producing gold mine. In th

    Jan 1, 2007

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Quantifying iron ore ‘handleability’ to reduce processing plant delays

    By P Cherepanskiy, G Elphick, R Hus, C Perring

    When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate

    Jun 22, 2022

  • AUSIMM
    Slime waste to boost agricultural productivity

    By A K. Bhatnagar, S Saha, P Dixit, A K. Mukherjee, P Patra

    TATA Steel’s R&D Division at Jamshedpur has developed a slime beneficiation process to recover iron values from iron ore slime. This process recovers iron ore concentrate containing 2.2 per cent alumi

    Sep 18, 2023

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011