Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Paper No. 198. Mount Morgan Practice in Recording And Estimating Ore Tonnages And Values.By Thomas G. A
THE irregularity of the Mount Morgan (Queensland) ore body presents problems other than those only of mining. For irregularity of outline is coupled with irregularity of grade, and the ore varies so r
Jan 1, 1911
-
Geology - Paper No. 3 Applicaton Of Aerial Gamma Radiation Spectrometry In Australian Mineral ExplorationIn order to understand the technique, basic theoretical principles of radiation emission and in- strumentation theory are reviewed. Methods of surveying, reduction of data and interpretation are outl
Jan 1, 1969
-
The Behaviour of Indium During Jarosite PrecipitationBy Mingmin Dou
The behaviour and deportment of indium during the precipitation of sodium jarosite from Fe2(S04)3 - Na2SO4 solutions were investigated. Indium is readily precipitated with sodium jarosite, and the e
Jan 1, 1993
-
Determination of Blast Induced Damaged Zones in Pillars by Seismic ImagingBy Theophili CN, Kapenis AP
Seismic tomographic imaging has been applied to determine the blast induced damage zones in bauxite pillars in underground mining. At the retreating stage, when pillar dimensions are reduced from 8
Jan 1, 1995
-
Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mineBy A Nugraha, H Thanasekaran, K Tatetdagat
The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa
Aug 29, 2018
-
Permitted Explosives for the 21st CenturyBy D Chalmers
Drill and blast mining techniques are used to mine coal outburst prone and high gas content coals in Australia. As the risk of an outburst is increased in high gas content coal, it is considered that
Jan 1, 2007
-
Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WAThe Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about
Jan 1, 1990
-
Improvements in the Understanding and Applications of Backfill for Improving Ground Stability in Underground and Open Pit OperationsThe safety culture in mining has progressed towards a zero tolerance of injury. This change has required that some historically inherent risks of mining are engineered out or reduced. One of the signi
Jun 1, 2010
-
Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface MinesBy J Joy, A Bye, G V. Kizil
This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s
Sep 18, 2012
-
The Technology of FlotationThere are two mechanisms in the flo- tation process by which particles are transported from the pulp to the con- centrate: bubble-mineral aggregation and entrainment. It is the chemical processes w
Jan 1, 1984
-
Mine Planning for Coal Project DevelopmentBy Westcott PC
The development of a coal project must pass through a number of phases, taking it from a preliminary evaluation through to detailed mine planning. For each phase the cost of data acquisition and a
Jan 1, 1983
-
Practical Management of Progressive Large Failures at Minerals and Metals Group Century MineMinerals and Metals Group (MMG) Century mine (Century) is a large open-cut mine in northwest Queensland approximately 2.5 km long, 1.5 km wide and 240 m deep, with an ultimate pit depth of 320 m. In 2
May 1, 2010
-
A National Code for Reporting Coal Resources and ReservesIn November 1986 the Australian Minerals and Energy Council (AMEC) endorsed an "Australian Code for Reporting Identified Coal Resources and Reserves" for use by the Federal and all State Governments
Jan 1, 1987
-
Submarine deposits of base and precious metals in Papua New GuineaThe deep seafloor in Papua New Guinea's proposed Exclusive Economic Zone appears to be a gold-rich province in the same sense as the territory above sea level. Two significant sites with polymeta
Jan 1, 1994
-
Making use of potentially contaminating mine waste in cover designBy N Jamson, T K. Rohde
The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a
Jul 23, 2018
-
This Life of Mine - Personal Reflections on The Well-Being of the Contracted Fly-In, Fly-Out WorkforceBy R Goater, P Kirsch, S Goater, I Goater
With staff productivity and retention a crucial factor in the longevity of AustraliaÆs mining industry, some mining companies are increasing their focus on the health and well-being of their people, t
Sep 18, 2012
-
Prokaryotic Arsenic Metabolism ù Roles in Arsenic Cycling and BioremediationBy J M. Santini, I C. A Streimann
Arsenic is a naturally occurring element in the environment and is toxic to biological systems. Arsenic can exist in the environment in the following redox states, arsenite (+3), arsenate (+5), arsine
Jan 1, 2004
-
On Structural Analyses of Oriented Bore Cores from the West Wallsend No.2 Colliery HoldingStructural analyses of oriented bore core sections from the West Wallsend No.2 Colliery Holding together with investigations in adjac- ent collieries and on the surface delineated structural phenome
Jan 1, 1972
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980
-
Dampier Port Upgrade Project - An Overview of Engineering, Procurement and Construction Management Project ManagementBy A Radici, S Russell
The Dampier Port Upgrade was completed in 2007 and is the largest project in Rio Tinto Iron Ore's expansion program. The project doubled Dampier Port's iron ore shipping capacity over a five
Jan 1, 2009