Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Comparison of Experiment and Simulation of Blast Loading on the Steel BeamBy A Hosseinzadeh Barforoosh, A Abedi, M Taji
The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t
Aug 24, 2015
-
The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines LimitedBy Onton W
During the latter part of 1936, conditions encountered in sinking the Main Ore shaft made it impractical and uneconomical to continue deepening it to serve haulage levels below the present No. 5
Jan 1, 1988
-
Telepresence – the application of remote control and automation technologies for increased safety and productivityBy J Cronin
For the last decade, we have read about the great technical innovation that is coming to the mining industry that will increase safety and productivity. There is consensus that it will be a technical
Oct 16, 2017
-
Design considerations for an iron tailings filtration plant and their conveying and disposal systemsBy C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez
In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for
Nov 8, 2021
-
Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle MineBy G B. Smith
Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot
Mar 21, 2011
-
Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground MineBy B Ganesia, H Sahupala
PT Freeport Indonesia is a copper-gold mine operation located in West Papua, Indonesia about 3500 km east of Jakarta. Current ore production is about 270 000 tpd, of which 30 000 tpd comes from underg
Jan 1, 2002
-
Planning and Installation of the New Underground Winder (No. 2 Hoist) on the Rosebery Mine Inclined ShaftThis paper traces briefly the reasoning which led to the decision to extend the existing internal shaft at the Rosebery Mine and to instal underground a larger winder (No. 2 Hoist) with capacity to ha
Jan 1, 1958
-
Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?By E J. Cowan
Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore
Aug 22, 2011
-
Dephosphorisation of Limonitic Concentrate by Roasting, Acid Leaching and Magnetic SeparationBy K Ionkov
The oolitic iron ore reserves in Lisakovsky, North Kazakhstan represent quite a challenging deposit both from a technological and from a resource point of view. The difficulties in processing such typ
Jul 11, 2011
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand ContextBy E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
Improved Cleaner Circuit Design for Better Performance Using the Jameson CellBy R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro
In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily
Sep 1, 2014
-
The role of fleet management in reducing carbon emissions from haul trucksBy D Prior
The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie
Jun 22, 2022
-
Scientific and Technological Developments in Extractive Metallurgy - Copper and Nickel ExtractionBy Flavelle IV
A survey is made of changes in the technical status of a number of western world copper extraction and refining operations over the past 20 years. Specific developments in pyro- and hydro-metallurgy a
Jan 1, 1985
-
Water Accountability and Efficiency at a Base Metals RefineryBy K G. Harding, A Osman, A du Toit, F K. Crundwell, C M. Sheridan
"Most mineral processing plants have high water requirements for their operational activities. These plants often function in an environment where water is becoming increasingly scarce. An increase in
Nov 26, 2013
-
Ventilation Planning Considerations when Dealing with Hot GroundwaterBy S Bluhm, L van den Berg
In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer
Aug 31, 2015
-
Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter frameworkBy K Smith
This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be
Jul 1, 2021
-
One Mile Underground – Mining the N3500 Orebody at Mount Isa MinesBy I Özen, G Chitumbura
A paper identifying anticipated challenges in the extraction of the N3500 Orebody at Glencore Xstrata Copper’s Mount Isa Copper Operations was written in 2007. The paper identified the depth of the de
Mar 24, 2014
-
Social licence to operate – circular economyBy L Schürmann, R Kendall
Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e
Jun 22, 2022
-
E48 Cave Extension at NorthparkesBy L Snyman, S Webster and J Samosir
Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant, which produces h
May 9, 2016
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014