Search Documents

  • SME
    Environmental Issues And Research Associated With MTR Mining In West Virginia

    By S. S. Peng, C. T. Holland

    Mountain Top Removal (MTR) mining started in West Virginia nearly thirty years ago. This surface mining method can extract multiple coal seams as thin as a few inches thick with total recovery and min

    Jan 1, 2000

  • CIM
    Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian Orogen

    By K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy

    "Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri

    Jan 1, 2008

  • ABM
    ESTUDO DA SUBSTITUIÇÃO TOTAL DA MAGNÉSIA POR RESÍDUOS REFRATÁRIOS MgO-C EM REFRATÁRIOS CONFORMADOS DA MESMA CLASSE

    By Diógenes Albert Gomes

    Neste trabalho são apresentados os impactos físicos e mecânicos da reciclagem de insumos refratários compostos por óxidos de magnésio ligado ao carbono, visando à reutilização destes como matéria prim

    Aug 16, 2017

  • IIMP
    Empleo del carbón activado en procesos de concentración por flotación

    By C. Villachica

    El presente texto refiere la aplicación del carbón activo como reactivo en las soluciones de los procesos de concentración por flotación minera. La justificación de su uso es porque la mayor selectivi

    Oct 14, 1980

  • SME
    Cross-Borehole Geophysical Probing For Site Characterization

    By R. J. Lytle

    INTRODUCTION Prior to excavation in soil and rock, it is useful to know the subsurface structure. This is important information both for safety and for equipment scheduling reasons. It is useful to

    Jan 1, 1979

  • SAIMM
    The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium ? Synopsis

    By W. S. Steinberg

    In 1963, the full-scale engineering study for the development of an iron, steel, and vanadium plant was initiated. This was the birth of Evraz Highveld and its process flow as it is known today. Highv

    Jan 1, 2011

  • SAIMM
    Kinetic Studies On The Leaching Reactions In The Autoclave Circuit Of The Tati Hydrometallurgical Demonstration Plant

    By B. D. Paphane

    Since the commissioning of the Tati Hydrometallurgical Demonstration Plant (HDP), which produces Ni and Cu cathodes as well as Co salt from sulphide concentrate employing Activox® technology for leach

    Jun 1, 2013

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study

    By M. C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles an

    May 1, 2005

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study (6b80a653-d0e2-439c-a343-5c05fb591d61)

    By G. Righettini, G. Desrivières, P. Mousset-Jones, R. Lacroix, M. C. Bétournay, P. Laliberté, S. Hardcastle

    "Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles a

    Jan 1, 2005

  • SAIMM
    Techno-Economic Optimization Of Level And Raise Spacing In Bushveld Complex Platinum Reef Conventional Breast Mining

    By C. Musingwini

    The Bushveld Complex is economically significant and strategically important to South Africa, thus it is imperative that optimal extraction of platinum group metal (PGM) resources on the Bushveld Comp

    Jan 1, 2010

  • SME
    Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f

    Jan 1, 2009

  • SAIMM
    Effect Of Process Control Agent (PCA) On The Characteristics Of Mechanically Alloyed Ti-Mg Powders - Synopsis

    By C. Machio

    This paper reports the results of a study to determine the effect of process control agent (PCA) on the characteristics of Ti-Mg powders during milling. It has been shown that a 2% increase in PCA con

    Jan 1, 2011

  • IIMP
    Maximizando Valor con VDC/BIM en Proyectos de Paradas de Planta

    By Juan Mayta

    Dada la situación actual y escenario post COVID-19, es fundamental adoptar estrategias de Gestión Colaborativa e Integrada de Proyectos, este artículo es el resultado de la aplicación de Virtual Desig

    Sep 29, 2023

  • AUSIMM
    Improving safety through technology – Orica wireless electronic blasting system trials at Ernest Henry Mine

    By S Thomson, M Lovitt, T Purvis, C te Kloot, T Nguyen, Z Liu

    Ernest Henry Mine (EHM), located in north-western Queensland, is an underground copper/gold sublevel caving operation currently producing over 6 Mt/a of ore. The mass mining method of sublevel caving

    Oct 16, 2017

  • DFI
    Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft Carrier

    By Michael Quadagno

    Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t

    Jan 1, 2008

  • IIMP
    El costo del transporte de mineral

    By Miguel Ángel Zúñiga Castillo

    El presente texto señala la importancia del transporte minero como actividad en el sistema de costeo. En ese sentido, este se divide en transporte al interior de la mina y al exterior de ella. El prim

    Nov 24, 1986

  • CIM
    Advancing Asset Performance at the Montcalm Operation

    By Juan Anes, Dominic Fragomeni, Tim Edwards, Dave Scott, Simon Yu

    "The Montcalm concentrator operation was successfully commissioned in fall of 2004 at the Xstrata Copper’s Kidd Creek Metallurgical Site, Timmins. The start-up met or exceeded the Type 1 profile as de

    Jan 1, 2009

  • ISEE
    Evaluating Delay Effects on Ground Vibrations with Simulated Vibration Waveforms

    By Randall M. Wheeler

    It is important to be able to quantify the effects of blast delay designs on vibration characteristics. White was the first company to develop commercially available software, called Alpha-Blast, for

    Jan 1, 1994

  • SAIMM
    A Lining Management System For Submerged Arc Furnaces

    By Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert

    What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st

    Jan 1, 2007

  • CIM
    Electric-Pulse Disaggregation (Epd), Hydroseparation (Hs) and Their Use in Combination for Mineral Processing and Advanced Characterization of Ores

    By Vladimir N. Rudashevsky, Louis J. Cabri, Nikolay S. Rudashevsky, Thomas Oberthür

    "EPD (Electric Pulse disaggregation) and HS (hydroseparation) are exceptional technologies for research, concentration, evaluation, and mineral extraction of specific minerals such as precious metals

    Jan 1, 2008