Search Documents

  • DFI
    Deep Jet Grouting Grids for Support of a 42-Story Tower Designed Using Performance-Based Seismic Design

    By Scott A. Walker, Roberto A. Lopez, Lori A. Simpson, David A. Shook

    500 Folsom Street is part of the new Transbay neighborhood in San Francisco, which is being redeveloped after the 1989 Loma Prieta Earthquake damaged a freeway viaduct; removal of the viaduct created

    Jan 1, 2018

  • IIMP
    Aclimitación a la altura

    By Alberto Hurtado

    El presente texto refiere los aspectos fisiopatológicos y clínicas que comprende un ambiente de mayor altitud para el organismo, así como que las dificultades en la adquisición, transporte y utilizac

    May 1, 1975

  • AUSIMM
    Winding Machinery on the Bendigo Goldfields

    In the Bendigo district, with its large number of comparitively small leases worked by separate companies, we might naturally expect to find many different arrangements of winding machinery and, as a

    Jan 1, 1902

  • AUSIMM
    Contamination of Samples for Analysis When Using Ring Grinder Mills

    Ore samples generally require preparation before analysis. Serious problems can occur with contamination degradation and particle size effects. Both grinding element contammation and sample cross cont

    Jan 1, 1978

  • SAIMM
    A New Bubble Pick-up Technique as a Rapid Flotation Test Method

    By A. F. Lee

    A pick-up apparatus capable of yielding quantitative results has been described. Studies of some collector-mineral systems have been presented to illustrate the versatility of the apparatus and prove

  • NIOSH
    IC 7670 Drainage And Utilization Of Firedamp ? Origin And Nature Of Firedamp

    By J. Venter

    The history of firedamp is the same as that of coal: The initial stage was the accumulation of vegetation, which was converted into peat under certain local conditions, then lignite, bituminous coal,

    Jan 1, 1953

  • DFI
    Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction

    By D. Michael Holloway

    The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-

    Jan 1, 1995

  • NIOSH
    MLA 72-85 - Mineral Resources Of The Burnt Lodge Wilderness Study Area, Phillips And Valley Counties, Montana ? Summary

    By J. Douglas Causey

    In 1984, at the request of Bureau of Land Management, the U.S. Bureau of Mines studied the 13,730-acre Burnt Lodge (MT-065-278) Wilderness Study Area (WSA) in order to evaluate the mineral resources.

    Jan 1, 1985

  • SAIMM
    Reconstruction time of a mine through reliability analysis and genetic algorithms - Synopsis

    By M. Kumral

    A mining system consists of many sub-systems such as drilling, blasting, loading, hauling, ventilation, hoisting and supporting. During mining operation, these sub-systems may experience various probl

    Jan 1, 2009

  • AUSIMM
    The New Updraught Sinter Plant at Mount Isa Mines Limited

    As part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The

    Jan 1, 1968

  • ISEE
    Blast Optimization of Hard Ores at Phu Kham Open Pit

    By Wayne Rogers, Kell Monro, Arthur Pacunana

    The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o

    Jan 1, 2018

  • DFI
    Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge

    By Jacob Chacko

    The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new

    Jan 1, 2002

  • NIOSH
    OFR-13-78 Engineering & Economic Evaluation Underspoil Haulage In Area Strip Coal Mines - Part II

    By Joseph L. Jordan

    Coal is essential to America?s future energy needs. To meet these needs mining methods must be safe, economical, and environmentally acceptable. Belt conveyor systems for coal haulage from surface min

    Jan 1, 1977

  • CIM
    Mine Waste Management Planning for an Arctic Environment

    By William J. Purdy

    Successful design, operation and completion of a surface waste management facility for a diamond mine located in Canada?s northern environment requires careful planning to minimize short and long term

    May 1, 2004

  • NIOSH
    OFR-50-76 Survey On Protective Canopy Design - 1. Introduction

    By R. Farrar

    The survey work on protective canopy design was conducted in a 2-month period commencing November 15, 1973. The reported re¬sults under this contract are intended to provide guidance to coal mine oper

    Jan 1, 1974

  • NIOSH
    RI 3122 Tests on Brick Klins Fired With a Stoker

    By R. R. Falier, W. E. Rice

    "PURPOSE OF REPORTThis paper presents the results of a series of tests made by the U. S. Bureau of Mines in cooperation with The Ohio State University Engineering Experiment Station as part of an inve

    Aug 1, 1931

  • SME
    Members See the Latest in Technology at SME Exhibit

    By Georgene Renner, William R. Yernberg, Steve Kral

    ABB provides integrated pro-cess control, optimization and information systems, drives and power-distribution equipment as well as other services and support to the mining industry. ABB also supplies

    Jan 1, 2004

  • NIOSH
    Third-Quarter National Economic Activity And Fourth-Quarter Outlook - Third-Quarter 1987

    By Joan Weinberg

    The economy continued to expand during the third quarter, as real GNP rose at a seasonally adjusted annual rate of 3.8%, up from 2.5% in the second quarter (table 1). Continued job gains (see below),

    Jan 1, 1987

  • ISEE
    Overburden Blast Cast Designs, Economics and Case Histories

    By Conny Postupack

    The first principle one usually learns about blasting is that competence in this field is best gained by experience in making blasts rather than by reading a book or by listening to a lecture. The rea

    Jan 1, 1991

  • IIMP
    La renovación de la metalurgia extractiva del cobre

    By Felipe De Lucio Pezet

    El presente trabajo describe el proyecto de renovación en la metalurgia extractiva del cobre donde se buscó mejorar la ley de sus concentrados, específicamente de Cobriza. Asimismo, este permitiría o

    Jul 1, 1987