Search Documents

  • SAIMM
    Slope Monitoring Strategy At PPRust Open Pit Operation

    By M. J. Little

    Potgietersrust Platinums Ltd (PPRust) is Anglo Platinum?s only open pit operation. The major slope stability concern at PPRust is rapid, small-scale brittle failure on the west wall of Sandsloot open

    Jan 1, 2006

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • TMS
    Numerical Model Of The Temperature Field And Heterogeneity Of A Casting Of Ductile Cast-Iron

    By F. Kavicka

    An original application of ANSYS simulated the forming of the temperature field of a massive casting from ductile cast-iron during the application various methods of its cooling using chills. The nume

    Jan 1, 2006

  • NIOSH
    OFR-17-80 Development Of Cross Pit Overburden And Waste Material Handling System (Phase II)

    By Russell J. Gartrell

    This report describes the engineering feasibility and economic advantages of using a steep angle conveyance (SAC) system in conjunction with medium and large draglines to transport spoil in a typical

    Jan 1, 1977

  • NIOSH
    RI 7698 Optimizing Decomposition Of Carbonyl Sulfide In An Electrical Discharge

    By Larry A. Haas

    Carbonyl sulfide (COS) was decomposed to sulfur and CO in a silent electrical discharge. A threshold of about 4 kv at 60 Hz was required to dissociate the gas in a laboratory ozonizer at 790 torr with

    Jan 1, 1972

  • NIOSH
    OFR-113B-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume III: Mine Safety Management

    By R. V. Ramani

    One area of study in the Coal Mine Injury Analysis project was to illustrate and enhance the ability of mine safety management personnel to apply analytical techniques to injury experience data and to

    Jan 1, 1993

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • IIMP
    Algunas consideraciones sobre el empleo de las membranas filtrantes en la colección y análisis de muestras de polvo

    By Aníbal Castañaga Coll

    El presente trabajo refiere los resultados de las pruebas sobre el empleo de las membranas filtrantes en la colección y análisis de muestras de polvo. De los resulados, se encontró que las muestras de

    Jul 20, 1961

  • SAIMM
    Comparative Seismology Of The Witwatersrand Basin And Bushveld Complex And Emerging Technologies To Manage The Risk Of Rockbursting

    By R. J. Durrheim

    The seismicity of the Witwatersrand Basin and Bushveld Complex has been analysed, revealing significant differences in source and damage mechanisms. A comparison of mining taking place at similar dept

    Jan 1, 2005

  • ISEE
    Mini-Bench Blasting Applicability at the Excavation for Foundation in Settlement

    By Sadettin Bagdatli, Ali Kahriman, Umit Ozer, Alper Celtikci, Yucel Karakus

    Due to population growth and rapid urbanization in Turkey, the need for the construction of residential units, transportation and infrastructure facilities has become increasingly more pressing. Since

    Jan 1, 2014

  • NIOSH
    OFR-82(1)-75 Probe Drill Guidance System - Volume 1

    By Llewellyn A. Rubin

    Under Bureau of Mines Contract H0122007, Telcom, Inc., with the assistance of Fenix & Scisson, Inc., conducted a 17-month research and development project aimed at provid¬ing a field-test model of a g

    Jan 1, 1973

  • CIM
    Economics and Perspectives of Underground Backfill Practices in Canadian Mines

    By E. De Souza

    Two comprehensive surveys, which focus upon backfill practices and the economics of backfilling in underground mines in Canada, have been conducted. The two surveys were designed to assess operational

    May 1, 2003

  • NIOSH
    RI 8519 Effects of Humidity on Salt Mine Dust: A Preliminary Report

    A preliminary study was conducted by the Bureau of Mines to determine the effect of humidity on salt mine airborne dust levels. Results showed less dust where the humidity was elevated. Dust reduction

    Jan 1, 1980

  • NIOSH
    RI 6051 Explosion Hazards Of Diethyl Ether

    By Michael G. Zabetakis

    The spillage of liquid diethyl ether in rooms at floor level and 3 feet above the floor resulted in flammable vapor-air mixtures in the immediate vicinity of the exposed liquido The liquid temperature

    Jan 1, 1962

  • SAIMM
    Application of an environmental valuation approach that incorporates externality costs in sustainability decision-making of the metallurgical sector - Synopsis

    By M. Nyoka

    Consideration of the economic, environmental, and social impacts associated with the life-cycle of a technology is of increasing importance for decision-making in industry. It has been suggested that

    Jan 1, 2007

  • NIOSH
    OFR-79-84 Development Of A Hydride Fuel System For Underground Mine Use - Hydride Fuel System For Underground Mine Use Development And Testing

    By Ned Baker

    Details are given of a Hydride Fuel System to provide 5 kg of HZ to fuel a Caterpillar 3304 engine previously modified to operate on hydrogen fuel and intended to power an underground mining vehicle.

    Jan 1, 1983

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007

  • NIOSH
    IC 9504 - Keeping Knees Healthy in Restricted Work Spaces: Applications in Low-Seam Mining

    By Susan M. Moore

    Many challenges are faced by workers in lower-seam (42 inches or less) mines. The lower-seam heights confine mine workers to their knees as they perform their daily tasks such as installing roof bolts

    May 1, 2008

  • NIOSH
    RI 8726 Fire and Explosion Properties of Oil Shale

    By J. K. Richmond

    This is a progress report summarizing more than 5 years of a long-range Bureau of Mines research program. The purpose of this program has been to investigate the fire and explosion properties of Green

    Jan 1, 1982

  • NIOSH
    OFR-130-78 Time Resolved Audio Dosimeter System

    By Gordon R. Sima

    This contract is concerned with the construction of a Time Resolved Audio Dosimeter System consisting of one readout unit and several dosimeter units. The Time Resolved Audio Dosimeter System was desi

    Jan 1, 1977